| Owner | Filings | Most Recent |
|---|---|---|
| VIK XS SERVICES | 1 | 07/08/2026 |
| TURNER CONSTRUCTION | 4 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| ME ENGINEERS | 11 | 08/25/2026 |
| HOK | 13 | 08/13/2026 |
| LAWRENCE K. SHAPIRO & ASSOCIATES | 6 | 07/10/2026 |
| TOHFAZ UDDIN PE PC | 2 | 07/07/2026 |
| ANDREW NEWMAN | 2 | 07/02/2026 |
| LOMBARDO PROFESSIONAL ENGINEERING | 1 | 06/22/2026 |
| PAUL PERDEK, PROF. ENG. PLLC | 1 | 06/11/2026 |
| HC PEC | 9 | 05/23/2026 |
| OSPINO ENGINEERING PLLC | 1 | 05/22/2026 |
| MURDOCH ENGINEERING | 4 | 04/22/2026 |
| BSEG | 2 | 04/01/2026 |
| MAYRICH CONSTRUCTION | 3 | 01/21/2026 |
| JAMES CHRISTERSON ARCHITECT | 3 | 11/06/2025 |
| PURE POWER ENGINEERING, INC. | 1 | 11/06/2025 |
| RAEL AUTOMATIC SPRINKLER CO., INC. | 1 | 04/01/2025 |
| PLAN B ENGINEERING | 1 | 03/25/2025 |
| LANGAN ENGINEERING | 3 | 03/20/2025 |
| MATTHEW BREIDENTHAL | 3 | 01/08/2025 |
| SEAN KENNEDY | 1 | 12/10/2024 |
| MUESER RUTLEDGE CONSULTING ENGINEER | 5 | 11/06/2024 |
| Representative | Filings | Most Recent |
|---|---|---|
| A1 EXPEDITING SERVICE CORP. | 70 | 03/21/2026 |
| LAWRENCE K SHAPIRO ASSOCIATES | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| TURNER CONSTRUCTION COMPANY | General Contractor | 24 | 08/20/2026 |
| PJP INSTALLERS INC | General Contractor | 11 | 07/08/2026 |
| RAEL AUTOMATIC SPR.CO INC | Fire Protection | 4 | 07/08/2026 |
| ULTIMATE SIGNS DESIGNS | Scaffold | 4 | 08/26/2026 |
| MACCARONE PLUMBING INC | Plumbing | 3 | 07/08/2026 |
| A.S.R. ELEC'L CONTR'G INC | Electrical | 2 | 03/22/2026 |
| W & W GLASS LLC | General Contractor | 2 | 07/08/2026 |
| ALMAR PLUMBING & HTG CORP | Plumbing | 2 | 07/08/2026 |
| MPC PLUMBING & HEATING INC | Plumbing | 2 | 07/08/2026 |
| RUTTURA & SONS CONSTRUCTI | General Contractor | 1 | 04/11/2026 |
| SAFWAY ATLANTIC, LLC | General Contractor | 1 | 04/10/2026 |
| NEW YORK BOOM TRUCKS | General Contractor | 1 | 07/14/2026 |
| VIK XS SERVICES INC | General Contractor | 1 | 07/08/2026 |
| WESTCHESTER METAL WORKS I | General Contractor | 1 | 06/28/2026 |
| KING HOIST & SCAFFOLDING | General Contractor | 1 | 07/08/2026 |
| A.M.A. HOLDINGS INC | General Contractor | 1 | 07/08/2026 |
| CHAMP PLUMBING & HTG CORP | Plumbing | 1 | 07/28/2026 |
| P.J. MECHANICAL CORP | General Contractor | 1 | 04/09/2026 |
| NEW YORK CONCRETE CORP | General Contractor | 1 | 04/09/2026 |
| RAD & D'APRILE INC | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| TWIN PEAKS INC. | 317 | 16 | 08/25/2026 |
| LANGAN ENG, ENV, SURVEYIN | 1265 | 5 | 02/27/2026 |
| ATWELL LLC | 8666 | 8 | 03/25/2025 |
| LERA CONSULTING STRUCTURA | 241 | 1 | 01/08/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Support of Excavation | Permit Issued | TURNER CONSTRUCTION COMPANY | 08/18/2026 |
| DOB NOW | Structural | Permit Issued | TURNER CONSTRUCTION COMPANY | 08/18/2026 |
| DOB NOW | Boiler Equipment | Permit Issued | CHAMP PLUMBING & HTG CORP | 07/27/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | NEW YORK BOOM TRUCKS INC | 07/13/2026 |
| DOB NOW | Standpipe | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 07/06/2026 |
| DOB NOW | Earth Work | Permit Issued | TURNER CONSTRUCTION COMPANY | 06/25/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | WESTCHESTER METAL WORKS I | 06/22/2026 |
| DOB NOW | Supported Scaffold | Signed-off | RAD & D'APRILE INC | 06/12/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | KING HOIST & SCAFFOLDING | 06/12/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | A.M.A. HOLDINGS INC | 06/11/2026 |
| DOB NOW | Boiler Equipment | Permit Issued | CHAMPION COMBUSTION CORP | 06/02/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | VIK XS SERVICES INC | 05/26/2026 |
| DOB NOW | Sign | Permit Issued | ULTIMATE SIGNS&DESIGNS CO | 05/22/2026 |
| DOB NOW | Sign | Permit Issued | AMBASSADOR CONSTRUCTION C | 05/22/2026 |
| DOB NOW | Earth Work | Permit Issued | TURNER CONSTRUCTION COMPANY | 05/19/2026 |
| DOB NOW | Plumbing | Permit Issued | MACCARONE PLUMBING INC | 05/15/2026 |
| DOB NOW | Sign | Permit Issued | ULTIMATE SIGNS&DESIGNS CO | 05/15/2026 |
| DOB NOW | Support of Excavation | Permit Issued | TURNER CONSTRUCTION COMPANY | 05/14/2026 |
| DOB NOW | Sign | Permit Issued | ULTIMATE SIGNS&DESIGNS CO | 05/12/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | W & W GLASS LLC | 04/23/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | SAFWAY ATLANTIC, LLC | 04/08/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | DIVINE SHABAZZ | 04/01/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | W W GLASS | 03/10/2026 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | PJP INSTALLERS INC | 03/09/2026 |
| DOB NOW | Construction Fence | Permit Issued | PJP INSTALLERS INC | 02/17/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | PJP INSTALLERS INC | 02/17/2026 |
| DOB NOW | Structural | Permit Issued | TURNER CONSTRUCTION COMPANY | 02/12/2026 |
| DOB NOW | Plumbing | Permit Issued | ALMAR PLUMBING & HTG CORP | 01/26/2026 |
| DOB NOW | Supported Scaffold | Signed-off | PJP INSTALLERS INC | 12/22/2025 |
| DOB NOW | General Construction | Permit Issued | TURNER CONSTRUCTION COMPANY | 10/21/2025 |
| DOB NOW | General Construction | Permit Issued | TURNER CONSTRUCTION COMPANY | 10/21/2025 |
| DOB NOW | Standpipe | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 10/07/2025 |
| DOB NOW | Sprinklers | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 10/07/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | PJP INSTALLERS INC | 08/20/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | PJP INSTALLERS INC | 08/20/2025 |
| DOB NOW | General Construction | Permit Issued | TURNER CONSTRUCTION COMPANY | 08/18/2025 |
| DOB NOW | General Construction | Permit Issued | TURNER CONSTRUCTION COMPANY | 08/15/2025 |
| DOB NOW | Structural | Permit Issued | TURNER CONSTRUCTION COMPANY | 07/28/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | PJ MECHANICAL | 07/16/2025 |
| DOB NOW | Plumbing | Permit Issued | ALMAR PLUMBING & HTG CORP | 06/06/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/25/2026 | Permit Issued | TURNER CONSTRUCTION COMPA | Heating and Air Conditioning Systems | Other Airtech 3BA1630 (7AT06) 252 CFM ×6 3BA1800 (7AT06) 326 CFM ×3 3BA1400 (7AT06) 78 CFM ×2 3BA1600 (7AT06) 190 CFM ×1 3BA7210 (7AT06) 19 CFM ×1 Heat / Cool Aaon RNA-060-D-A-3-EJB0B-A06NB 818,900 BTU · Rooftop Unit ×8 RNA-050-D-A-3-CJB0B-A04NB 545,900 BTU · Rooftop Unit ×4 RN-015-3-0-K80E-14A 135,600 BTU · Rooftop Unit ×2 RN-020-C-A-3-CJB0C-A03NB 204,700 BTU · Doas ×2 RNA-030-C-A-3-CJB0A-A06NE 409,500 BTU · Rooftop Unit ×2 RNA-030-C-A-3-CJB0A-A06NG 409,500 BTU · Rooftop Unit ×2 RNA-060-D-A-3-EJB0B-A06ND 808,900 BTU · Doas ×2 __Junk__ RNA-060-D-A-3-EJB0B-A05NC 682,400 BTU · Rooftop Unit ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/01/2025 | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 44 outlets |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | Permit Issued | CHAMP PLUMBING & HTG CORP | Storm, Water/Sanitary |
| 01/21/2026 | Permit Issued | MACCARONE PLUMBING INC | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/03/2026 | Permit Issued | TF ELECTRICAL CORP | General Wiring |
| 06/17/2026 | Permit Issued | RAINBOW ELECTRIC CO., INC | — |
| 06/17/2026 | Permit Issued | RAINBOW ELECTRIC CO., INC | — |
| 06/03/2026 | Permit Issued | KLEINKNECHT ELEC. CO.,INC | General Wiring |
| 04/15/2026 | Permit Issued | TF ELECTRICAL CORP | General Wiring |
| 08/22/2025 | Permit Issued | A.S.R. ELEC'L CONTR'G INC | General Wiring, Lighting |
| 04/22/2025 | Permit Issued | TF ELECTRICAL CORP | General Wiring |
| 03/03/2025 | Permit Issued | A.S.R. ELEC'L CONTR'G INC | General Wiring, Lighting |
| 02/27/2025 | Permit Issued | LIT MODE ELECL CONTG INC | — |
| 01/27/2025 | Permit Issued | KLEINKNECHT ELEC. CO.,INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/21/2026 | Permit Issued | TURNER CONSTRUCTION COMPA | 4 scope_items |
| 03/25/2025 | Permit Issued | TURNER CONSTRUCTION COMPA | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | Permit Issued | TURNER CONSTRUCTION COMPA | 3,964 panels, 4,100.2 kw, 60,000 roof_area_sqft |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/07/2026 | Permit Issued | KING HOIST & SCAFFOLDING | Scaffold |
| 06/11/2026 | Signed-off | RAD & D'APRILE INC | Scaffold |
| 05/23/2026 | Permit Issued | PJP INSTALLERS INC | Fence |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/10/2026 | Permit Issued | A.M.A. HOLDINGS INC | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/04/2026 | Pass-Final Boiler Equipment Inspection | Pass | View ↗ |
| 09/04/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/07/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/17/2026 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 07/09/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/08/2026 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 06/25/2026 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 06/12/2026 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 06/12/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/12/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 05/26/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/03/2026 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 01/30/2026 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 01/30/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/01/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/30/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 10/30/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/14/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/29/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/18/2025 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 09/16/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 08/28/2025 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 05/08/2025 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 05/02/2025 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 05/02/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/20/2026 | Insulation placement and R values | MAXIM KORNGOLD | energy_progress |
| 08/20/2026 | Air barrier continuity plan testing | MAXIM KORNGOLD | energy_progress |
| 08/20/2026 | Air barrier - visual inspection | MAXIM KORNGOLD | energy_progress |
| 08/20/2026 | Protection of exposed foundation insulation | MAXIM KORNGOLD | energy_progress |
| 08/20/2026 | Fenestration areas | MAXIM KORNGOLD | energy_progress |
| 08/20/2026 | Maintenance information | MAXIM KORNGOLD | energy_progress |
| 08/20/2026 | Fenestration air leakage | MAXIM KORNGOLD | energy_progress |
| 08/20/2026 | Vestibules | MAXIM KORNGOLD | energy_progress |
| 08/20/2026 | Sprayed fire-resistant materials | MAXIM KORNGOLD | special |
| 08/20/2026 | Fire-Resistant Penetrations and Joints | MAXIM KORNGOLD | special |
| 08/20/2026 | Seismic Isolation Systems | MAXIM KORNGOLD | special |
| 08/20/2026 | Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable) | MAXIM KORNGOLD | special |
| 08/20/2026 | Construction Operations Influencing Adjacent Structures | MAXIM KORNGOLD | special |
| 08/20/2026 | Wall Panels, Curtain Walls, and Veneers | MAXIM KORNGOLD | special |
| 08/20/2026 | Mastic and Intumescent Fire-resistant Coatings | MAXIM KORNGOLD | special |
| 08/20/2026 | Exterior Insulation and Finish Systems (EIFS) | MAXIM KORNGOLD | special |
| 08/20/2026 | Concrete - Precast | MAXIM KORNGOLD | special |
| 08/20/2026 | Energy Code Compliance Inspections | MAXIM KORNGOLD | progress |
| 08/20/2026 | Fire-Resistance Rated Construction | MAXIM KORNGOLD | progress |
| 08/20/2026 | Preliminary | MAXIM KORNGOLD | progress |
| 08/20/2026 | Lowest Floor Elevation | MAXIM KORNGOLD | progress |
| 08/20/2026 | Fenestration and door U-factor and product ratings | MAXIM KORNGOLD | energy_progress |
| 08/20/2026 | Air barrier — testing | MAXIM KORNGOLD | energy_progress |
| 08/14/2026 | HVAC-R and service water heating equipment | Maxim Korngold | energy_progress |
| 08/14/2026 | HVAC-R and service water heating system controls | Maxim Korngold | energy_progress |