← Back
BuildNYC
Walk-up apt, over six families with stores
126 MAC DOUGAL STREET
MANHATTAN · Greenwich Village · BIN 1008699
💬 Discuss this project
1894Year Built
5Stories
C7Building Class
R7-2Zoning
12,150 sfGross Floor Area
22Units
Rent Stabilized4 Active Violations 3 unresolved · 1 paperwork only 2 old, status unconfirmed ▸
Walk-up apt, over six families with stores · Owner of record: Six Mon · 2,500 sf lot · 4.86 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 13 filings
Basement1 filing
Sub-Basement2 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Six Mon1203/22/2026
126 Mac Dougal Holding203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ashraf102/09/2024
Enthink Engineers207/12/2021
Alberto Roman307/23/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Tasheed Building Consultants103/21/2026
JD Design Associates603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Reliable EnterprisesScaffold407/08/2026
Watson's Plumbing, Heating, & BuildingPlumbing207/08/2026
Golden Gate Bapaz Construction IGeneral Contractor103/21/2026
Yilin ConstructionGeneral Contractor103/21/2026
C James Plumbing & HeatingPlumbing103/21/2026
Effective PlumbingPlumbing103/21/2026
Jem Electrical ContractingElectrical103/22/2026
All City Plumbing & Heating ContractingPlumbing109/25/1991
Approved EnergyPlumbing205/02/2012
Boris MalikGeneral Contractor106/09/2017
Crown RemodelingGeneral Contractor112/29/2011
Tomkat Plumbing & HeatingPlumbing111/09/2011
Topmost Design & ConstructionGeneral Contractor107/30/2013
Unique Fire SystemsFire Protection107/09/2015
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jay Kavi8500102/09/2024
AR-Tech Engineering6659103/10/2020
Building Lifecycle
09/02/2026
Boiler inspection report filed
Initial · no defects · Accepted
03/01/2026
§ 27-2010, 2011, 2012 ADM code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the north yard
HPD violation · open
03/01/2026
§ 27-2021 ADM code provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and…
HPD violation · open
12/12/2025
Boiler inspection report filed
Initial · no defects · Accepted
06/04/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
105 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Reliable Enterprises—
DOB NOW—Reliable Enterprises—
DOB NOW—Watson's Plumbing, Heating, & Building—
DOB NOW—Watson's Plumbing, Heating, & Building—
BIS—Yilin Construction—
BIS—Boris Malik—
BIS—Unique Fire Systems—
BIS—Topmost Design & Construction—
BIS—Golden Gate Bapaz Construction—
BIS—Bell Fuel Oil—
BIS—Bell Fuel Oil—
BIS—Golden Gate Bapaz Construction—
BIS—C James Plumbing & Heating—
BIS—Crown Remodeling—
BIS—Premier Pipe Solutions—
BIS—Effective Plumbing—
BIS—Premier Pipe Solutions—
BIS—Jack Piccini—
BIS—126 Macdougal St—
BIS—New Cntury Construction—
BIS—All City Plumbing & Heating Contracting—
Nothing on file for this building.
Nothing on file for this building.
248 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account