← Back
Four families
1257 BRONX RIVER AVENUE
BRONX · BIN 2024950
💬 Discuss this project
1925Year Built
2Stories
C3Building Class
R6Zoning
3,200 sfGross Floor Area
4Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Four families · 3,000 sf lot · 1.07 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/14/2022$850K—— → —$266/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SYED ENGINEERING, P.C.106/08/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ABC PERMIT EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BLUE USA CONSTR COMP INC*General Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SYED ENGINEERING, P.C.7054106/08/2023
Building Lifecycle
All (17)Filed (1)Permit Issued (1)Signed Off (1)Violation (8)Objection (2)Special Inspection (4)
04/02/2024
Violation issued (HPD, closed)
A
03/18/2024
Signed off — Alteration
INTERIOR RENOVATION OF 2 STORY BUILDING, WORK INCLUDES, REPLACEMENT OF SHEETROCK & PLASTER WITH NEW TYPE 'X' GYPSUM BOARD ON EXISTING STUDS, NEW FLOOR, REPLACING BATHROOM & KITCHEN FIXTURES, REPLACING SANITARY RISERS. NO CHANGES TO USES, EGRESS, OCCUPANCY
X00875728-I1
07/26/2023
Permit issued — General Construction
X00875728-I1-GC
07/11/2023
Objection resolved — Addressed
06/12/2023
Objection raised — Structural
06/08/2023
Filed — Alteration
INTERIOR RENOVATION OF 2 STORY BUILDING, WORK INCLUDES, REPLACEMENT OF SHEETROCK & PLASTER WITH NEW TYPE 'X' GYPSUM BOARD ON EXISTING STUDS, NEW FLOOR, REPLACING BATHROOM & KITCHEN FIXTURES, REPLACING SANITARY RISERS. NO CHANGES TO USES, EGRESS, OCCUPANCY
X00875728-I1
05/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAFI HAMID
05/24/2023
Special inspection requirement — Energy Code Compliance Inspections
RAFI HAMID
05/24/2023
Special inspection requirement — Fire-Resistance Rated Construction
RAFI HAMID
05/16/2023
Special inspection requirement — Final
RAFI HAMID
04/25/2023
Violation issued (ECB, closed)
Construction
03/16/2023
Violation issued (HPD, closed)
A
11/04/2022
Violation issued (HPD, closed)
I
02/17/2022
Violation issued (HPD, closed)
I
02/17/2022
Violation issued (HPD, closed)
A
04/02/2021
Violation issued (HPD, closed)
A
11/09/2017
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBLUE USA CONSTR COMP INC*07/26/2023
2 projects · most recent 09/05/2025
General Wiring
FiledStatusContractorScope
09/05/2025CompleteMETRO TECH ELECTRICAL COR5 meters, 1 new_meters
08/16/2023CompleteA'S ELECTRIC CONTRACTINGGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
05/24/2023Fire-Resistant Penetrations and JointsRAFI HAMIDspecial
05/24/2023Energy Code Compliance InspectionsRAFI HAMIDprogress
05/24/2023Fire-Resistance Rated ConstructionRAFI HAMIDprogress
05/16/2023FinalRAFI HAMIDprogress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/23/2026X00875728-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026X00875728-I1Open ↗
08/25/2026X00875728-I1Open ↗
08/25/2026X00875728-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/23/2026X00875728-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026X00875728-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/23/2026X00875728-I1Open ↗