← Back
BuildNYC
Five to six families
Crown Heights Residents for Adults
126 ALBANY AVENUE · BIN 3030211
💬 Discuss this project
1931Year Built
4Stories
C2Building Class
R6Zoning
10,137 sfGross Floor Area
6Units
Rent Stabilized1 Active Violation ▸FDNY Report ↗
Five to six families · 3,322 sf lot · 3.05 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBoiler room work1p · 2 filings · 20 docs
Floor 4Boiler room work7p · 2 filings · 20 docs
Floor 3Boiler room work7p · 2 filings · 20 docs
Floor 2Unit 2A, Unit 2B7p · 2 filings · 20 docs
Floor 1Unit 1A6p · 2 filings · 20 docs
CellarBoiler room work5p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Local Development Corp of Crown He1507/08/2026
LDCCH310/04/2026
Crown Heights Residence for Adults HDFC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rosenthal303/30/2026
Eskw/A103/30/2026
Cricket Architects NJ406/05/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Nagan EX Consultants803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.R.L. Plumbing & HeatingPlumbing207/08/2026
Triple Crown ElectricElectrical103/22/2026
Watts Up Electric NYElectrical103/22/2026
Building Lifecycle
10/29/2026
Objection raised — Other
10/29/2026
Objection raised — Cost
10/29/2026
Objection raised — Inspections
09/28/2026
Objection resolved — Resolved
09/25/2026
Objection raised — Other
246 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offA.R.L. Plumbing & Heating02/04/2025
DOB NOWGeneral ConstructionSigned-offLocal Development Corp of Crown He01/30/2025
DOB NOWPlumbingSigned-offA.R.L. Plumbing & Heating06/05/2024
DOB NOWGeneral ConstructionPermit IssuedLocal Development Corp of Crown He10/20/2023
1 project · most recent 03/30/2026
Air Conditioning Systems
FiledStatusContractorScope
03/30/2026——Air Conditioning Systems
1 project · most recent 06/05/2024
Water/Sanitary
FiledStatusContractorScope
06/05/2024Signed-offA.R.L. Plumbing & HeatingWater/Sanitary
6 projects · most recent 03/05/2026
General Wiring Boiler Controls
FiledStatusContractorScope
03/05/2026CompleteWatts Up Electric NYGeneral Wiring
03/05/2026CancelledWatts Up Electric NYGeneral Wiring
03/05/2026CancelledWatts Up Electric NYGeneral Wiring
01/22/2026CompleteWatts Up Electric NYBoiler Controls
03/10/2025CompleteTriple Crown ElectricGeneral Wiring
02/07/2024CompleteTriple Crown ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/07/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/15/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/15/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/15/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/01/2023Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
03/30/2026HVAC-R and service water heating equipment—energy_progress
03/30/2026HVAC-R and service water piping design and insulation—energy_progress
03/30/2026HVAC-R and service water heating system controls—energy_progress
03/27/2026HVAC-R and service water piping design and insulation—energy_progress
03/27/2026HVAC-R and service water heating system controls—energy_progress
03/27/2026HVAC-R and service water heating equipment—energy_progress
03/26/2026Tenant Protection Plan Compliance—special
03/25/2026Fire-Resistant Penetrations and Joints—special
03/25/2026Tenant Protection Plan Compliance—special
03/24/2026Tenant Protection Plan Compliance—special
03/24/2026Fire-Resistant Penetrations and Joints—special
03/24/2026Energy Code Compliance Inspections—progress
03/24/2026Shutoff dampers—energy_progress
03/18/2026Fire-Resistant Penetrations and Joints—special
03/18/2026Structural Stability – Alterations of existing buildings—special
03/18/2026Masonry—special
03/18/2026Exterior lighting power—energy_progress
03/18/2026Lighting controls—energy_progress
03/18/2026Fenestration air leakage—energy_progress
03/18/2026Fenestration and door U-factor and product ratings—energy_progress
03/18/2026Air barrier - visual inspection—energy_progress
03/18/2026Tenant Protection Plan Compliance—special
03/16/2026Final—progress
03/13/2026Mechanical Systems—special
03/13/2026Final—progress
37 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account