← Back
Two family converted from one family
126-02 111 AVENUE
QUEENS · BIN 4250739
💬 Discuss this project
1920Year Built
2.5Stories
B3Building Class
R3-2Zoning
1,915 sfGross Floor Area
2Units
3 Open Violations 1 unresolved · 2 paperwork only ▸FDNY Report ↗
Two family converted from one family · 2,500 sf lot · 0.77 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/04/2019$625K—— → —$326/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOUTHERN CONSULTING ENGINEERING PC509/11/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JARED ASSOCIATE CONSULTING1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY DYNAMIC CONSTRUCTION CGeneral Contractor407/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
KISHAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
S&S CONCRETE & SOIL TESTI1008209/11/2023
Building Lifecycle
All (51)Filed (5)Permit Issued (4)Signed Off (3)Violation (3)Inspection (5)Objection (20)Special Inspection (11)
03/28/2025
Signed off — Alteration
Construction of temporary construction fence as per submitted drawing.
Q08035111-S2
01/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/16/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/08/2024
Signed off — Alteration
Construction of temporary construction fence as per submitted drawing.
Q08035111-I1
05/10/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/09/2024
Permit issued — Plumbing
Q08035111-S2-PL
12/06/2023
Permit issued — Plumbing
Q08035111-S2-PL
10/24/2023
Signed off — Alteration
Construction of temporary construction fence as per submitted drawing.
Q08035111-S3
10/20/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/30/2023
Special inspection requirement — Mechanical Systems
GLEN LANGER
09/30/2023
Special inspection requirement — Final
GLEN LANGER
09/30/2023
Special inspection requirement — Energy Code Compliance Inspections
GLEN LANGER
09/30/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
GLEN LANGER
09/30/2023
Special inspection requirement — HVAC-R and service water heating system controls
GLEN LANGER
09/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
GLEN LANGER
09/30/2023
Special inspection requirement — Air barrier - visual inspection
GLEN LANGER
09/30/2023
Special inspection requirement — Interior lighting power
GLEN LANGER
09/30/2023
Special inspection requirement — Fenestration areas
GLEN LANGER
09/30/2023
Special inspection requirement — Fenestration air leakage
GLEN LANGER
09/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
GLEN LANGER
09/11/2023
Filed — Alteration
Construction of temporary construction fence as per submitted drawing.
Q08035111-P1
08/10/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/16/2023
Permit issued — Construction Fence
Q08035111-I1-FN
05/25/2023
Permit issued — General Construction
Q08035111-S3-GC-CX
03/10/2023
Objection raised — Scope
03/10/2023
Objection raised — Zoning
03/10/2023
Objection raised — Structural
03/10/2023
Objection raised — Scope
03/10/2023
Objection resolved — Addressed
03/10/2023
Objection raised — Structural
03/10/2023
Objection raised — Zoning
03/10/2023
Objection raised — Zoning
03/10/2023
Objection raised — Fire_Protection
03/10/2023
Objection raised — Accessibility
03/10/2023
Objection raised — Fire_Protection
03/10/2023
Objection resolved — Addressed
03/10/2023
Objection raised — Scope
03/10/2023
Objection raised — Zoning
03/07/2023
Filed — Alteration CO
Proposed new certificate of occupancy from 2-family dwelling to 1-family dwelling and office, and a new 3-pc bathroom in the cellar.
Q00822147-I1
01/27/2023
Violation issued (ECB, open)
Construction
01/27/2023
Violation issued (ECB, open)
Construction
11/30/2022
Objection raised — Scope
11/30/2022
Objection resolved — Addressed
11/30/2022
Objection raised — Fire_Protection
11/30/2022
Objection resolved — Addressed
11/30/2022
Objection raised — Accessibility
11/30/2022
Objection resolved — Addressed
11/25/2022
Filed — Alteration
Construction of temporary construction fence as per submitted drawing.
Q08035111-S2
11/25/2022
Filed — Alteration
Construction of temporary construction fence as per submitted drawing.
Q08035111-S3
11/10/2022
Filed — Alteration
Construction of temporary construction fence as per submitted drawing.
Q08035111-I1
10/21/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offN AND S PLUMBING INC01/09/2024
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT12/06/2023
DOB NOWConstruction FenceSigned-offNY DYNAMIC CONSTRUCTION C06/16/2023
DOB NOWGeneral ConstructionSigned-offNY DYNAMIC CONSTRUCTION C05/25/2023
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/10/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/16/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/20/2023Pass-Final General Construction Non-Directive 14PassView ↗
08/10/2023Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
09/30/2023Mechanical SystemsGLEN LANGERspecial
09/30/2023FinalGLEN LANGERprogress
09/30/2023Energy Code Compliance InspectionsGLEN LANGERprogress
09/30/2023Fenestration and door U-factor and product ratingsGLEN LANGERenergy_progress
09/30/2023HVAC-R and service water heating system controlsGLEN LANGERenergy_progress
09/30/2023HVAC-R and service water heating equipmentGLEN LANGERenergy_progress
09/30/2023Air barrier - visual inspectionGLEN LANGERenergy_progress
09/30/2023Interior lighting powerGLEN LANGERenergy_progress
09/30/2023Fenestration areasGLEN LANGERenergy_progress
09/30/2023Fenestration air leakageGLEN LANGERenergy_progress
09/30/2023HVAC-R and service water piping design and insulationGLEN LANGERenergy_progress
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026Q08035111-P1Request digital key ↗
08/25/2026Q08035111-I1Request digital key ↗
08/25/2026Q08035111-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00822147-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026Q08035111-S3Open ↗
08/25/2026Q00822147-I1Open ↗
08/13/2026Q08035111-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/05/2026Q08035111-S3Open ↗
09/05/2026Q08035111-S3Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/05/2026Q08035111-S3Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00822147-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/15/2026Q00822147-I1Open ↗
08/15/2026Q08035111-S3Open ↗
08/13/2026Q08035111-P1Open ↗
▸Other Documents2
▸DOB NOWFinal Survey1
08/13/2026Q00822147-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026Q00822147-I1Open ↗