← Back
Over six families without stores
1256 FTELEY AVENUE
BRONX · Soundview-Bruckner-Bronx River · BIN 2025446
💬 Discuss this project
1926Year Built
2Stories
C1Building Class
R6Zoning
4,294 sfGross Floor Area
8Units
Rent Stabilized25 Open Violations ▸
Over six families without stores · Owner of record: 1256 FTELEY AVE LLC · 2,500 sf lot · 1.72 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Floor 24p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar7p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1256 FTELEY AVE4707/08/2026
FOUR BORO ENTERPRISE103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/16/2022$1.4M—Private party → 1256 FTELEY AVE LLC$326/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALL CITY ENGINEERING, P.C.1112/26/2023
ENGINEERING PROFESSIONAL SERVICE P.412/21/2023
AVISHAY I. MAZOR, P.E.106/03/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMG GROUP USA1003/21/2026
ADVANCED BUILDERS SERVICES303/21/2026
EXSPEEDIUM403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FOUR BORO ENTERPRISE INCGeneral Contractor507/08/2026
PRIME PIPING & HEATING INPlumbing407/08/2026
SPARK ELECTRICAL SVCS LLCElectrical103/22/2026
CREATIVE PLUMBING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION15191412/26/2023
IP CONCRETE TESTING AND I6252106/03/2022
Building Lifecycle
All (169)Filed (16)Permit Issued (8)Signed Off (6)Violation (60)Inspection (11)Objection (38)Special Inspection (30)
04/30/2026
Violation issued (HPD, closed)
A
06/05/2025
Violation issued (HPD, closed)
A
11/25/2024
Violation issued (HPD, closed)
I
04/02/2024
Violation issued (HPD, closed)
A
02/14/2024
Signed off — Alteration CO
INTERIOR RENOVATION 5-DWELLING TO 8-DWELLING UNITS. NO CHANGE TO USE, BULK OR OCCUPANCY.
X00716931-S2
01/31/2024
Signed off — Alteration CO
INTERIOR RENOVATION 5-DWELLING TO 8-DWELLING UNITS. NO CHANGE TO USE, BULK OR OCCUPANCY.
X00716931-S5
01/31/2024
Signed off — Alteration CO
INTERIOR RENOVATION 5-DWELLING TO 8-DWELLING UNITS. NO CHANGE TO USE, BULK OR OCCUPANCY.
X00716931-S4
01/23/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/05/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/28/2023
Signed off — Alteration CO
INTERIOR RENOVATION 5-DWELLING TO 8-DWELLING UNITS. NO CHANGE TO USE, BULK OR OCCUPANCY.
X00716931-S1
12/26/2023
Filed — Alteration CO
INTERIOR RENOVATION 5-DWELLING TO 8-DWELLING UNITS. NO CHANGE TO USE, BULK OR OCCUPANCY.
X00716931-P9
12/26/2023
Signed off — Alteration CO
INTERIOR RENOVATION 5-DWELLING TO 8-DWELLING UNITS. NO CHANGE TO USE, BULK OR OCCUPANCY.
X00716931-S3
12/26/2023
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
12/26/2023
Special inspection requirement — Interior lighting power
Younes Abouyaala
12/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
12/26/2023
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
12/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
12/26/2023
Special inspection requirement — Lighting in dwelling units
Younes Abouyaala
12/26/2023
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
12/26/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
12/26/2023
Special inspection requirement — Maintenance information
Younes Abouyaala
12/26/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
12/26/2023
Special inspection requirement — Metering
Younes Abouyaala
12/26/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
12/26/2023
Special inspection requirement — Lighting controls
Younes Abouyaala
12/26/2023
Special inspection requirement — Maintenance information
Younes Abouyaala
12/22/2023
Permit issued — Boiler Equipment
X00716931-S5-BE
12/21/2023
Filed — Alteration CO
INTERIOR RENOVATION 5-DWELLING TO 8-DWELLING UNITS. NO CHANGE TO USE, BULK OR OCCUPANCY.
X00716931-P8
12/21/2023
Special inspection requirement — Lighting controls
Younes Abouyaala
12/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
12/21/2023
Special inspection requirement — Lighting in dwelling units
Younes Abouyaala
12/21/2023
Special inspection requirement — Metering
Younes Abouyaala
12/21/2023
Special inspection requirement — Maintenance information
Younes Abouyaala
12/21/2023
Special inspection requirement — Maintenance information
Younes Abouyaala
12/21/2023
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
12/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
12/21/2023
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
12/21/2023
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
12/21/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
12/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
12/21/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
12/21/2023
Special inspection requirement — Interior lighting power
Younes Abouyaala
12/12/2023
Objection resolved — Addressed
12/12/2023
Objection resolved — Addressed
12/12/2023
Objection resolved — Addressed
12/12/2023
Special inspection requirement — Mechanical Systems
Younes Abouyaala
12/12/2023
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
12/07/2023
Objection raised — Fire_Protection
12/06/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
12/06/2023
Objection raised — Other
12/05/2023
Filed — Alteration CO
INTERIOR RENOVATION 5-DWELLING TO 8-DWELLING UNITS. NO CHANGE TO USE, BULK OR OCCUPANCY.
X00716931-P7
12/04/2023
Objection resolved — Addressed
12/01/2023
Objection raised — Other
12/01/2023
Objection raised — Other
11/30/2023
Filed — Alteration CO
INTERIOR RENOVATION 5-DWELLING TO 8-DWELLING UNITS. NO CHANGE TO USE, BULK OR OCCUPANCY.
X00716931-S5
11/30/2023
Filed — Alteration CO
INTERIOR RENOVATION 5-DWELLING TO 8-DWELLING UNITS. NO CHANGE TO USE, BULK OR OCCUPANCY.
X00716931-P5
11/30/2023
Filed — Alteration CO
INTERIOR RENOVATION 5-DWELLING TO 8-DWELLING UNITS. NO CHANGE TO USE, BULK OR OCCUPANCY.
X00716931-P6
11/28/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/22/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/16/2023
Violation issued (HPD, closed)
I
Latest 60 of 169 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offPRIME PIPING & HEATING IN12/22/2023
DOB NOWPlumbingSigned-offAB PLUMBING INC09/19/2023
DOB NOWSprinklersSigned-offPRIME PIPING & HEATING IN08/16/2023
DOB NOWBoiler EquipmentSigned-offPRIME PIPING & HEATING IN08/16/2023
DOB NOWMechanical SystemsSigned-offFOUR BORO ENTERPRISE INC07/10/2023
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN06/08/2023
DOB NOWGeneral ConstructionPermit IssuedFOUR BORO ENTERPRISE INC12/06/2022
DOB NOWFoundationSigned-offFOUR BORO ENTERPRISE INC06/08/2022
BISOTISSUEDRESTOREX INC03/29/1999
1 project · most recent 12/26/2023
Associated Ducts and Piping Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/26/2023Signed-offFOUR BORO ENTERPRISE INCAssociated Ducts and Piping, Ventilation Systems
Ventilation
Broan Broan 50 CFM · Exhaust Fan ×2
Broan -503C 100 CFM · Kitchen Exhaust ×2
DE-204110-3090-DDL-A-1 300 CFM · Exhaust Fan ×2
Ducts & Piping
Broan Broan 100 CFM · Ductwork ×2
1 project · most recent 12/26/2023
Gas Water/Sanitary
FiledStatusContractorScope
12/26/2023Signed-offA M B MECHANICAL INCGas, Water/Sanitary
2 projects · most recent 05/11/2023
General Wiring
FiledStatusContractorScope
05/11/2023CompleteTOWER FIRE & ELECT SVCSGeneral Wiring
05/10/2023CompleteSPARK ELECTRICAL SVCS LLC9 meters, 9 new_meters
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
01/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/05/2024Pass-Final Boiler Equipment InspectionPassView ↗
12/06/2023Fail-Final CND-Occupancy InspectionFailView ↗
11/28/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/22/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/31/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/19/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/30/2023Fail-Final PL - Up to 9 Requested FloorsFailView ↗
08/24/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/18/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 89
DateRequirementInspectorRole
12/26/2023Interior lighting powerYounes Abouyaalaenergy_progress
12/26/2023Lighting in dwelling unitsYounes Abouyaalaenergy_progress
12/26/2023Maintenance informationYounes Abouyaalaenergy_progress
12/26/2023Lighting controlsYounes Abouyaalaenergy_progress
12/26/2023MeteringYounes Abouyaalaenergy_progress
12/26/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
12/26/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
12/26/2023HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
12/26/2023HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
12/26/2023HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
12/26/2023Maintenance informationYounes Abouyaalaenergy_progress
12/26/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
12/26/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
12/26/2023Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
12/21/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
12/21/2023Lighting in dwelling unitsYounes Abouyaalaenergy_progress
12/21/2023Lighting controlsYounes Abouyaalaenergy_progress
12/21/2023Maintenance informationYounes Abouyaalaenergy_progress
12/21/2023MeteringYounes Abouyaalaenergy_progress
12/21/2023Interior lighting powerYounes Abouyaalaenergy_progress
12/21/2023Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
12/21/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
12/21/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
12/21/2023HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
12/21/2023HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
Latest 25 of 89.
▾Documents — 104 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/24/2026X00743176-I1Request digital key ↗
08/23/2026X00716931-P8Request digital key ↗
08/23/2026X00716931-P1Request digital key ↗
Showing 3 of 16 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00716931-I1Open ↗
▸Seals & Professional Certifications61
▸DOB NOWProgress Inspector Seal & Signature30
09/23/2026X00716931-S4Open ↗
09/23/2026X00716931-S5Open ↗
08/31/2026X00716931-P5Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/24/2026X00743176-I1Open ↗
08/23/2026X00716931-P8Open ↗
08/23/2026X00716931-P2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/23/2026X00716931-S4Open ↗
09/23/2026X00716931-S5Open ↗
09/23/2026X00716931-S3Open ↗
Showing 3 of 15 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/13/2026X00716931-I1Open ↗
08/13/2026X00716931-P1Open ↗
08/13/2026X00716931-P2Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
08/24/2026X00743176-I1Open ↗
08/23/2026X00716931-P1Open ↗
08/23/2026X00716931-P3Open ↗
Showing 3 of 16 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00716931-I1Open ↗
▸Filing & Intake Forms1
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026X00716931-P2Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification4
08/23/2026X00716931-P2Open ↗
08/23/2026X00716931-P1Open ↗
08/23/2026X00716931-P8Open ↗
Showing 3 of 4 on file for this type