DOB07/01/2005V-DOB VIOLATION - ACTIVE
DOB10/17/2004V-DOB VIOLATION - ACTIVE
DOB09/09/2004V-DOB VIOLATION - ACTIVE
DOB09/09/2003V-DOB VIOLATION - ACTIVE
ECB04/29/2009WORK W/O PERMIT. WORK NOTED: STAIR TO CELLAR INSTALLED. 3 FLR JOISTS CUT, STEPS FABRICATED & A PAIR OF HINGED DOORS COVER THE HATCH. RAILS PROVIDED @ FALL EXPOSURE @ 1ST FLR. NO RAILS ON STEPS. REMEDY: OBTAINNothing owed — awaiting certificate of correction
ECB09/29/2008FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER. UNENCLOSED STAIRWAYAT 1ST STY RIGHT REAR. REMEDY: MAINTAIN BLDG.Nothing owed — awaiting certificate of correction
ECB06/30/2005FAILURE TO MAINTAIN EXTERIOR BRICK WALLS. DEFECT: DUE TO EXTREME FIRE DAMAGE EXTERIOR STRUCTURAL SUPPORT WALLS ARE IN DANGER OF COLLAPSING ON TO PEDESTRIAN SIDEWALK. LOCATION:ENTIRE BLDG. REMEDY:MAKE SITE SAFENothing owed — awaiting certificate of correction
ECB07/30/2002FAILURE TO MAINTAIN EXTERIOR BUILDING WALLO DEFECTS SOUTH WALL BRICK IS CRACKED SPALLING AND BULDGING SOUTH EAST CORNER IS MISSING BRICK LOCATION REAR OF PROPERTIE REMEDY MAKE ALL NECESSARY REPAIRS OBTAIN PROPENothing owed — awaiting certificate of correction
ECB05/22/2002FAILURE TO MAINTAIN EXTERIOR BUIDLING WALL. DEFECTS ARE: SHOUTH WALL BRICK WORK IS CRACKED SPALLING. SOUTH/EAST CORENER IS CRACKED AND SEPARRATING ALL DEFECTS ARE AT REAR WALL. REMEDY: OBTAIN PERMIT FOR REPAIRNothing owed — awaiting certificate of correction
ECB04/03/2002FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. DEFECTS ARE: SOUTH WALL. BRICK WORK IS CRACKED- SPALLING. SOUTH/EAST CORNER IS CRACKED AND SPARATING. SOUTH WALL IS MISSING TWO TERRA COTTA COPING. REMEDY: OBTAIN PERNothing owed — awaiting certificate of correction
ECB01/04/2000FAILURE TO MAINTAIN THE STRUCTURAL CONDITION OF THE 1ST FLOOR SUPPORT SYSTEM: -BEAMS ARE BADLY WATER DAMAGED AND DETERIORATED. -COLUMNS ARE OUT OF PLUMB. REMEDY: IMMEDIATELY VACATE THE LAUNDROMAT SUBMIT AN EN-Nothing owed — awaiting certificate of correction
ECB12/14/1999PLUMBING WORK DOES NOT CONFORM TO APPROVED PLANS FOUND THERE ARE NO SPRINKLERS BEHIND WALLS ABOVE GAS DRYERS AND PIPING NOT DONE ACCORDING TO PLANS. REMEDY: CONFORM TO APPROVED PLANSNothing owed — awaiting certificate of correction
ECB10/31/1997PLUMBING WORK DOES NOT CONFORM TO APPROVED PLANS. IN THAT THERE ARE NO SPRINKLERS BEHING WALLS ABOVE DRYERS & PIPING NOT DONE ACCORDING TO PLANS. REMEDY: CONFORM TO APPROVED PLANS THIS REPLACE 34149401HNothing owed — awaiting certificate of correction
ECB09/11/1997FAILURE TO MAINTAIN THE FIRST FLOOR SUPPORT SYSTEM: BEAMS SAG AND 90% OF THE CONCRETE COLUMNS HAVE DEFLECTED APPROXIMATELY 8 INCHES. ALSO, BEAMS ARE WATER DAMAGED. THIS HAS CAUSED THE FLOOR TO SAG APPROX 6-8INNothing owed — awaiting certificate of correction