← Back
Primarily 2 family with 1 store or office
126 SMITH STREET
BROOKLYN · BIN 3001047
💬 Discuss this project
1920Year Built
3Stories
S2Building Class
R6AZoning
3,133 sfGross Floor Area
3Units
0 Open Violations
Primarily 2 family with 1 store or office · 1,467 sf lot · 2.14 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Cellar6p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JPKJ REALTY2207/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HARDIE & ASSOCIATES CONSULTING ENG.910/23/2023
J&R DESIGN AND INSPECTION CORP.202/01/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DY EXPEDITING1803/21/2026
HIGH QUALITY 338403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HIGH QUALITY CONSTRUCTIONGeneral Contractor507/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HARDIE & ASSOCIATES, CONS3760310/23/2023
J&R DESIGN AND INSPECTION6637202/01/2023
Building Lifecycle
All (38)Filed (11)Permit Issued (5)Signed Off (5)Violation (4)Inspection (3)Special Inspection (10)
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/07/2023
Signed off — Alteration
APPLICATION FILE TO REMOVE ONE VIOLATION OF 39065734J @ CELLAR FLOOR OF AN EXIST 3RD STORY MIXED USE BUILDING. WORK INVOLVES REGISTERING GAS BOILER AND PERFORM GAS TEST. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B07999385-I1
12/07/2023
Signed off — Alteration
APPLICATION FILE TO REMOVE ONE VIOLATION OF 39065734J @ CELLAR FLOOR OF AN EXIST 3RD STORY MIXED USE BUILDING. WORK INVOLVES INSTALLING NEW PARTITION AND INTERIOR DOOR AT CELLAR FLOOR. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B07999384-I1
12/07/2023
Signed off — Alteration
APPLICATION FILE TO REMOVE ONE VIOLATION OF 39065734J @ CELLAR FLOOR OF AN EXIST 3RD STORY MIXED USE BUILDING. WORK INVOLVE INSTALLING A NEW BOILER AND REGISTER GAS BOILER AT CELLAR FLOOR. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B08002234-I1
12/06/2023
Signed off — Alteration
B00821670-I1
11/13/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/03/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/27/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/23/2023
Filed — Alteration
APPLICATION FILE TO REMOVE ONE VIOLATION OF 39065734J @ CELLAR FLOOR OF AN EXIST 3RD STORY MIXED USE BUILDING. WORK INVOLVE INSTALLING A NEW BOILER AND REGISTER GAS BOILER AT CELLAR FLOOR. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B08002234-P2
10/23/2023
Filed — Alteration
APPLICATION FILE TO REMOVE ONE VIOLATION OF 39065734J @ CELLAR FLOOR OF AN EXIST 3RD STORY MIXED USE BUILDING. WORK INVOLVES INSTALLING NEW PARTITION AND INTERIOR DOOR AT CELLAR FLOOR. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B07999384-P2
10/23/2023
Filed — Alteration
APPLICATION FILE TO REMOVE ONE VIOLATION OF 39065734J @ CELLAR FLOOR OF AN EXIST 3RD STORY MIXED USE BUILDING. WORK INVOLVES REGISTERING GAS BOILER AND PERFORM GAS TEST. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B07999385-P2
10/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELLIOTT HARDIE
10/23/2023
Special inspection requirement — Energy Code Compliance Inspections
ELLIOTT HARDIE
10/23/2023
Special inspection requirement — Final
ELLIOTT HARDIE
09/07/2023
Filed — Alteration
APPLICATION FILE TO REMOVE ONE VIOLATION OF 39065734J @ CELLAR FLOOR OF AN EXIST 3RD STORY MIXED USE BUILDING. WORK INVOLVES REGISTERING GAS BOILER AND PERFORM GAS TEST. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B07999385-P1
09/07/2023
Filed — Alteration
APPLICATION FILE TO REMOVE ONE VIOLATION OF 39065734J @ CELLAR FLOOR OF AN EXIST 3RD STORY MIXED USE BUILDING. WORK INVOLVE INSTALLING A NEW BOILER AND REGISTER GAS BOILER AT CELLAR FLOOR. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B08002234-P1
09/07/2023
Filed — Alteration
APPLICATION FILE TO REMOVE ONE VIOLATION OF 39065734J @ CELLAR FLOOR OF AN EXIST 3RD STORY MIXED USE BUILDING. WORK INVOLVES INSTALLING NEW PARTITION AND INTERIOR DOOR AT CELLAR FLOOR. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B07999384-P1
07/13/2023
Signed off — Alteration
INTERIOR RENOVATION ON 2ND FLOOR OF AN EXISTING MIXED USE BUILDING. REPAIR/NEW PARTITION, DOOR, CEILING, FLOOR, PAINTING WORK AS PER PLAN.NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00814121-I1
07/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELLIOTT HARDIE
07/05/2023
Special inspection requirement — Energy Code Compliance Inspections
ELLIOTT HARDIE
07/05/2023
Special inspection requirement — Final
ELLIOTT HARDIE
02/16/2023
Permit issued — Plumbing
B07999385-I1-PL
02/16/2023
Permit issued — Boiler Equipment
B08002234-I1-BE
02/15/2023
Permit issued — General Construction
B07999384-I1-GC
02/09/2023
Permit issued — General Construction
B00821670-I1-GC
02/01/2023
Filed — Alteration
B00821670-I1
01/27/2023
Permit issued — General Construction
B00814121-I1-GC
01/24/2023
Filed — Alteration
INTERIOR RENOVATION ON 2ND FLOOR OF AN EXISTING MIXED USE BUILDING. REPAIR/NEW PARTITION, DOOR, CEILING, FLOOR, PAINTING WORK AS PER PLAN.NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B00814121-I1
01/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
01/18/2023
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
01/18/2023
Special inspection requirement — Fire-Resistance Rated Construction
Robert Truskosky
01/17/2023
Special inspection requirement — Final
Robert Truskosky
10/05/2022
Filed — Alteration
APPLICATION FILE TO REMOVE ONE VIOLATION OF 39065734J @ CELLAR FLOOR OF AN EXIST 3RD STORY MIXED USE BUILDING. WORK INVOLVES REGISTERING GAS BOILER AND PERFORM GAS TEST. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B07999385-I1
10/05/2022
Filed — Alteration
APPLICATION FILE TO REMOVE ONE VIOLATION OF 39065734J @ CELLAR FLOOR OF AN EXIST 3RD STORY MIXED USE BUILDING. WORK INVOLVES INSTALLING NEW PARTITION AND INTERIOR DOOR AT CELLAR FLOOR. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B07999384-I1
10/05/2022
Filed — Alteration
APPLICATION FILE TO REMOVE ONE VIOLATION OF 39065734J @ CELLAR FLOOR OF AN EXIST 3RD STORY MIXED USE BUILDING. WORK INVOLVE INSTALLING A NEW BOILER AND REGISTER GAS BOILER AT CELLAR FLOOR. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B08002234-I1
07/13/2022
Violation issued (ECB, closed)
Boilers
04/17/2017
Violation issued (ECB, closed)
Construction
11/26/2003
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.02/16/2023
DOB NOWBoiler EquipmentSigned-offAMERICAN STANDARD P&H CORORP.02/16/2023
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION02/15/2023
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION02/09/2023
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION01/27/2023
BISFPISSUEDMEGA FIRE PROTECTION INC04/27/2017
BISMHISSUEDBRICK BY BRICK CONSTRUCTI12/07/2016
BISFPISSUEDJEM FIRE PREVENTION INC02/25/2015
BISFPISSUEDIDEAL FIRE CONTROL INC03/15/2007
BISPLISSUEDLUVER PLBG & HTG INC01/18/2007
BISMHISSUEDBRS CONST12/07/2006
BISOTISSUEDKORMAN DESIGN & BUILD08/24/2006
BISFPISSUEDMEGA FIRE PROTECTION INC01/16/2003
2 projects · most recent 07/03/2019
General Wiring
FiledStatusContractorScope
07/03/2019Permit IssuedP.L. ELEC'L CONTR'G CORPGeneral Wiring
04/27/2019Permit IssuedINTELOGIC ELECTRIC, INC.General Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/03/2023Pass-Final Boiler Equipment InspectionPassView ↗
10/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
10/23/2023Fire-Resistant Penetrations and JointsELLIOTT HARDIEspecial
10/23/2023Energy Code Compliance InspectionsELLIOTT HARDIEprogress
10/23/2023FinalELLIOTT HARDIEprogress
07/05/2023Fire-Resistant Penetrations and JointsELLIOTT HARDIEspecial
07/05/2023Energy Code Compliance InspectionsELLIOTT HARDIEprogress
07/05/2023FinalELLIOTT HARDIEprogress
01/18/2023Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
01/18/2023Energy Code Compliance InspectionsRobert Truskoskyprogress
01/18/2023Fire-Resistance Rated ConstructionRobert Truskoskyprogress
01/17/2023FinalRobert Truskoskyprogress
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/27/2026B00814121-I1Request digital key ↗
08/27/2026B00821670-I1Request digital key ↗
08/26/2026B08002234-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION4
02/15/2017340473311Open ↗
12/08/2016321490971Open ↗
12/08/2016321490971Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
02/15/2017340473311Open ↗
12/08/2016321490971Open ↗
03/16/2015321058172Open ↗
▸Seals & Professional Certifications30
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/27/2026B00814121-I1Open ↗
08/27/2026B00821670-I1Open ↗
08/26/2026B07999385-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/29/2026B07999384-P1Open ↗
08/29/2026B07999384-P1Open ↗
08/23/2026B07999384-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
02/15/2017340473311Open ↗
12/08/2016321490971Open ↗
03/16/2015321058172Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026B07999384-P1Open ↗
08/23/2026B07999384-I1Open ↗
08/23/2026B00814121-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
12/08/2016321490971Open ↗
03/16/2015321058172Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/11/2017340473311Open ↗
12/08/2016321490971Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
02/15/2017340473311Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/15/2017340473311Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
12/08/2016321490971Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/27/2026B00814121-I1Open ↗
08/26/2026B07999385-P2Open ↗
08/26/2026B07999385-P1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
02/15/2017340473311Open ↗
12/08/2016321490971Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/08/2016321490971Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/15/2017340473311Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/11/2017340473311Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
10/11/2017340473311Open ↗
02/15/2017340473311Open ↗
12/08/2016321490971Open ↗
Showing 3 of 4 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
04/25/2017340473311Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
12/08/2016321490971Open ↗
03/16/2015321058172Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/15/2017340473311Open ↗
▸BISBOROUGH INTAKE FORM1
10/11/2017340473311Open ↗