1259 SAINT MARKS AVENUE
BROOKLYN · BIN 3430508
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open Violations
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
RoofUnder Construction1 filing · 20 docs
PenthouseUnder Construction1 filing · 20 docs
Floor 4Under Construction1 filing · 20 docs
Floor 3Under Construction1 filing · 20 docs
Floor 2Under Construction1 filing · 20 docs
Floor 1Under Construction1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN85241307/14/2026
RI CONSULTING SERVICES IN8904102/26/2026
Building Lifecycle
All (96)Filed (22)Permit Issued (9)Signed Off (14)Violation (1)Inspection (6)Objection (14)Special Inspection (30)
07/21/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/14/2026
Filed — New Building
Mechanical Systems filed in conjunction with NB B01205619-I1
B01205619-A1
07/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
07/13/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Shahrish Shuvo
07/13/2026
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
07/13/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
07/13/2026
Special inspection requirement — Exterior lighting power
Shahrish Shuvo
07/13/2026
Special inspection requirement — Metering
Shahrish Shuvo
07/13/2026
Special inspection requirement — Interior lighting power
Shahrish Shuvo
07/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
07/13/2026
Special inspection requirement — Air barrier — testing
Shahrish Shuvo
07/13/2026
Special inspection requirement — Lighting in dwelling units
Shahrish Shuvo
07/13/2026
Special inspection requirement — Fenestration areas
Shahrish Shuvo
07/13/2026
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
07/13/2026
Special inspection requirement — Lighting controls
Shahrish Shuvo
07/13/2026
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
07/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
07/13/2026
Special inspection requirement — Maintenance information
Shahrish Shuvo
07/09/2026
Signed off — New Building
Mechanical Systems filed in conjunction with NB B01205619-I1
B01205619-S5
06/18/2026
Signed off — New Building
Mechanical Systems filed in conjunction with NB B01205619-I1
B01205619-S6
06/11/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/05/2026
Signed off — Alteration
B01362349-I1
06/03/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/27/2026
Signed off — New Building
Mechanical Systems filed in conjunction with NB B01205619-I1
B01205619-S4
05/11/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01330188-I1
05/11/2026
Signed off — Alteration
PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01207204-I1
05/11/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01332445-I1
05/11/2026
Signed off — Alteration
B01332442-I1
05/11/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01329520-I1
05/03/2026
Special inspection requirement — Sprinkler Systems
Shahrish Shuvo
05/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
04/23/2026
Violation issued (ECB, closed)
Construction
04/21/2026
Filed — New Building
Mechanical Systems filed in conjunction with NB B01205619-I1
B01205619-P7
04/17/2026
Signed off — New Building
Mechanical Systems filed in conjunction with NB B01205619-I1
B01205619-S3
04/17/2026
Signed off — New Building
Mechanical Systems filed in conjunction with NB B01205619-I1
B01205619-S2
04/17/2026
Signed off — New Building
Mechanical Systems filed in conjunction with NB B01205619-I1
B01205619-S1
04/03/2026
Permit issued — Plumbing
B64413195-S5-PL
03/24/2026
Permit issued — General Construction
B01205619-I1-GC
03/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
03/07/2026
Special inspection requirement — Shutoff dampers
Shahrish Shuvo
03/07/2026
Special inspection requirement — Duct leakage testing, insulation and design
Shahrish Shuvo
03/07/2026
Special inspection requirement — Final
Shahrish Shuvo
03/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
Shahrish Shuvo
03/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
Shahrish Shuvo
03/07/2026
Special inspection requirement — Mechanical Systems
Shahrish Shuvo
03/07/2026
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
03/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
03/07/2026
Special inspection requirement — Heating Systems
Shahrish Shuvo
03/07/2026
Special inspection requirement — Maintenance information
Shahrish Shuvo
03/04/2026
Objection resolved — Addressed
02/26/2026
Filed — Alteration
B01362349-I1
02/25/2026
Special inspection requirement — Chimneys and vents
MD ISLAM
02/24/2026
Objection raised — Energy
02/23/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/16/2026
Objection resolved — Addressed
02/11/2026
Objection raised — Other
02/03/2026
Filed — New Building
Mechanical Systems filed in conjunction with NB B01205619-I1
B01205619-P5
01/12/2026
Filed — New Building
Mechanical Systems filed in conjunction with NB B01205619-I1
B01205619-P4
12/23/2025
Permit issued — General Construction
B01205619-I1-GC
12/22/2025
Permit issued — Mechanical Systems
B01205619-S4-MS
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPLUMBING WORKS NYC INC04/03/2026
DOB NOWGeneral ConstructionPermit IssuedPARK USA DESIGN & REMODEL03/24/2026
DOB NOWGeneral ConstructionPermit IssuedPARK USA DESIGN & REMODEL12/23/2025
DOB NOWMechanical SystemsSigned-offPARK USA DESIGN & REMODEL12/22/2025
DOB NOWSprinklersSigned-offA M B MECHANICAL INC11/07/2025
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN11/07/2025
DOB NOWFoundationSigned-offPARK USA DESIGN & REMODEL08/21/2025
DOB NOWStructuralSigned-offPARK USA DESIGN & REMODEL08/21/2025
DOB NOWSupport of ExcavationSigned-offPARK USA DESIGN & REMODEL08/05/2025
1 project · most recent 07/14/2026
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/14/2026Permit IssuedPARK USA DESIGN & REMODELHeating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-5D36NL 35,400 BTU · Vrf Outdoor ×14
MXZ-SM36NL 36,000 BTU · Heat Pump Outdoor ×12
MXZ-4D30NL 28,400 BTU · Heat Pump Outdoor ×6
MXZ-5D42NL 40,500 BTU · Heat Pump Outdoor ×6
MUZ-GX24NL 22,400 BTU · Heat Pump Outdoor ×2
MXZ-3D24NL 22,000 BTU · Heat Pump Outdoor ×2
Heating
Qmark MUH0381 3 kW · Electric Heater ×8
Tpi 8PD10-1810-3 10 kW · Electric Heater ×2
Ventilation
Greenheck ERVe-20-15L 1,305 CFM · Erv ×2
1 project · most recent 07/14/2026
Sprinkler System
FiledStatusContractorScope
07/14/2026Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 07/14/2026
Storm Water/Sanitary
FiledStatusContractorScope
07/14/2026Signed-offA M B MECHANICAL INCStorm, Water/Sanitary
5 projects · most recent 09/22/2026
General Wiring
FiledStatusContractorScope
09/22/2026CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
04/16/2026CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
04/16/2026CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
12/08/2025CompleteSOLAS ELECTRICAL CORP—
11/03/2025CompletePOWER DIRECT ELECTRIC INC—
1 project · most recent 07/14/2026
Concrete
FiledStatusContractorScope
07/14/2026Permit IssuedPARK USA DESIGN & REMODELConcrete
1 project · most recent 10/17/2025
Fence
FiledStatusContractorScope
10/17/2025Signed-offPARK MANAGEMENT USA CORPFence
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/21/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/11/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/03/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/23/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/19/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/19/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 93
DateRequirementInspectorRole
07/13/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
07/13/2026Energy Code Compliance InspectionsShahrish Shuvoprogress
07/13/2026Exterior Insulation and Finish Systems (EIFS)Shahrish Shuvospecial
07/13/2026Lighting controlsShahrish Shuvoenergy_progress
07/13/2026Fenestration areasShahrish Shuvoenergy_progress
07/13/2026Lighting in dwelling unitsShahrish Shuvoenergy_progress
07/13/2026Interior lighting powerShahrish Shuvoenergy_progress
07/13/2026Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
07/13/2026Air barrier - visual inspectionShahrish Shuvoenergy_progress
07/13/2026Fenestration air leakageShahrish Shuvoenergy_progress
07/13/2026Maintenance informationShahrish Shuvoenergy_progress
07/13/2026Air barrier — testing Shahrish Shuvoenergy_progress
07/13/2026Insulation placement and R valuesShahrish Shuvoenergy_progress
07/13/2026MeteringShahrish Shuvoenergy_progress
07/13/2026Exterior lighting powerShahrish Shuvoenergy_progress
07/13/2026Fire-Resistance Rated ConstructionShahrish Shuvoprogress
05/03/2026Sprinkler SystemsShahrish Shuvospecial
05/03/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
03/07/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
03/07/2026Mechanical SystemsShahrish Shuvospecial
03/07/2026Heating SystemsShahrish Shuvospecial
03/07/2026Energy Code Compliance InspectionsShahrish Shuvoprogress
03/07/2026FinalShahrish Shuvoprogress
03/07/2026HVAC-R and service water heating equipmentShahrish Shuvoenergy_progress
03/07/2026Shutoff dampersShahrish Shuvoenergy_progress
Latest 25 of 93.
▾Documents — 117 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
08/22/2026B01197496-I1Request digital key ↗
08/21/2026B01221405-I1Request digital key ↗
08/20/2026B01207204-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/17/2026B01205619-A1Open ↗
08/15/2026B01205619-P4Open ↗
08/13/2026B01205619-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/17/2026B01205619-A1Open ↗
08/15/2026B01205619-P4Open ↗
08/13/2026B01205619-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01205619-I1Open ↗
▸Seals & Professional Certifications61
▸DOB NOWSpecial Inspector Seal & Signature21
09/01/2026B01205619-S2Open ↗
09/01/2026B01205619-S2Open ↗
08/30/2026B01205619-P4Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/20/2026B01207204-I1Open ↗
08/20/2026B01207204-P1Open ↗
08/19/2026B01330188-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/01/2026B01205619-S2Open ↗
08/30/2026B01205619-P8Open ↗
08/30/2026B01205619-P8Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWCONTRACTOR SEAL & SIGNATURE1
08/13/2026B01197496-I1Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/15/2026B01205619-P4Open ↗
08/13/2026B01205619-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B01197496-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B01197496-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B01197496-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026B01197496-I1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/17/2026B01205619-A1Open ↗
08/15/2026B01205619-P4Open ↗
08/15/2026B01205619-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/15/2026B01205619-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/15/2026B01205619-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01205619-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026B01221405-I1Open ↗
08/13/2026B01197496-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026B01197496-I1Open ↗
▸Other Documents12
▸DOB NOWProperty Ownership Certification5
08/21/2026B01221405-I1Open ↗
08/17/2026B01205619-A1Open ↗
08/15/2026B01205619-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/17/2026B01205619-A1Open ↗
08/15/2026B01205619-P4Open ↗
08/13/2026B01205619-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/17/2026B01205619-A1Open ↗
▸DOB NOWFinal Survey1
08/15/2026B01205619-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01205619-S1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B01197496-I1Open ↗