1252 WHITE PLAINS ROAD
BRONX · BIN 2024896
💬 Discuss this project
1930Year Built
2Stories
C0Building Class
R5Zoning
1,500 sfGross Floor Area
3Units
Three families · 2,277 sf lot · 0.66 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 32p · 1 filing · 7 docs
Floor 24p · 1 filing · 7 docs
Floor 13p · 1 filing · 7 docs
Sub-Basement1p · 1 filing · 7 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/10/2025$500K—Private party → Private party$333/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MAZ DESIGN LLC209/02/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MAZ DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAZ 247 CORPGeneral Contractor107/08/2026
IPS PLUMBING CORPPlumbing107/08/2026
Building Lifecycle
All (6)Filed (2)Permit Issued (2)Inspection (1)Special Inspection (1)
11/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/10/2025
Permit issued — Plumbing
X01262811-S1-PL
09/05/2025
Permit issued — General Construction
X01262811-I1-GC
09/02/2025
Filed — Alteration
REPLACE GAS STOVE WITH ELECTRIC STOVE AND REPLACE KITCHEN AND BATHROOM FIXTURE. AS PER PLAN
X01262811-S1
08/31/2025
Filed — Alteration
REPLACE GAS STOVE WITH ELECTRIC STOVE AND REPLACE KITCHEN AND BATHROOM FIXTURE. AS PER PLAN
X01262811-I1
07/29/2025
Special inspection requirement — Final
ABULKHAIR MORSHED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedIPS PLUMBING CORP09/10/2025
DOB NOWGeneral ConstructionPermit IssuedMAZ 247 CORP09/05/2025
1 project · most recent 09/02/2025
Gas Water/Sanitary
FiledStatusContractorScope
09/02/2025Permit IssuedIPS PLUMBING CORPGas, Water/Sanitary
1 project · most recent 09/03/2025
General Wiring
FiledStatusContractorScope
09/03/2025Permit IssuedEXPERT ELECTRIC.CONT NY IGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
07/29/2025FinalABULKHAIR MORSHEDprogress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/18/2026X01262811-S1Request digital key ↗
08/18/2026X01262811-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026X01262811-I1Open ↗
08/13/2026X01262811-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026X01262811-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026X01262811-I1Open ↗
08/13/2026X01262811-S1Open ↗