← Back
Office with commercial, 7-19 stories
126 Fifth Avenue
126 5 AVENUE · BIN 1015421
💬 Discuss this project
1906Year Built
15Stories
O6Building Class
C6-4MZoning
100,621 sfGross Floor Area
33Units
LL97 Covered3 Open Violations 2 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Office with commercial, 7-19 stories · Owner of record: 126-8 FIFTH AVENUE, LLC · 6,900 sf lot · 14.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipment
Roof2p · 3 filings · 7 docs
Floor 31p · 2 filings · 4 docs
Floor 21p · 1 filing · 6 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AVISON YOUNG207/08/2026
126-8 FIFTH AVENUE13207/08/2026
RESTORATION CORP COLGATE203/22/2026
A WR GROUP INC103/22/2026
126 FIFTH AVENUE LL C/O H103/22/2026
ROCK GROUP NY103/22/2026
126-124 FIFTH AVE103/22/2026
126-128 5 AVE203/22/2026
126-128 FIFTH AVENUE503/22/2026
THEO DOR REALTY703/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OUTSOURCE CONSULTANTS, INC.203/21/2026
RIGGING CONSULTANTS403/21/2026
LEWSAN CONSULTING203/21/2026
CCM CONSULTING GROUP, INC.103/21/2026
Rigid Structural Design, LLC403/21/2026
NEW YORK ENGINEERING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COLGATE RESTORATION CORPGeneral Contractor607/08/2026
HEMNATH, BHOOWANESHWARNAUTHElectrical303/21/2026
INTERSYSTEMS INSTAL S&SGeneral Contractor304/09/2026
HICKEY, DAVIDElectrical303/21/2026
AMERICAN RIGGING CORPElectrical303/21/2026
INTERSYSTEM INSTALLATIONGeneral Contractor204/09/2026
THOMPSON, NElectrical203/21/2026
METRO RF SERVICES INCGeneral Contractor107/08/2026
RAMAPO COMMUNICATION CORPGeneral Contractor107/08/2026
VECTRA CONSTRUCTION CORPGeneral Contractor104/09/2026
HARARI DAVIDElectrical103/21/2026
METROPOLIS ELECTRIC CORPElectrical103/22/2026
M & M CONTROL WIRING &Electrical103/22/2026
STEVEN FARKASElectrical103/21/2026
TREVOR DUNWELLElectrical103/21/2026
CONDITIONING CONTROL SYSTEMSGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851111/19/2025
SRA INSPECTIONS3461108/15/2025
PCS ENGINEERING3745107/17/2024
SPECIAL TESTING & CONSULT1688102/24/2023
GREGORY V. PEROTTO, P.E.947109/21/2021
Building Lifecycle
All (163)Filed (10)Permit Issued (16)Signed Off (6)Facade (FISP) (31)Violation (60)Inspection (1)Objection (20)Special Inspection (19)
07/01/2026
Signed off — Alteration
INSTALL REPLACEMENT AIR CONDITIONING PACKAGE UNIT.
M01277654-I1
02/06/2026
Violation issued (FDNY_NOV, closed)
01/08/2026
Violation issued (FDNY_ORDER, closed)
01/08/2026
Violation issued (FDNY_ORDER, closed)
01/08/2026
Violation issued (FDNY_NOV, closed)
01/02/2026
Permit issued — Mechanical Systems
M01277654-I1-MS
12/09/2025
Signed off — Alteration
Installation of temporary sidewalk shed as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00642801-I1
11/19/2025
Filed — Alteration
INSTALL REPLACEMENT AIR CONDITIONING PACKAGE UNIT.
M01277654-I1
11/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
11/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
11/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
11/17/2025
Special inspection requirement — Maintenance information
LOUIS ARENA
10/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
09/30/2025
Signed off — Alteration
INSTALLATION OF ROOF OVERHEAD PROTECTION AS SHOWN ON DRAWINGS. NO CHANGE IN EGRESS, USE OR OCCUPANCY. WE SHALL COMPLY WITH CHPATER 33 OF 2022 B,C
M01151363-I1
08/29/2025
Cycle 9 facade report submitted
08/28/2025
Cycle 9 facade inspection completed
08/28/2025
Cycle 9 facade report signed — UNSAFE
08/26/2025
Special inspection requirement — Final
LOUIS ARENA
08/26/2025
Special inspection requirement — Mechanical Systems
LOUIS ARENA
08/25/2025
Permit issued — Sidewalk Shed
M00642801-I1-SH
08/25/2025
Cycle 9 facade report signed — SAFE
08/25/2025
Objection raised — Scope
08/25/2025
Objection raised — Fire_Protection
08/25/2025
Objection raised — Scope
08/25/2025
Objection raised — Cost
08/15/2025
Filed — Alteration
M01245382-I1
06/09/2025
Violation issued (FDNY_NOV, closed)
06/07/2025
Cycle 9 facade report submitted
05/31/2025
Cycle 9 facade report submitted
05/30/2025
Cycle 9 facade report signed — UNSAFE
05/22/2025
Signed off — Alteration
Facade restoration, work to include pointing of masonry joints, face brick and sill replacement, terra cotta and limestone repairs, and shelf angle replacement and corner reconstruction as per plans filed herewith. No change in use, egress or occupancy.
M08051364-I1
05/02/2025
Cycle 9 facade inspection completed
05/02/2025
Cycle 9 facade inspection completed
03/10/2025
Permit issued — Suspended Scaffold
M01018760-I1-SC
03/04/2025
Filed — Alteration
INSTALLATION OF ROOF OVERHEAD PROTECTION AS SHOWN ON DRAWINGS. NO CHANGE IN EGRESS, USE OR OCCUPANCY. WE SHALL COMPLY WITH CHPATER 33 OF 2022 B,C
M01151363-I1
03/04/2025
Permit issued — Protection and Mechanical Methods
M01151363-I1-PMM
03/03/2025
Permit issued — General Construction
M08051364-I1-GC
02/11/2025
Violation issued (FDNY_NOV, closed)
01/31/2025
Violation issued (FDNY_NOV, closed)
12/18/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/17/2024
Cycle 9 facade report submitted
12/10/2024
Cycle 9 facade report signed — UNSAFE
12/02/2024
Cycle 9 facade inspection completed
11/22/2024
Violation issued (FDNY_ORDER, closed)
11/22/2024
Violation issued (FDNY_ORDER, closed)
09/17/2024
Permit issued — Sidewalk Shed
M00642801-I1-SH
09/16/2024
Filed — Alteration
Installation of temporary sidewalk shed as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00642801-P1
07/24/2024
Permit issued — Suspended Scaffold
M01070923-I1-SC
07/17/2024
Filed — Alteration
FACADE INSPECTION VIA INDUSTRIAL ROPE ACCESS AS SHOWN ON PLANS
M01070923-I1
05/02/2024
Permit issued — General Construction
M08051364-I1-GC
03/14/2024
Permit issued — Suspended Scaffold
M01018760-I1-SC
03/13/2024
Filed — Alteration
M01018760-I1
01/26/2024
Violation issued (FDNY_NOV, closed)
01/26/2024
Violation issued (FDNY_NOV, closed)
01/26/2024
Violation issued (FDNY_ORDER, closed)
12/22/2023
Cycle 9 facade report submitted
12/18/2023
Cycle 9 facade report signed — UNSAFE
12/01/2023
Cycle 9 facade inspection completed
11/22/2023
Violation issued (FDNY_NOV, closed)
09/27/2023
Permit issued — Sidewalk Shed
M00642801-I1-SH
Latest 60 of 163 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offVECTRA CONSTRUCTION CORP01/02/2026
DOB NOWSidewalk ShedSigned-offINTERSYSTEMS INSTAL S&S08/25/2025
DOB NOWSuspended ScaffoldPermit IssuedCOLGATE RESTORATION CORP03/10/2025
DOB NOWProtection and Mechanical MethodsSigned-offCOLGATE RESTORATION CORP03/04/2025
DOB NOWGeneral ConstructionSigned-offCOLGATE RESTORATION CORP03/03/2025
DOB NOWSidewalk ShedSigned-offINTERSYSTEMS INSTAL S&S09/17/2024
DOB NOWSuspended ScaffoldPermit IssuedCOLGATE RESTORATION CORP07/24/2024
DOB NOWGeneral ConstructionSigned-offCOLGATE RESTORATION CORP05/02/2024
DOB NOWSuspended ScaffoldPermit IssuedCOLGATE RESTORATION CORP03/14/2024
DOB NOWSidewalk ShedSigned-offINTERSYSTEMS INSTAL S&S09/27/2023
DOB NOWGeneral ConstructionSigned-offCOLGATE RESTORATION CORP05/05/2023
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION10/07/2022
DOB NOWMechanical SystemsSigned-offCONDITIONING CONTROL SYST12/30/2021
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION12/09/2021
DOB NOWAntennaPermit IssuedRAMAPO COMMUNICATION CORP06/05/2020
DOB NOWAntennaSigned-offMETRO RF SERVICES INC12/05/2018
BIS—ISSUED126-8 FIFTH AVENUE LLC02/24/2026
BIS—ISSUED126-8 FIFTH AVENUE LLC08/07/2025
BIS—ISSUED126-8 FIFTH AVENUE LLC07/24/2024
BIS—ISSUED126-8 FIFTH AVENUE LLC04/05/2022
BIS—ISSUED126-8 FIFTH AVENUE LLC04/13/2021
BISSPISSUEDCAPITOL FIRE SPRINKLER CO03/30/2021
BISSPISSUEDEAGLE MECHANICAL INC11/20/2019
BISSPISSUEDCAPITOL FIRE SPRINKLER CO07/11/2019
BISOTISSUEDTOMCO RETAIL CONSTRUCTION07/10/2019
BISOTISSUEDTOMCO RETAIL CONSTRUCTION07/10/2019
BISSPISSUEDTRISTATE PLBG SVCS CORP04/19/2019
BIS—ISSUED126-8 FIFTH AVENUE LLC03/29/2019
BISPLISSUEDTRISTATE PLBG SVCS CORP10/30/2018
BISMHISSUEDBIRCH CONSTRUCTION GROUP10/11/2018
BISOTISSUEDKILLOWEN CONSTRUCTION IN09/25/2018
BISOTISSUEDPRESTIGE CUSTOM BUILDING05/14/2018
BIS—ISSUED126-8 FIFTH AVENUE LLC03/19/2018
BISOTISSUEDMETRO RF SERVICES INC12/28/2017
BISOTISSUEDC S CORNERSTONE INC12/13/2017
BISEQISSUEDINTERSYSTEM S&S CORP10/03/2017
BISOTISSUEDKILLOWEN CONSTRUCTION IN08/30/2017
BISEQISSUEDINTERSYSTEM S&S CORP07/28/2017
BIS—ISSUED126-8 FIFTH AVENUE LLC04/05/2017
BISOTISSUEDMETRO RF SERVICES INC03/31/2017
+ 26 more permits on file
1 project · most recent 11/19/2025
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
11/19/2025Signed-offVECTRA CONSTRUCTION CORPAir Conditioning Systems, Heating Systems
Cooling
Sigma SIG-SDSV240D.1 240,000 BTU ×1
Heating
Sigma SIG-SDSV240D.1 255,900 BTU ×1
7 projects · most recent 04/21/2026
General Wiring
FiledStatusContractorScope
04/21/2026CompleteBNH ELECTRICAL CORPGeneral Wiring
08/21/2024CompleteCONDUCTOR ELECL SVCS INCGeneral Wiring
09/16/2022Permit IssuedKNIGHT ELEC'L SERV. CORP.General Wiring
07/14/2022Permit IssuedJSP ELECTL CNTNG CORPGeneral Wiring
12/13/2021CompleteSTEVEN FARKAS—
07/11/2019CompleteM & M CONTROL WIRING &—
11/06/2018CompleteMETROPOLIS ELECTRIC CORPGeneral Wiring
1 project · most recent 07/17/2024
FiledStatusContractorScope
07/17/2024Permit IssuedCOLGATE RESTORATION CORP—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/02/2022Pass-Final Sign Permit InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
11/17/2025HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
11/17/2025HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
11/17/2025HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
11/17/2025Maintenance informationLOUIS ARENAenergy_progress
10/27/2025Tenant Protection Plan ComplianceLOUIS ARENAspecial
08/26/2025FinalLOUIS ARENAprogress
08/26/2025Mechanical SystemsLOUIS ARENAspecial
12/12/2022Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
12/12/2022Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
12/12/2022MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
12/07/2022FinalKenneth Santelliprogress
09/21/2021Fire-Resistant Penetrations and JointsGregory Perottospecial
09/21/2021Energy Code Compliance InspectionsSteven Bendoraitisprogress
09/21/2021HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
09/21/2021Maintenance informationSteven Bendoraitisenergy_progress
09/21/2021HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
09/21/2021HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
08/02/2021FinalSteven Bendoraitisprogress
08/02/2021Mechanical SystemsGregory Perottospecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
AthletaRetailCellar, Floor 1
Project M00568541 Alteration · LOC Issued · 09/21/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 1,209 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/03/2026M00568541-I1Request digital key ↗
08/27/2026M01018760-I1Request digital key ↗
08/26/2026M01070923-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits224
▸BISPLAN / WORK APPROVAL APPLICATION115
09/15/2025123417463Open ↗
09/15/2025120987922Open ↗
04/18/2023101428000Open ↗
Showing 3 of 115 on file for this type
▸BISWORK PERMIT APPLICATION105
11/20/2019120963804Open ↗
07/19/2019123901689Open ↗
07/11/2019123890593Open ↗
Showing 3 of 105 on file for this type
▸DOB NOWLPC Approval/Permit3
08/13/2026M00568541-I1Open ↗
08/13/2026M01245382-I1Open ↗
08/13/2026M08051364-I1Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications249
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION161
03/04/2020123901689Open ↗
03/04/2020123901689Open ↗
03/04/2020123901689Open ↗
Showing 3 of 161 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST26
06/06/2019123890593Open ↗
05/10/2019123901689Open ↗
Showing 2 of 26 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT22
06/06/2019123890593Open ↗
06/06/2019123890593Open ↗
06/06/2019123890593Open ↗
Showing 3 of 22 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026M01277654-I1Open ↗
09/23/2026M01277654-I1Open ↗
08/27/2026M08051364-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/06/2026M00017346-I1Open ↗
08/26/2026M01070923-I1Open ↗
08/26/2026M00642801-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026M01277654-I1Open ↗
08/27/2026M08051364-I1Open ↗
08/25/2026M00568541-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment91
▸BISSELF-CERT PLUMBING NOTICE30
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 30 on file for this type
▸BISSCHEDULE B - PLUMBING17
03/25/2021123890593Open ↗
Showing 1 of 17 on file for this type
▸BISEQUIPMENT USE PERMITS13
02/10/2020123901689Open ↗
01/07/2020123901689Open ↗
01/07/2020123901689Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE12
06/06/2019123890593Open ↗
Showing 1 of 12 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA7
03/04/2020121787995Open ↗
02/27/2020123808022Open ↗
05/06/2019123808022Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
02/10/2020123901689Open ↗
11/29/2019120963804Open ↗
Showing 2 of 6 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSIGN HANGER CERTIFICATE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection10
▸BISTenant Protection Plan and Notes9
05/10/2019123901689Open ↗
Showing 1 of 9 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos67
▸BISASBESTOS: CERTIFICATION (DEP ACP5)34
06/06/2019123890593Open ↗
05/24/2019123890593Open ↗
05/10/2019123901689Open ↗
Showing 3 of 34 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/15/2026M00017346-I1Open ↗
08/13/2026M08051364-I1Open ↗
08/13/2026M01245382-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance88
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS56
03/04/2020123901689Open ↗
02/10/2020123901689Open ↗
11/29/2019120963804Open ↗
Showing 3 of 56 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS20
04/16/2021123890593Open ↗
02/10/2020123901689Open ↗
11/29/2019120963804Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: ENERGY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
04/16/2021123890593Open ↗
04/16/2021123890593Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00568541-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY7
04/16/2021123890593Open ↗
04/16/2021123890593Open ↗
04/16/2021123890593Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs173
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST56
04/16/2021123890593Open ↗
03/24/2020121787995Open ↗
03/17/2020121787995Open ↗
Showing 3 of 56 on file for this type
▸BISLANDMARKS APPROVAL53
02/10/2020123901689Open ↗
11/29/2019120963804Open ↗
07/31/2019123302684Open ↗
Showing 3 of 53 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION30
03/04/2020123901689Open ↗
07/31/2019123302684Open ↗
07/31/2019123302684Open ↗
Showing 3 of 30 on file for this type
▸BISADMINISTRATIVE OBJECTIONS25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISSUPERSEDING LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISLANDMARKS SIGNOFF3
04/16/2021123890593Open ↗
03/15/2019121791196Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
09/26/2019104175330Open ↗
05/30/2019104175330Open ↗
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership99
▸BISCOST AFFIDAVIT94
04/16/2021123890593Open ↗
03/24/2020121787995Open ↗
03/17/2020121787995Open ↗
Showing 3 of 94 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
11/22/2021123808022Open ↗
▸Filing & Intake Forms135
▸BISEFILING COVER SHEET58
06/06/2019123890593Open ↗
06/06/2019123890593Open ↗
06/06/2019123890593Open ↗
Showing 3 of 58 on file for this type
▸BISBOROUGH INTAKE FORM37
03/24/2020121787995Open ↗
03/17/2020121787995Open ↗
03/04/2020123901689Open ↗
Showing 3 of 37 on file for this type
▸BISADDITIONAL INFORMATION36
12/20/2019104175330Open ↗
07/24/2019104175330Open ↗
04/16/2019123302684Open ↗
Showing 3 of 36 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Other Documents54
▸BISLOFT BOARD CERTIFICATE29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWLoft Board Certificate7
08/15/2026M00017346-I1Open ↗
08/13/2026M00642801-I1Open ↗
08/13/2026M08051364-I1Open ↗
Showing 3 of 7 on file for this type
▸BISSupporting Document: Fee Exempt2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSupporting Document: Fee Deferment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
08/13/2026M01070923-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01018760-I1Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026M08051364-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01018760-I1Open ↗