Elevator apt, semi-fireproof with stores
Paseo on Fifth
126 5TH AVENUE · Park Slope · BIN 3430168
💬 Discuss this project
2023Year Built
6Stories
D7Building Class
R6AZoning
265,855 sfGross Floor Area
182Units
Rent Stabilized2 Active Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: 120 JV Acq · 70,008 sf lot · 3.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofAm Macklowe Company8p · 3 filings · 20 docs
Floor 4William Macklowe Company3p · 1 filing · 7 docs
Floor 3William Macklowe Company3p · 1 filing · 7 docs
Floor 2CVS, Unit 204, Unit 2059p · 3 filings · 20 docs
Floor 1Wels Farg, CVS13p · 8 filings · 20 docs
CellarCVS13p · 5 filings · 20 docs
Site & exteriorPlanet Fitness, CVS Pharmacy38p · 12 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
William Macklowe Company6807/08/2026
120 JV Acq1103/22/2026
FM Construction Group707/08/2026
Pick Quick Foods403/21/2026
120 5Ave9 Owner403/21/2026
Keyfood203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/24/2020$59.4M—120 5AVE9 OWNER, LLC → 120 JV ACQ LLC— not available
03/24/2017$45.7M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Codegreen1403/21/2026
Perciballi Industries203/21/2026
Universal Signs Service203/21/2026
Burnham Nationwide703/21/2026
Bohler Engineering903/21/2026
Rigid Structural Design503/21/2026
Stracar Engineering P403/21/2026
Louis Striar603/21/2026
Sol Building Consulting Services303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Republic Exterior ServiceScaffold1107/08/2026
Source ConstructionGeneral Contractor903/21/2026
Tristate Fire SprinklersFire Protection407/08/2026
Perciballi IndustriesScaffold307/08/2026
Republic Scaffold & HoistScaffold307/08/2026
Melito ConstructionGeneral Contractor307/08/2026
Vericon Construction CoGeneral Contractor307/08/2026
Difazio Electric NYElectrical303/22/2026
Ultimate Signs & Designs CoSign hanger307/08/2026
Headquarters MechanicalPlumbing307/08/2026
FM Construction GroupScaffold207/08/2026
A & F Fire Protection CoFire Protection107/08/2026
Noble Construction GRGeneral Contractor107/08/2026
Universal Signs & ServiceSign hanger107/08/2026
Stalwart PlumbingFire Protection107/08/2026
Stalwart PlumbingPlumbing107/08/2026
Maccarone PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sag Engineering & Consulting608910/31/2025
Obaid Mian849910/07/2025
Stracar Special Inspectio229207/25/2025
Socotec Engineering4983804/04/2025
Langan Engineering, Env, Surveyin1265112/17/2021
Building Lifecycle
All (255)Filed (47)Permit Issued (37)Signed Off (21)Violation (24)Inspection (20)Objection (76)Special Inspection (30)
06/12/2026
Signed off — Alteration
ERECT ACCESSORY BUSINESS WALL SIGN FOR PLANET FITNESS, NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
B01366088-I1
03/10/2026
Permit issued — Sign
B01366088-I1-SG
03/06/2026
Filed — Alteration
ERECT ACCESSORY BUSINESS WALL SIGN FOR PLANET FITNESS, NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
B01366088-I1
03/03/2026
Signed off — Alteration
INSTALLATION OF POWER POLE SCAFFOLDING SYSTEM AROUND PERIMETER OF BUILDING AS PER PLANS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00944003-I1
03/02/2026
Special inspection requirement — Final
JERE MURDOCH
01/27/2026
Violation issued (FDNY_ORDER, closed)
11/19/2025
Signed off — Alteration
The reinforcement of the first-floor structure for the installation of new bank equipment for the interior tenant fit-out (Wells Fargo). There will be no change in use, egress, or occupancy.
B01171611-I1
11/17/2025
Signed off — Alteration
The reinforcement of the first-floor structure for the installation of new bank equipment for the interior tenant fit-out (Wells Fargo). There will be no change in use, egress, or occupancy.
B01171611-S1
11/05/2025
Violation issued (FDNY_NOV, closed)
11/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chester Kowalski
11/03/2025
Special inspection requirement — Final
Chester Kowalski
11/03/2025
Special inspection requirement — Lighting controls
Chester Kowalski
11/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Chester Kowalski
11/03/2025
Special inspection requirement — Insulation placement and R values
Chester Kowalski
11/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
Chester Kowalski
11/03/2025
Special inspection requirement — Interior lighting power
Chester Kowalski
11/03/2025
Special inspection requirement — Air barrier - visual inspection
Chester Kowalski
10/31/2025
Filed — Alteration
The reinforcement of the first-floor structure for the installation of new bank equipment for the interior tenant fit-out (Wells Fargo). There will be no change in use, egress, or occupancy.
B01171611-P5
10/29/2025
Special inspection requirement — Lighting controls
Chester Kowalski
10/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chester Kowalski
10/29/2025
Special inspection requirement — Air barrier - visual inspection
Chester Kowalski
10/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
Chester Kowalski
10/29/2025
Special inspection requirement — Insulation placement and R values
Chester Kowalski
10/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Chester Kowalski
10/29/2025
Special inspection requirement — Final
Chester Kowalski
10/29/2025
Special inspection requirement — Interior lighting power
Chester Kowalski
10/21/2025
Signed off — Alteration
INTERIOR RENOVATION OF GROUND & CELLAR FLOOR COMMERCIAL SPACE FOR NEW CVS STORE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01129893-S2
10/20/2025
Signed off — Alteration
NON-ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - CVS PHARMACY. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01260326-I1
10/17/2025
Signed off — Alteration
ILLUMINATED NON-ADVERTISING DOUBLE-FACE PROJECTING ACCESSORY SIGN - CVS PHARMACY. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01260325-I1
10/17/2025
Signed off — Alteration
B01260324-I1
10/17/2025
Signed off — Alteration
The reinforcement of the first-floor structure for the installation of new bank equipment for the interior tenant fit-out (Wells Fargo). There will be no change in use, egress, or occupancy.
B01171611-S3
10/16/2025
Signed off — Alteration
INTERIOR RENOVATION OF GROUND & CELLAR FLOOR COMMERCIAL SPACE FOR NEW CVS STORE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01129893-I1
10/16/2025
Special inspection requirement — Mechanical Systems
Obaid Mian
10/16/2025
Special inspection requirement — Duct leakage testing, insulation and design
Obaid Mian
10/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Obaid Mian
10/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
Obaid Mian
10/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
Obaid Mian
10/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
Obaid Mian
10/16/2025
Special inspection requirement — Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components
Obaid Mian
10/16/2025
Special inspection requirement — Final
Obaid Mian
10/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Obaid Mian
10/15/2025
Signed off — Alteration
Tenant sprinkler system as per plans
B01162346-I1
10/14/2025
Signed off — Alteration
The reinforcement of the first-floor structure for the installation of new bank equipment for the interior tenant fit-out (Wells Fargo). There will be no change in use, egress, or occupancy.
B01171611-S2
10/07/2025
Filed — Alteration
INTERIOR RENOVATION OF GROUND & CELLAR FLOOR COMMERCIAL SPACE FOR NEW CVS STORE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01129893-P3
10/03/2025
Signed off — Alteration
INTERIOR RENOVATION OF GROUND & CELLAR FLOOR COMMERCIAL SPACE FOR NEW CVS STORE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01129893-S3
10/03/2025
Signed off — Alteration
INTERIOR RENOVATION OF GROUND & CELLAR FLOOR COMMERCIAL SPACE FOR NEW CVS STORE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01129893-S4
10/03/2025
Special inspection requirement — Final
Obaid Mian
10/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Obaid Mian
10/03/2025
Special inspection requirement — Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components
Obaid Mian
10/03/2025
Special inspection requirement — Mechanical Systems
Obaid Mian
10/01/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/26/2025
Filed — Alteration
Sprinkler renovations. No change in use, egress, or occupancy.
B01243106-P2
08/21/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/21/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
08/19/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/13/2025
Permit issued — Sprinklers
B01243106-I1-EW-SP
08/11/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/09/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/08/2025
Permit issued — Sign
B01260324-I1-SG
08/07/2025
Permit issued — Sign
B01260325-I1-SG
Latest 60 of 255 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offUniversal Signs & Service03/10/2026
DOB NOWSprinklersPermit IssuedAdvanced Automatic Sprinkler Co08/13/2025
DOB NOWSignSigned-offUltimate Signs & Designs Co08/08/2025
DOB NOWSignSigned-offUltimate Signs & Designs Co08/07/2025
DOB NOWSignSigned-offUltimate Signs & Designs Co08/07/2025
DOB NOWGeneral ConstructionSigned-offNoble Construction GR04/23/2025
DOB NOWStructuralSigned-offVericon Construction Co04/02/2025
DOB NOWBoiler EquipmentSigned-offHeadquarters Mechanical03/28/2025
DOB NOWConstruction FencePermit IssuedRepublic Exterior Service03/26/2025
DOB NOWPlumbingSigned-offMaccarone Plumbing03/25/2025
DOB NOWGeneral ConstructionSigned-offVericon Construction Co03/20/2025
DOB NOWMechanical SystemsSigned-offVericon Construction Co03/20/2025
DOB NOWSprinklersSigned-offTristate Fire Sprinkler01/23/2025
DOB NOWStandpipeSigned-offTristate Fire Sprinkler01/23/2025
DOB NOWSprinklersSigned-offStalwart Plumbing01/15/2025
DOB NOWMechanical SystemsSigned-offMelito Construction01/10/2025
DOB NOWStructuralSigned-offMelito Construction01/10/2025
DOB NOWPlumbingSigned-offStalwart Plumbing01/06/2025
DOB NOWGeneral ConstructionSigned-offMelito Construction01/02/2025
DOB NOWBoiler EquipmentSigned-offHeadquarters Mechanical10/28/2024
DOB NOWProtection and Mechanical MethodsSigned-offRepublic Scaffold & Hoist05/13/2024
DOB NOWSupported ScaffoldPermit IssuedRepublic Scaffold & Hoist05/03/2024
DOB NOWSupported ScaffoldSigned-offFM Construction Group04/12/2024
DOB NOWConstruction FencePermit IssuedRepublic Exterior Service04/04/2024
DOB NOWSidewalk ShedPermit IssuedRepublic Exterior Service04/04/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedRepublic Scaffold & Hoist03/07/2024
DOB NOWStandpipeSigned-offTristate Fire Sprinkler01/25/2024
DOB NOWSprinklersSigned-offTristate Fire Sprinkler01/25/2024
DOB NOWSupported ScaffoldSigned-offFM Construction Group10/17/2023
DOB NOWConstruction FencePermit IssuedRepublic Exterior Service04/03/2023
DOB NOWSidewalk ShedPermit IssuedRepublic Exterior Service04/03/2023
DOB NOWPlumbingSigned-offHeadquarters Mechanical01/18/2023
DOB NOWFoundationSigned-offSource Construction08/11/2022
DOB NOWConstruction FenceSigned-offPerciballi Industries07/13/2022
DOB NOWFoundationSigned-offSource Construction04/12/2022
DOB NOWFoundationSigned-offSource Construction01/12/2022
DOB NOWConstruction FenceSigned-offPerciballi Industries08/09/2021
BIS—ISSUEDNoble Construction GR05/09/2025
BISPLISSUEDHeadquarters Mechanical12/11/2024
BIS—ISSUEDNoble Construction GR06/19/2024
+ 9 more permits on file
1 project · most recent 10/07/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/07/2025Signed-offMelito ConstructionHeating and Air Conditioning Systems
Heat / Cool
Trane DXHG-048A1 48,000 BTU · Pump ×20
DXHG-036A1 36,000 BTU · Pump ×4
DXHG-024A1 26,000 BTU · Pump ×2
EXHG-018A1 18,000 BTU · Pump ×2
1 project · most recent 08/26/2025
FiledStatusContractorScope
08/26/2025Permit IssuedA & F Fire Protection Co68 heads
2 projects · most recent 10/07/2025
Water/Sanitary
FiledStatusContractorScope
10/07/2025Signed-offStalwart PlumbingWater/Sanitary
08/26/2025———
17 projects · most recent 04/02/2026
General Wiring Lighting
FiledStatusContractorScope
04/02/2026CompleteTF ElectricalGeneral Wiring
04/02/2026CompleteTF ElectricalGeneral Wiring
04/02/2026CompleteTF ElectricalGeneral Wiring
10/10/2025CompleteUltimate Signs & Electric—
10/10/2025CompleteUltimate Signs & Electric—
09/16/2025Permit IssuedDifazio Electric NYGeneral Wiring
09/16/2025Permit IssuedDifazio Electric NYGeneral Wiring
09/16/2025Permit IssuedDifazio Electric NYGeneral Wiring
09/16/2025CancelledDifazio Electric NYGeneral Wiring
07/29/2025Permit IssuedSRM Electrical ServiceGeneral Wiring, Lighting
04/28/2025CompleteCopper-City ElectricGeneral Wiring
03/18/2025Permit IssuedSRM Electrical Service—
12/12/2023CancelledDifazio Electric NYGeneral Wiring
03/31/2023CompleteNash Electric Services—
01/26/2023CompleteLippolis ElectricGeneral Wiring
1 project · most recent 10/07/2025
FiledStatusContractorScope
10/07/2025Signed-offMelito Construction1 scope_items
2 projects · most recent 03/31/2023
Sidewalk Shed Fence
FiledStatusContractorScope
03/31/2023Permit IssuedRepublic Exterior ServiceSidewalk Shed
03/31/2023Permit IssuedRepublic Exterior ServiceFence
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
10/01/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/21/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/21/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
08/19/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/11/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/30/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
07/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/02/2025Pass-Final General Construction Non-Directive 14PassView ↗
04/22/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/22/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
04/22/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/04/2025Pass-Final Boiler Equipment InspectionPassView ↗
04/02/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/02/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/05/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/24/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/08/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 102
DateRequirementInspectorRole
03/02/2026FinalJERE MURDOCHprogress
11/03/2025Energy Code Compliance InspectionsChester Kowalskiprogress
11/03/2025FinalChester Kowalskiprogress
11/03/2025Interior lighting powerChester Kowalskienergy_progress
11/03/2025Insulation placement and R valuesChester Kowalskienergy_progress
11/03/2025Fire-Resistant Penetrations and JointsChester Kowalskispecial
11/03/2025Air barrier - visual inspectionChester Kowalskienergy_progress
11/03/2025Fire-Resistance Rated ConstructionChester Kowalskiprogress
11/03/2025Lighting controlsChester Kowalskienergy_progress
10/29/2025Interior lighting powerChester Kowalskienergy_progress
10/29/2025Insulation placement and R valuesChester Kowalskienergy_progress
10/29/2025Air barrier - visual inspectionChester Kowalskienergy_progress
10/29/2025Lighting controlsChester Kowalskienergy_progress
10/29/2025Fire-Resistance Rated ConstructionChester Kowalskiprogress
10/29/2025FinalChester Kowalskiprogress
10/29/2025Energy Code Compliance InspectionsChester Kowalskiprogress
10/29/2025Fire-Resistant Penetrations and JointsChester Kowalskispecial
10/16/2025HVAC-R and service water heating system controlsObaid Mianenergy_progress
10/16/2025Energy Code Compliance InspectionsObaid Mianprogress
10/16/2025FinalObaid Mianprogress
10/16/2025Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical ComponentsObaid Mianspecial
10/16/2025Tenant Protection Plan ComplianceObaid Mianspecial
10/16/2025Fire-Resistant Penetrations and JointsObaid Mianspecial
10/16/2025Mechanical SystemsObaid Mianspecial
10/16/2025HVAC-R and service water heating equipmentObaid Mianenergy_progress
Latest 25 of 102.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Planet FitnessFitness / Recreation—
Project B01366088 Alteration · LOC Issued · 03/06/2026
CVS PharmacyRetail—
Project B01260324 Alteration · LOC Issued · 08/05/2025
Project B01260325 Alteration · LOC Issued · 08/05/2025
Project B01260326 Alteration · LOC Issued · 08/05/2025
Wels FargOfficeFloor 1
Project B01171611 Alteration · LOC Issued · 03/06/2025
CVSRetailCellar, Floors 1, 2
Project B01129893 Alteration · LOC Issued · 10/31/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 410 on file (BIS + DOB NOW)
▸Plans & Drawings47
▸DOB NOWPlans/Sketch47
09/01/2026B00553973-I1Request digital key ↗
08/31/2026B00573974-I1Request digital key ↗
08/27/2026B00850247-I1Request digital key ↗
Showing 3 of 47 on file for this type
▸Applications & Permits55
▸BISPLAN / WORK APPROVAL APPLICATION44
02/03/2026321191394Open ↗
01/30/2026321191394Open ↗
05/28/2025321191394Open ↗
Showing 3 of 44 on file for this type
▸BISWORK PERMIT APPLICATION10
05/28/2025321191394Open ↗
05/28/2025321191394Open ↗
05/12/2025321191394Open ↗
Showing 3 of 10 on file for this type
▸BISTEMPORARY FENCE APPLICATION & PERMIT1
03/30/2022321191394Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
02/28/2018321191394Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
02/28/2018321191394Open ↗
▸BISZONING DIAGRAM1
07/20/2018321191394Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
02/28/2018321191394Open ↗
▸Seals & Professional Certifications142
▸DOB NOWProgress Inspector Seal & Signature64
09/23/2026B01000191-S1Open ↗
09/23/2026B01000191-I1Open ↗
09/01/2026B01129893-P3Open ↗
Showing 3 of 64 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature48
09/01/2026B00553973-I1Open ↗
08/31/2026B00573974-I1Open ↗
08/27/2026B00850247-I1Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature28
09/23/2026B01243106-I1Open ↗
09/23/2026B01000191-S1Open ↗
09/23/2026B01000191-I1Open ↗
Showing 3 of 28 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING7
04/24/2025321191394Open ↗
04/14/2025321191394Open ↗
04/07/2025321191394Open ↗
Showing 3 of 7 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
05/02/2025321191394Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
05/02/2025321191394Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
06/16/2025321191394Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST3
07/31/2018321191394Open ↗
07/20/2018321191394Open ↗
Showing 2 of 3 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
03/30/2022321191394Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
05/16/2022321191394Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
08/26/2024321191394Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
03/30/2022321191394Open ↗
03/30/2022321191394Open ↗
07/31/2018321191394Open ↗
Showing 3 of 6 on file for this type
▸BISAIR SEALING AND INSULATION - VISUAL1
05/02/2025321191394Open ↗
▸BISINTERIOR LIGHTING POWER1
05/01/2025321191394Open ↗
▸BIS* DUCT LEAKAGE TESTING1
05/02/2025321191394Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
05/01/2025321191394Open ↗
▸BISFENESTRATION AREAS1
05/01/2025321191394Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
05/01/2025321191394Open ↗
▸BISLIGHTING IN DWELLING UNITS1
05/01/2025321191394Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/08/2025321191394Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/15/2025321191394Open ↗
▸BISLIGHTING CONTROLS1
05/01/2025321191394Open ↗
▸BIS* HVAC INSULATION AND SEALING1
05/01/2025321191394Open ↗
▸BISELECTRIC MOTORS1
05/01/2025321191394Open ↗
▸Inspections & Test Reports39
▸BISTECHNICAL REPORT: RESPONSIBILITY23
04/24/2025321191394Open ↗
04/24/2025321191394Open ↗
04/24/2025321191394Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
03/19/2024321191394Open ↗
06/02/2022321191394Open ↗
06/01/2022321191394Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
06/17/2025321191394Open ↗
03/31/2022321191394Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS2
05/12/2025321191394Open ↗
05/12/2025321191394Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
05/19/2025321191394Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
05/19/2025321191394Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
03/09/2023321191394Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/08/2025321191394Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
08/27/2024321191394Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
08/27/2024321191394Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
08/27/2024321191394Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
08/27/2024321191394Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
07/31/2018321191394Open ↗
▸Approvals, Objections & Sign-offs21
▸BISSCHEDULE A - OCCUPANCY / USE14
02/03/2026321191394Open ↗
05/24/2023321191394Open ↗
03/16/2023321191394Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
05/20/2025321191394Open ↗
05/14/2024321191394Open ↗
05/08/2024321191394Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership9
▸BISPROJECT-SPECIFIC GL INSURANCE4
05/14/2024321191394Open ↗
10/13/2022321191394Open ↗
06/11/2022321191394Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT3
01/08/2018340568335Open ↗
Showing 1 of 3 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
05/12/2025321191394Open ↗
05/14/2024321191394Open ↗
▸Filing & Intake Forms26
▸BISADDITIONAL INFORMATION19
06/06/2025321191394Open ↗
06/06/2025321191394Open ↗
05/09/2025321191394Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING COVER SHEET5
01/25/2018321191394Open ↗
Showing 1 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents17
▸BISBPP - SUPPORTING DOCUMENTATION8
03/04/2024340568317Open ↗
03/04/2024340568317Open ↗
11/13/2023340568317Open ↗
Showing 3 of 8 on file for this type
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION2
10/02/2024321191394Open ↗
10/02/2024321191394Open ↗
▸BISSHUTOFF DAMPERS1
05/02/2025321191394Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
05/12/2025321191394Open ↗
▸BISVESTIBULES1
05/01/2025321191394Open ↗
▸BISMAINTENANCE INFORMATION1
05/01/2025321191394Open ↗
▸BISPERMANENT CERTIFICATE1
05/02/2025321191394Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
05/02/2025321191394Open ↗
▸BISPLOT DIAGRAM1
02/28/2018321191394Open ↗