← Back
BuildNYC
Court house
126-02 82ND AVENUE
QUEENS · Kew Gardens · BIN 4458616
💬 Discuss this project
1957Year Built
8Stories
Z1Building Class
C4-4Zoning
596,475 sfGross Floor Area
1Units
LL97 Covered17 Active Violations 1 unresolved · 16 paperwork only 14 old, status unconfirmed ▸FISP: No Report Filed
Court house · Owner of record: NYC Department of Transportation · 295,860 sf lot · 2.02 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsQueens Detention Center4 filings
RoofJeens Detention Center3p · 2 filings · 20 docs
PenthouseJeens Detention Center1p · 1 filing
Floor 8Jeens Detention Center2p · 1 filing
Floor 7Jeens Detention Center1p · 1 filing
Floor 6Jeens Detention Center1p · 1 filing
Floor 5Jeens Detention Center2p · 1 filing
Floor 4
Floor 3Jeens Detention Center2p · 1 filing
Floor 2Jeens Detention Center1p · 1 filing
Floor 1Jeens Detention Center2p · 2 filings · 20 docs
MezzanineJeens Detention Center5p · 1 filing
CellarJeens Detention Center2p · 3 filings · 18 docs
Site & exteriorNYC Department of CorrectionUnder Construction8 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Design and Construction8407/08/2026
NYC Department of General Services2807/08/2026
City of NY Depart of Design1003/21/2026
Department Design Construction Correction403/21/2026
NYC Department of Design & Cons103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Infrastructure Engineering610/13/2026
JFK Associates310/23/2025
Urbahn Architects501/09/2025
Tohfaz Uddin PE811/16/2023
Jaros Baum & Bolles310/24/2023
Cesaretti Engineered Solutions102/06/2023
Thornton Tomasetti401/11/2023
Christopher Compton508/31/2022
Matrix New World Engineering206/28/2022
Ecc304/27/2022
Bitopi Consultants112/23/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Eurocelt Expediting1603/21/2026
Expedite Dem403/21/2026
Archetype Consultants2803/21/2026
ECC1803/21/2026
Milrose Consultants203/21/2026
WJ Professional Expediting Co103/21/2026
AK Consulting Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Starr IndustriesScaffold1307/08/2026
Hunter Roberts ConstructionGeneral Contractor1107/08/2026
Prima Pavingspecialty_contractor607/08/2026
Pal Environmental SafetyGeneral Contractor407/08/2026
Manengeering BureauFire Protection407/08/2026
Cardoza PlumbingPlumbing207/08/2026
Alliance PlumbingPlumbing207/08/2026
Pal Environmental SafetyScaffold203/21/2026
Star Electrical ContractorsElectrical103/21/2026
Mes ConstructionPlumbing107/08/2026
Citywide Electrical ContractingElectrical103/21/2026
HV ElectricElectrical103/21/2026
Cross Hudson ElectricalElectrical103/21/2026
T & R Alarm and ElectricalElectrical103/21/2026
Leon D. Dematteis ConstructionGeneral Contractor107/08/2026
Rennon ConstructionScaffold107/08/2026
AMC Plumbing, Heating & CLNGPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Cole Technologies/Control1290310/13/2026
Tectonic Engineering Cons1061901/09/2025
Building Lifecycle
All (213)Filed (41)Permit Issued (35)Signed Off (17)Facade (FISP) (6)Violation (60)Inspection (8)Objection (16)Special Inspection (30)
10/13/2026
Filed — Alteration
GC WORK RELATED TO CIVL PLUMBING WORK TO RE-ROUTE SEWER LINE AHEAD OF CONSTRUCTION.
Q01323390-P3
10/13/2026
Filed — Alteration
GC WORK RELATED TO CIVL PLUMBING WORK TO RE-ROUTE SEWER LINE AHEAD OF CONSTRUCTION.
Q01323390-P4
09/18/2026
Violation issued (ECB, open)
Unknown
06/22/2026
Permit issued — Plumbing
Q01323390-S1-PL
06/17/2026
Permit issued — General Construction
Q01323390-I1-GC
06/12/2026
Special inspection requirement — Subgrade Inspections
GEORGE ANDERSEN
06/12/2026
Special inspection requirement — Final
GEORGE ANDERSEN
06/04/2026
Filed — Alteration
GC WORK RELATED TO CIVL PLUMBING WORK TO RE-ROUTE SEWER LINE AHEAD OF CONSTRUCTION.
Q01323390-P1
06/02/2026
Filed — Alteration
GC WORK RELATED TO CIVL PLUMBING WORK TO RE-ROUTE SEWER LINE AHEAD OF CONSTRUCTION.
Q01323390-P2
04/24/2026
Special inspection requirement — Final
GEORGE ANDERSEN
04/24/2026
Special inspection requirement — Subgrade Inspections
GEORGE ANDERSEN
04/16/2026
Signed off — Alteration
Site restoration, grading, and soil work at the ground floor for proposed construction of vehicular sally port. No change in building use, egress, or occupancy; existing street tress to remain and be protected.
Q00701267-S3
03/04/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
12/31/2025
Filed — Alteration
GC WORK RELATED TO CIVL PLUMBING WORK TO RE-ROUTE SEWER LINE AHEAD OF CONSTRUCTION.
Q01323390-S1
12/31/2025
Filed — Alteration
GC WORK RELATED TO CIVL PLUMBING WORK TO RE-ROUTE SEWER LINE AHEAD OF CONSTRUCTION.
Q01323390-I1
12/12/2025
Signed off — Alteration
Plumbing alterations at the cellar level for proposed replacement of ex. domestic water DCVA with new backflow prevention devices/assemblies and accessories; related work as per plans. No proposed change in building use, egress, or occupancy.
Q00766227-I1
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/24/2025
Signed off — Alteration
Site restoration, grading, and soil work at the ground floor for proposed construction of vehicular sally port. No change in building use, egress, or occupancy; existing street tress to remain and be protected.
Q00701267-S2
10/23/2025
Filed — Alteration
Plumbing alterations at the cellar level for proposed replacement of ex. domestic water DCVA with new backflow prevention devices/assemblies and accessories; related work as per plans. No proposed change in building use, egress, or occupancy.
Q00766227-P1
09/08/2025
Signed off — Alteration
Site restoration, grading, and soil work at the ground floor for proposed construction of vehicular sally port. No change in building use, egress, or occupancy; existing street tress to remain and be protected.
Q00701267-S4
08/21/2025
Signed off — Alteration
REMOVAL OF NON-LOAD BEARING INTERIOR PARTITIONS. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
Q00724416-I1
08/01/2025
Signed off — Alteration
MODIFICATION OF EXISTING WET STANDPIPE SYSTEM TO A DRY PRESSURIZED SYSTEM. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
Q00724797-I1
08/01/2025
Signed off — Alteration
REMOVAL OF SPRINKLER SYSTEM FROM FLOORS CELLAR, 001-008. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
Q00724758-I1
07/23/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/15/2025
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 126-02 82ND AVENUE, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q00440016-I1
06/25/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY FLOOR SHORING POSTS IN ASSOCIATION WITH FULL BUILDING DEMOLITION. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION
Q00772773-I1
06/18/2025
Signed off — Alteration
Site restoration, grading, and soil work at the ground floor for proposed construction of vehicular sally port. No change in building use, egress, or occupancy; existing street tress to remain and be protected.
Q00701267-I1
06/11/2025
Signed off — Alteration
Site restoration, grading, and soil work at the ground floor for proposed construction of vehicular sally port. No change in building use, egress, or occupancy; existing street tress to remain and be protected.
Q00701267-S1
05/12/2025
Signed off — Alteration
Site restoration, grading, and soil work at the ground floor for proposed construction of vehicular sally port. No change in building use, egress, or occupancy; existing street tress to remain and be protected.
Q00701267-S5
03/17/2025
Permit issued — General Construction
Q00701267-I1-GC
01/09/2025
Filed — Alteration
Site restoration, grading, and soil work at the ground floor for proposed construction of vehicular sally port. No change in building use, egress, or occupancy; existing street tress to remain and be protected.
Q00701267-P6
01/09/2025
Special inspection requirement — Exterior lighting power
GEORGE GHEBRYAL
01/09/2025
Special inspection requirement — Maintenance information
GEORGE GHEBRYAL
01/09/2025
Special inspection requirement — Interior lighting power
GEORGE GHEBRYAL
01/09/2025
Special inspection requirement — Air barrier - visual inspection
GEORGE GHEBRYAL
01/09/2025
Special inspection requirement — Insulation placement and R values
GEORGE GHEBRYAL
01/09/2025
Special inspection requirement — Electrical motors and elevators
GEORGE GHEBRYAL
01/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
01/09/2025
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
01/09/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
11/20/2024
Permit issued — Plumbing
Q00766227-I1-PL
10/29/2024
Signed off — Alteration
Construction of timber debris chute, to lower demolition debris from slab opening on the top of bldg to 8th flr platform. Debris will be moved from 8th flr & will use existing elevator shafts as debris chutes onto 1st flr platform and load out offsite.
Q00753157-I1
10/03/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/02/2024
Filed — Alteration
Site restoration, grading, and soil work at the ground floor for proposed construction of vehicular sally port. No change in building use, egress, or occupancy; existing street tress to remain and be protected.
Q00701267-P5
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/13/2024
Signed off — Alteration
INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGES IN USE, EGRESS OR OCCUPANCY. FENCE TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
Q00762519-I1
06/13/2024
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33
Q00763025-I1
04/11/2024
Permit issued — Mechanical Systems
Q00701267-S2-MS
04/11/2024
Permit issued — General Construction
Q00701267-I1-GC
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/08/2024
Signed off — Alteration
Q00762507-I1
01/05/2024
Signed off — Alteration
INSTALLATION OF A TEMPORARY PERSONNEL/MATERIAL HOIST COMPLEX AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. CONSTRUCTION HOIST TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
Q00762193-I1
01/05/2024
Violation issued (ECB, closed)
Unknown
01/05/2024
Violation issued (ECB, closed)
Construction
11/16/2023
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33
Q00763025-P1
11/14/2023
Permit issued — Plumbing
Q00766227-I1-PL
10/24/2023
Filed — Alteration
Site restoration, grading, and soil work at the ground floor for proposed construction of vehicular sally port. No change in building use, egress, or occupancy; existing street tress to remain and be protected.
Q00701267-P4
10/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
Latest 60 of 213 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAMC Plumbing, Heating & CLNG06/22/2026
DOB NOWGeneral ConstructionPermit IssuedLeon D. Dematteis Construction06/17/2026
DOB NOWGeneral ConstructionSigned-offHunter Roberts Construction03/17/2025
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe11/20/2024
DOB NOWMechanical SystemsSigned-offHunter Roberts Construction04/11/2024
DOB NOWGeneral ConstructionSigned-offHunter Roberts Construction04/11/2024
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe11/14/2023
DOB NOWStandpipeSigned-offManengeering Bureau08/16/2023
DOB NOWSprinklersSigned-offManengeering Bureau08/16/2023
DOB NOWSidewalk ShedSigned-offStarr Industries06/23/2023
DOB NOWConstruction FenceSigned-offStarr Industries06/23/2023
DOB NOWProtection and Mechanical MethodsSigned-offStarr Industries06/21/2023
DOB NOWGeneral ConstructionSigned-offHunter Roberts Construction05/01/2023
DOB NOWMechanical SystemsSigned-offHunter Roberts Construction05/01/2023
DOB NOWPlumbingSigned-offCardoza Plumbing03/20/2023
DOB NOWStructuralSigned-offPal Environmental Safety02/15/2023
DOB NOWGeneral ConstructionSigned-offPal Environmental Safety02/10/2023
DOB NOWProtection and Mechanical MethodsSigned-offPal Environmental Safety12/02/2022
DOB NOWPlumbingSigned-offCardoza Plumbing08/29/2022
DOB NOWSprinklersSigned-offManengeering Bureau08/23/2022
DOB NOWStandpipeSigned-offManengeering Bureau08/23/2022
DOB NOWPlumbingSigned-offMes Construction08/05/2022
DOB NOWGeneral ConstructionSigned-offPal Environmental Safety07/26/2022
DOB NOWSupport of ExcavationSigned-offPrima Paving07/12/2022
DOB NOWSidewalk ShedSigned-offStarr Industries06/30/2022
DOB NOWSupported ScaffoldSigned-offStarr Industries06/30/2022
DOB NOWConstruction FenceSigned-offStarr Industries06/29/2022
DOB NOWProtection and Mechanical MethodsSigned-offStarr Industries06/29/2022
DOB NOWStructuralSigned-offPrima Paving06/03/2022
DOB NOWStructuralSigned-offPrima Paving06/03/2022
DOB NOWStructuralSigned-offHunter Roberts Construction06/02/2022
DOB NOWEarth WorkSigned-offPrima Paving05/23/2022
DOB NOWMechanical SystemsSigned-offHunter Roberts Construction05/06/2022
DOB NOWGeneral ConstructionSigned-offHunter Roberts Construction04/25/2022
DOB NOWSidewalk ShedSigned-offRennon Construction12/24/2020
BIS—ISSUEDPal Environmental Safety12/14/2023
BIS—ISSUEDPal Environmental Safety11/28/2023
BISEQISSUEDPal Environmental Safety04/24/2023
BIS—ISSUEDPal Environmental Safety04/24/2023
BISOTISSUEDLanmark Group10/21/2015
+ 45 more permits on file
1 project · most recent 10/13/2026
Storm
FiledStatusContractorScope
10/13/2026Permit IssuedAction & A1 Plumbing and Heating CoStorm
5 projects · most recent 03/22/2023
General Wiring
FiledStatusContractorScope
03/22/2023CompleteRedgrave Electl Maintnce—
09/02/2022CompleteJ.A. Lee Electric Services—
08/11/2022CompleteJ.A. Lee Electric Services—
03/22/2022CompleteEgg ElectricGeneral Wiring
01/08/2021Permit IssuedGreen Power Electric—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
03/04/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/03/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/19/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/19/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/28/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/28/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/22/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/22/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
06/12/2026Subgrade InspectionsGEORGE ANDERSENspecial
06/12/2026FinalGEORGE ANDERSENprogress
04/24/2026FinalGEORGE ANDERSENprogress
04/24/2026Subgrade InspectionsGEORGE ANDERSENspecial
01/09/2025Exterior lighting powerGEORGE GHEBRYALenergy_progress
01/09/2025Maintenance informationGEORGE GHEBRYALenergy_progress
01/09/2025Interior lighting powerGEORGE GHEBRYALenergy_progress
01/09/2025Air barrier - visual inspectionGEORGE GHEBRYALenergy_progress
01/09/2025Insulation placement and R valuesGEORGE GHEBRYALenergy_progress
01/09/2025Electrical motors and elevatorsGEORGE GHEBRYALenergy_progress
01/09/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
01/09/2025Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
01/09/2025FinalGEORGE GHEBRYALprogress
10/03/2023Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
10/03/2023Mechanical SystemsGEORGE GHEBRYALspecial
10/03/2023Post-installed AnchorsGEORGE GHEBRYALspecial
10/03/2023Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
10/03/2023FinalGEORGE GHEBRYALprogress
10/03/2023HVAC-R and service water heating equipmentGEORGE GHEBRYALenergy_progress
10/03/2023HVAC-R and service water heating system controlsGEORGE GHEBRYALenergy_progress
10/03/2023HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
01/30/2023FinalKIRK CESARETTIprogress
01/25/2023Post-installed AnchorsGEORGE GHEBRYALspecial
11/02/2022Shutoff dampersGEORGE GHEBRYALenergy_progress
11/02/2022Fire-Resistant Penetrations and Joints—special
Latest 25 of 55.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Queens Detention CenterGovernment / CivicCellar, Floors 1–8, Mezzanine, Penthouse, Roof
Project Q00772773 Alteration · LOC Issued · 07/18/2022
Project Q00724416 Alteration · LOC Issued · 04/27/2022
NYC Department of CorrectionGovernment / Civic—
Project Q00440016 Alteration · LOC Issued · 12/23/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 347 on file (BIS + DOB NOW)
▸Plans & Drawings39
▸DOB NOWPlans/Sketch38
08/26/2026Q00701267-S2Request digital key ↗
08/26/2026Q00701267-P6Request digital key ↗
08/26/2026Q00701267-P5Request digital key ↗
Showing 3 of 38 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/27/2026Q00440016-I1Request digital key ↗
▸Applications & Permits31
▸BISWORK PERMIT APPLICATION19
04/29/2025421791449Open ↗
04/23/2025421791449Open ↗
08/22/2023421791449Open ↗
Showing 3 of 19 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION12
07/19/2022421791449Open ↗
11/30/2020440603651Open ↗
09/12/2014420888971Open ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications116
▸DOB NOWDPL-1: Design Professional Seal & Signature39
08/26/2026Q00724758-I1Open ↗
08/26/2026Q00724758-P2Open ↗
08/26/2026Q00724758-P1Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWProgress Inspector Seal & Signature32
10/01/2026Q00701267-S1Open ↗
10/01/2026Q00701267-S1Open ↗
09/18/2026Q00772773-I1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
10/01/2026Q00701267-S1Open ↗
10/01/2026Q00701267-S1Open ↗
10/01/2026Q00701267-S1Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
08/22/2023421791449Open ↗
08/22/2023421791449Open ↗
11/18/2014420590088Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
09/25/2013420888971Open ↗
02/11/2010420139175Open ↗
12/30/2009420124118Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
02/11/2010420139175Open ↗
12/30/2009420124118Open ↗
12/10/2008410202640Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
11/30/2020440603651Open ↗
09/25/2013420888971Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/30/2020440603651Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/30/2020440603651Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING2
09/25/2013420888971Open ↗
07/07/2012420590088Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
02/13/2014420590088Open ↗
11/13/2013420590088Open ↗
▸BISGAS CUT-OFF1
08/22/2023421791449Open ↗
▸BISSEWER CUT-OFF1
08/22/2023421791449Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
07/07/2012420590088Open ↗
▸Safety & Tenant Protection4
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
04/29/2025421791449Open ↗
08/22/2023421791449Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
08/22/2023421791449Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/22/2023421791449Open ↗
▸Environmental & Asbestos18
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
03/26/2014420888971Open ↗
11/10/2012420781130Open ↗
11/10/2012420781130Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/26/2026Q00724758-I1Open ↗
08/18/2026Q00766227-I1Open ↗
08/13/2026Q00724416-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
02/11/2010420139175Open ↗
12/30/2009420124118Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/22/2008410111720Open ↗
▸BISASBESTOS INSPECTION REPORT1
12/10/2008410202640Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
11/18/2014420590088Open ↗
01/14/2013420590088Open ↗
07/07/2012420590088Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00701267-S2Open ↗
08/13/2026Q00701267-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/30/2020440603651Open ↗
▸BISNYCECC ANALYSIS1
11/30/2020440603651Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/30/2020440603651Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00701267-S2Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
11/30/2020440603651Open ↗
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
07/09/2012420590088Open ↗
▸Approvals, Objections & Sign-offs87
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter39
08/26/2026Q00724758-P1Open ↗
08/26/2026Q00724758-P2Open ↗
08/26/2026Q00724758-I1Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)14
08/13/2026Q00701267-P5Open ↗
08/13/2026Q00766227-P1Open ↗
08/13/2026Q00701267-P6Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION13
04/29/2025421791449Open ↗
04/29/2025421791449Open ↗
08/22/2023421791449Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
09/25/2013420888971Open ↗
11/10/2012420781130Open ↗
07/07/2012420590088Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)7
08/13/2026Q00701267-S2Open ↗
08/13/2026Q00701267-S1Open ↗
08/13/2026Q00440016-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/26/2026Q00724758-I1Open ↗
08/13/2026Q00724416-I1Open ↗
08/13/2026Q00724797-I1Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
11/30/2020440603651Open ↗
▸BISSUPERSEDING LETTER1
04/23/2025421791449Open ↗
▸BISSHED LETTER1
09/18/2012420124118Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/22/2010410202640Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT7
11/30/2020440603651Open ↗
09/25/2013420888971Open ↗
11/10/2012420781130Open ↗
Showing 3 of 7 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
04/29/2025421791449Open ↗
04/23/2025421791449Open ↗
08/22/2023421791449Open ↗
▸BISDEPT OF FINANCE VERIFICATION3
04/29/2025421791449Open ↗
08/22/2023421791449Open ↗
08/22/2023421791449Open ↗
▸Filing & Intake Forms17
▸BISEFILING COVER SHEET7
07/19/2022421791449Open ↗
09/25/2013420888971Open ↗
11/10/2012420781130Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION5
04/29/2025421791449Open ↗
04/23/2025421791449Open ↗
08/22/2023421791449Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM4
04/29/2025421791449Open ↗
04/23/2025421791449Open ↗
08/22/2023421791449Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
11/30/2020440603651Open ↗
▸Other Documents4
▸DOB NOWWaiver Document3
08/13/2026Q00724797-I1Open ↗
08/13/2026Q00724416-I1Open ↗
08/13/2026Q00724758-I1Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
11/30/2020440603651Open ↗