← Back
BuildNYC
Three families
1259 BUSHWICK AVENUE
BROOKLYN · BIN 3078505
💬 Discuss this project
1910Year Built
3Stories
C0Building Class
R6Zoning
4,400 sfGross Floor Area
3Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Three families · Owner of record: D&H1259 · 1,600 sf lot · 2.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofCold-formed steel light-frame construction25p · 1 filing · 20 docs
Floor 3Unit 339p · 1 filing · 20 docs
Floor 2Cold-formed steel light-frame construction35p · 1 filing · 20 docs
Floor 1Unit 134p · 1 filing · 20 docs
BasementCold-formed steel light-frame construction41p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
D H12593107/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/09/2021$400K—Private party → D&H1259$91/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Lab Architecture603/11/2024
Florinela Muresan403/06/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Lab Architecture603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
IvenkoGeneral Contractor607/08/2026
Falco Electrical ServicesElectrical103/22/2026
Ivenkospecialty_contractor107/08/2026
Altair Plumbing and HeatingPlumbing107/08/2026
Orbit SprinklerFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Lab Architecture3653603/11/2024
MWB Engineering7942403/06/2024
Studio Nyandak8378308/07/2023
Building Lifecycle
06/06/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
11/26/2024
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
09/15/2024
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
B00702179-I1-GC
05/21/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/15/2024
Signed off — Alteration CO
Change of occupancy from 3 dwelling units to 4 dwelling units. Work includes all new finishes, fixtures, equipment. No change in Use, Bulk or Egress.
B00702179-S1
113 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offOrbit Sprinkler01/30/2024
DOB NOWFoundationSigned-offIvenko09/25/2023
DOB NOWStructuralSigned-offIvenko09/18/2023
DOB NOWGeneral ConstructionPermit IssuedIvenko09/15/2023
DOB NOWMechanical SystemsSigned-offIvenko04/04/2023
DOB NOWPlumbingSigned-offAltair Plumbing and Heating03/13/2023
DOB NOWGeneral ConstructionPermit IssuedIvenko02/21/2023
1 project · most recent 03/11/2024
Heating and Air Conditioning Systems
FiledStatusContractorScope
03/11/2024Signed-offIvenkoHeating and Air Conditioning Systems
1 project · most recent 03/11/2024
Sprinkler System
FiledStatusContractorScope
03/11/2024Signed-offOrbit SprinklerSprinkler System
1 project · most recent 03/11/2024
Gas Water/Sanitary
FiledStatusContractorScope
03/11/2024Signed-offAltair Plumbing and HeatingGas, Water/Sanitary
2 projects · most recent 05/02/2024
General Wiring
FiledStatusContractorScope
05/02/2024CompleteFalco Electrical ServicesGeneral Wiring
03/26/2023CompleteFalco Electrical Services—
1 project · most recent 03/11/2024
Steel Concrete Wood
FiledStatusContractorScope
03/11/2024Signed-offOrbit SprinklerSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
05/21/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/08/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/07/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/06/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/05/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/18/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/30/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
04/10/2024Fire-Resistance Rated ConstructionLeslie Barnettprogress
04/10/2024Fire-Resistant Penetrations and JointsLeslie Barnettspecial
04/10/2024Energy Code Compliance InspectionsLeslie Barnettprogress
04/08/2024Fire-Resistant Penetrations and JointsLeslie Barnettspecial
04/08/2024HVAC-R and service water piping design and insulationFLORINELA MURESANenergy_progress
04/08/2024Maintenance informationFLORINELA MURESANenergy_progress
04/08/2024HVAC-R and service water heating equipmentFLORINELA MURESANenergy_progress
04/08/2024HVAC-R and service water heating system controlsFLORINELA MURESANenergy_progress
04/08/2024Sprinkler SystemsFLORINELA MURESANspecial
03/11/2024Fenestration air leakageLeslie Barnettenergy_progress
03/11/2024Maintenance informationLeslie Barnettenergy_progress
03/11/2024Insulation placement and R valuesLeslie Barnettenergy_progress
03/11/2024MeteringLeslie Barnettenergy_progress
03/11/2024Fire-Resistant Penetrations and JointsLeslie Barnettspecial
03/11/2024Energy Code Compliance InspectionsLeslie Barnettprogress
03/11/2024Fire-Resistance Rated ConstructionLeslie Barnettprogress
03/11/2024Exterior lighting powerLeslie Barnettenergy_progress
03/11/2024Fenestration areasLeslie Barnettenergy_progress
03/11/2024Fenestration and door U-factor and product ratingsLeslie Barnettenergy_progress
03/11/2024Lighting in dwelling unitsLeslie Barnettenergy_progress
08/17/2023Subsurface Investigations (Borings/Test Pits)Stephen Morsespecial
08/02/2023Structural Stability – Alterations of existing buildingsTENZIN NYANDAKspecial
08/02/2023Structural Cold-Formed SteelTENZIN NYANDAKspecial
08/02/2023Structural Steel - DetailsTENZIN NYANDAKspecial
08/02/2023FinalTENZIN NYANDAKprogress
Latest 25 of 43.
74 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account