← Back
Over six families without stores
1254 FTELEY AVENUE
BRONX · Soundview-Bruckner-Bronx River · BIN 2130747
💬 Discuss this project
2022Year Built
4Stories
C1Building Class
R6Zoning
11,938 sfGross Floor Area
16Units
Rent Stabilized2 Open Violations ▸
Over six families without stores · Owner of record: POSTERUS REALTY LLC · 5,000 sf lot · 2.39 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Roof47p · 3 filings · 20 docs
Penthouse19p · 1 filing · 20 docs
Floor 454p · 2 filings · 20 docs
Floor 351p · 2 filings · 20 docs
Floor 253p · 2 filings · 20 docs
Floor 167p · 2 filings · 20 docs
Cellar20p · 1 filing · 9 docs
Site & exterior57p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REK REALTY5807/08/2026
POSTERUS REALTY LLC503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/16/2022$225K—Private party → POSTERUS REALTY LLC$19/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NODE ARCHITECTURE,ENGINEERING, CONS1711/20/2023
KNF SERVICES CROP111/30/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NODE ENGINEERING CONSULTING3203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW LINE CONSTRUCTION LLCGeneral Contractor1707/08/2026
GO PRO FIRE PROTECTION CFire Protection107/08/2026
N.B.A CONSTRUCTION INCGeneral Contractor107/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NODE ARCHITECTURE,ENGINEE67991111/20/2023
INTERNATIONAL GEOTEHCNICA1795709/27/2023
PINTO STUDIO INC6366210/17/2022
Building Lifecycle
All (106)Filed (18)Permit Issued (14)Signed Off (10)Violation (11)Inspection (13)Objection (10)Special Inspection (30)
11/18/2025
Violation issued (HPD, closed)
I
08/12/2025
Violation issued (HPD, open)
B
08/12/2025
Violation issued (HPD, open)
B
10/15/2024
Violation issued (HPD, closed)
C
10/15/2024
Violation issued (HPD, closed)
B
09/25/2024
Violation issued (HPD, closed)
A
09/25/2024
Violation issued (HPD, closed)
C
09/25/2024
Violation issued (HPD, closed)
C
09/25/2024
Violation issued (HPD, closed)
A
09/25/2024
Violation issued (HPD, closed)
A
04/18/2024
Violation issued (HPD, closed)
A
02/15/2024
Inspection — Pass-Final Construction Permit Withdrawal
Pass
View inspection ↗
01/24/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/14/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/24/2023
Special inspection requirement — Fire-Resistance Rated Construction
Radomir Delic
11/24/2023
Special inspection requirement — Air barrier - visual inspection
Radomir Delic
11/24/2023
Special inspection requirement — Metering
Radomir Delic
11/24/2023
Special inspection requirement — Lighting controls
Radomir Delic
11/24/2023
Special inspection requirement — Exterior lighting power
Radomir Delic
11/24/2023
Special inspection requirement — Maintenance information
Radomir Delic
11/24/2023
Special inspection requirement — Fenestration air leakage
Radomir Delic
11/24/2023
Special inspection requirement — Protection of exposed foundation insulation
Radomir Delic
11/24/2023
Special inspection requirement — Lighting in dwelling units
Radomir Delic
11/24/2023
Special inspection requirement — Air barrier — testing
Radomir Delic
11/24/2023
Special inspection requirement — Interior lighting power
Radomir Delic
11/24/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Radomir Delic
11/24/2023
Special inspection requirement — Energy Code Compliance Inspections
Radomir Delic
11/24/2023
Special inspection requirement — Fenestration areas
Radomir Delic
11/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Radomir Delic
11/24/2023
Special inspection requirement — Insulation placement and R values
Radomir Delic
11/20/2023
Filed — New Building
NEW HVAC SYSTEM INSTALLATION IN CONJUCTION WITH NEW BUILDING APPLICATION #X00719256-I1
X00719256-P3
11/20/2023
Special inspection requirement — Air barrier — testing
Radomir Delic
11/20/2023
Special inspection requirement — Fenestration air leakage
Radomir Delic
11/20/2023
Special inspection requirement — Insulation placement and R values
Radomir Delic
11/20/2023
Special inspection requirement — Energy Code Compliance Inspections
Radomir Delic
11/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Radomir Delic
11/20/2023
Special inspection requirement — Lighting in dwelling units
Radomir Delic
11/20/2023
Special inspection requirement — Maintenance information
Radomir Delic
11/20/2023
Special inspection requirement — Exterior lighting power
Radomir Delic
11/20/2023
Special inspection requirement — Metering
Radomir Delic
11/20/2023
Special inspection requirement — Fire-Resistance Rated Construction
Radomir Delic
11/20/2023
Special inspection requirement — Fenestration areas
Radomir Delic
11/20/2023
Special inspection requirement — Protection of exposed foundation insulation
Radomir Delic
11/20/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Radomir Delic
11/20/2023
Special inspection requirement — Lighting controls
Radomir Delic
10/30/2023
Signed off — New Building
NEW HVAC SYSTEM INSTALLATION IN CONJUCTION WITH NEW BUILDING APPLICATION #X00719256-I1
X00719256-S2
10/27/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/25/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
10/20/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/19/2023
Signed off — New Building
NEW HVAC SYSTEM INSTALLATION IN CONJUCTION WITH NEW BUILDING APPLICATION #X00719256-I1
X00719256-S3
10/19/2023
Signed off — New Building
NEW HVAC SYSTEM INSTALLATION IN CONJUCTION WITH NEW BUILDING APPLICATION #X00719256-I1
X00719256-S5
10/16/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
09/27/2023
Filed — New Building
NEW HVAC SYSTEM INSTALLATION IN CONJUCTION WITH NEW BUILDING APPLICATION #X00719256-I1
X00719256-P2
09/18/2023
Signed off — New Building
NEW HVAC SYSTEM INSTALLATION IN CONJUCTION WITH NEW BUILDING APPLICATION #X00719256-I1
X00719256-S4
08/23/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/18/2023
Signed off — New Building
NEW HVAC SYSTEM INSTALLATION IN CONJUCTION WITH NEW BUILDING APPLICATION #X00719256-I1
X00719256-S1
08/18/2023
Signed off — Alteration
Herewith Filing Roof Protection in Conjunction with NB # X00719256-I1
X00774464-I1
08/18/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/08/2023
Permit issued — Curb Cut
X00719256-S2-CC
06/29/2023
Permit issued — Protection and Mechanical Methods
X00774464-I1-PMM
Latest 60 of 106 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offNEW LINE CONSTRUCTION LLC07/08/2023
DOB NOWProtection and Mechanical MethodsSigned-offNEW LINE CONSTRUCTION LLC06/29/2023
DOB NOWMechanical SystemsSigned-offNEW LINE CONSTRUCTION LLC04/11/2023
DOB NOWSprinklersSigned-offGO PRO FIRE PROTECTION C03/17/2023
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR02/22/2023
DOB NOWSidewalk ShedSigned-offN.B.A CONSTRUCTION INC12/01/2022
DOB NOWStructuralSigned-offNEW LINE CONSTRUCTION LLC11/07/2022
DOB NOWGeneral ConstructionPermit IssuedNEW LINE CONSTRUCTION LLC11/02/2022
DOB NOWConstruction FenceSigned-offNEW LINE CONSTRUCTION LLC11/01/2022
DOB NOWGeneral ConstructionPermit IssuedNEW LINE CONSTRUCTION LLC10/05/2022
DOB NOWSupport of ExcavationSigned-offNEW LINE CONSTRUCTION LLC08/17/2022
DOB NOWSupport of ExcavationSigned-offNEW LINE CONSTRUCTION LLC05/13/2022
DOB NOWFoundationSigned-offNEW LINE CONSTRUCTION LLC05/11/2022
DOB NOWConstruction FenceSigned-offNEW LINE CONSTRUCTION LLC05/10/2022
1 project · most recent 11/20/2023
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/20/2023Signed-offNEW LINE CONSTRUCTION LLCAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric MSZ-FS09NA 9,000 BTU · Fan Coil Indoor ×38
MXZ-2C20NA2 18,000 BTU · Condensing Unit ×19
MSZ-FS06NA 6,000 BTU · Fan Coil Indoor ×18
MUZ-GL09NA 9,000 BTU · Condensing Unit ×6
MXZ-2C20NAHZ4 18,000 BTU · Condensing Unit ×19
MUZFSO9NA 9,000 BTU · Condensing Unit ×6
Ventilation
Panasonic FV-0511VKS2 100 CFM · Exhaust Fan ×2
FV-0510VS1 100 CFM · Exhaust Fan ×2
1 project · most recent 11/20/2023
Sprinkler System
FiledStatusContractorScope
11/20/2023Signed-offGO PRO FIRE PROTECTION CSprinkler System
1 project · most recent 11/20/2023
Storm Water/Sanitary
FiledStatusContractorScope
11/20/2023Signed-offINFINITI ESC PLUMBING CORStorm, Water/Sanitary
2 projects · most recent 03/22/2023
General Wiring
FiledStatusContractorScope
03/22/2023CompleteDENNISON ELECTRIC CORPGeneral Wiring
12/05/2022CompleteRICHARD NEU—
1 project · most recent 11/20/2023
Fence
FiledStatusContractorScope
11/20/2023Signed-offNEW LINE CONSTRUCTION LLCFence
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
02/15/2024Pass-Final Construction Permit WithdrawalPassView ↗
01/24/2024Fail-Final General Construction Non-Directive 14FailView ↗
12/14/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/27/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
10/25/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
10/20/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/16/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
08/23/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/18/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/14/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/14/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/14/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 73
DateRequirementInspectorRole
11/24/2023Fire-Resistant Penetrations and JointsRadomir Delicspecial
11/24/2023MeteringRadomir Delicenergy_progress
11/24/2023Protection of exposed foundation insulationRadomir Delicenergy_progress
11/24/2023Maintenance informationRadomir Delicenergy_progress
11/24/2023Interior lighting powerRadomir Delicenergy_progress
11/24/2023Lighting in dwelling unitsRadomir Delicenergy_progress
11/24/2023Lighting controlsRadomir Delicenergy_progress
11/24/2023Fenestration air leakageRadomir Delicenergy_progress
11/24/2023Fenestration areasRadomir Delicenergy_progress
11/24/2023Exterior lighting powerRadomir Delicenergy_progress
11/24/2023Insulation placement and R valuesRadomir Delicenergy_progress
11/24/2023Air barrier - visual inspectionRadomir Delicenergy_progress
11/24/2023Air barrier — testing Radomir Delicenergy_progress
11/24/2023Fenestration and door U-factor and product ratingsRadomir Delicenergy_progress
11/24/2023Energy Code Compliance InspectionsRadomir Delicprogress
11/24/2023Fire-Resistance Rated ConstructionRadomir Delicprogress
11/20/2023Insulation placement and R valuesRadomir Delicenergy_progress
11/20/2023Fire-Resistant Penetrations and JointsRadomir Delicspecial
11/20/2023Energy Code Compliance InspectionsRadomir Delicprogress
11/20/2023Fire-Resistance Rated ConstructionRadomir Delicprogress
11/20/2023Fenestration air leakageRadomir Delicenergy_progress
11/20/2023Air barrier — testing Radomir Delicenergy_progress
11/20/2023Lighting in dwelling unitsRadomir Delicenergy_progress
11/20/2023Interior lighting powerRadomir Delicenergy_progress
11/20/2023Fenestration and door U-factor and product ratingsRadomir Delicenergy_progress
Latest 25 of 73.
▾Documents — 146 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/24/2026X00721372-P1Request digital key ↗
08/24/2026X00721372-I1Request digital key ↗
08/24/2026X00774464-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
04/28/2023240334303Open ↗
11/04/2022240334303Open ↗
08/25/2022240334303Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
12/19/2022240334303Open ↗
08/25/2022240334303Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026X00719256-P3Open ↗
08/13/2026X00719256-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026X00719256-I1Open ↗
08/13/2026X00719256-P3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00719256-I1Open ↗
▸Seals & Professional Certifications92
▸DOB NOWProgress Inspector Seal & Signature50
09/12/2026X00720851-P1Open ↗
09/12/2026X00720851-P1Open ↗
08/29/2026X00719256-S3Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/12/2026X00720851-P1Open ↗
09/12/2026X00720851-P1Open ↗
09/12/2026X00720851-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/24/2026X00721372-P1Open ↗
08/24/2026X00721372-I1Open ↗
08/24/2026X00774464-I1Open ↗
Showing 3 of 18 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/25/2022240334303Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/25/2022240334303Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026X00719256-I1Open ↗
08/13/2026X00719256-P3Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST2
12/19/2022240334303Open ↗
08/25/2022240334303Open ↗
▸DOB NOWStreet Tree Checklist2
08/13/2026X00719256-I1Open ↗
08/13/2026X00719256-P3Open ↗
▸BISSTREET TREES SITE PLAN1
12/19/2022240334303Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00719256-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00719256-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00719256-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00719256-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
08/25/2022240334303Open ↗
▸Other Documents14
▸DOB NOWProperty Ownership Certification4
08/23/2026X00719256-P3Open ↗
08/23/2026X00719256-I1Open ↗
08/23/2026X00719256-P1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
12/19/2022240334303Open ↗
12/19/2022240334303Open ↗
12/19/2022240334303Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026X00719256-P3Open ↗
08/13/2026X00719256-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026X00719256-P3Open ↗
08/13/2026X00719256-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026X00721372-I1Open ↗
08/13/2026X00720851-I1Open ↗
▸DOB NOWFinal Survey1