ECB06/17/2003B4B,4A,19B,50A,50B,50C. 50A)NO CHECK VALVE(BACK FLOW PREVENTER) ON BOILER FEED LINE. 50B)SAFETY RELIEF VALVE MUST BE IN VERTICAL POSITION 50C)SAFETY RELIEF VALVE BLOW DOWN PIPE CAN NOT HAVE THREADS ON ENDNothing owed — awaiting certificate of correction
Locations of Work
No floor-level scope or drawing coverage on file for this building.