← Back
Walk-up apt, over six families with stores
126 WEST 25 STREET
MANHATTAN · BIN 1014988
💬 Discuss this project
1901Year Built
5Stories
C7Building Class
M1-8A/R11Zoning
10,470 sfGross Floor Area
9Units
Rent Stabilized0 Open Violations
Walk-up apt, over six families with stores · Owner of record: 124-26 W 25 STREET LLC · 2,469 sf lot · 4.24 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SABET DEVELOPMENT1807/08/2026
124-26 W 25 ST LLC403/22/2026
126 WEST 25 STREET103/22/2026
126 W 25 STREET603/21/2026
CHELSEA 24TH ST LLC C/O MAGNA HO103/21/2026
LAM GEN 25203/21/2026
NYC REALTY HOLDING303/21/2026
CHELSEA 24TH ST LLC C O MAGNA HO103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HUAN DESIGN INC.306/18/2025
GREGORY V. PEROTTO, P.E.209/27/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PEROTTO GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor303/21/2026
EAST COAST MECHNACIAL LLCPlumbing207/08/2026
PAWEL JACHIMOWICZElectrical103/21/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HUAN DESIGN INC7669306/18/2025
GREGORY V. PEROTTO, P.E.947209/27/2022
Building Lifecycle
All (80)Filed (5)Permit Issued (4)Signed Off (4)Violation (53)Inspection (5)Special Inspection (9)
08/05/2025
Signed off — Alteration
PLUMBING FIXTURE WITH ASSOCIATED PIPES FOR COFFEE STORE.
M01217523-I1
08/05/2025
Signed off — Alteration
PLUMBING FIXTURE WITH ASSOCIATED PIPES FOR COFFEE STORE.
M01217523-S2
07/25/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/18/2025
Filed — Alteration
PLUMBING FIXTURE WITH ASSOCIATED PIPES FOR COFFEE STORE.
M01217523-P1
06/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
ZHENHUAN XU
06/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
ZHENHUAN XU
05/13/2025
Permit issued — General Construction
M01217523-I1-GC
05/13/2025
Permit issued — Plumbing
M01217523-S2-PL
05/01/2025
Filed — Alteration
PLUMBING FIXTURE WITH ASSOCIATED PIPES FOR COFFEE STORE.
M01217523-I1
05/01/2025
Filed — Alteration
PLUMBING FIXTURE WITH ASSOCIATED PIPES FOR COFFEE STORE.
M01217523-S2
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/23/2023
Signed off — Alteration
RECONNECT REPLACEMENT BOILERS TO EXG. GAS LINES. REPLACEMENT BOILERS FILED UNDER SEPARATE BE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08008275-I1
03/23/2023
Signed off — Alteration
FILING TO REGISTER TWO (2) BOILERS. THIS APPLICATION SUPERSEDES LAA#140272087 WHICH SHOULD BE WITHDRAWN UPON SIGN OFF. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08008273-I1
03/15/2023
Violation issued (HPD, closed)
A
01/05/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/28/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/26/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/30/2022
Permit issued — Boiler Equipment
M08008273-I1-BE
09/30/2022
Permit issued — Plumbing
M08008275-I1-PL
09/27/2022
Filed — Alteration
RECONNECT REPLACEMENT BOILERS TO EXG. GAS LINES. REPLACEMENT BOILERS FILED UNDER SEPARATE BE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08008275-I1
09/27/2022
Filed — Alteration
FILING TO REGISTER TWO (2) BOILERS. THIS APPLICATION SUPERSEDES LAA#140272087 WHICH SHOULD BE WITHDRAWN UPON SIGN OFF. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08008273-I1
09/22/2022
Special inspection requirement — Heating Systems
Gregory Perotto
09/22/2022
Special inspection requirement — Maintenance information
Gregory Perotto
09/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
09/22/2022
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Perotto
09/22/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Gregory Perotto
09/22/2022
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Perotto
09/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
02/16/2022
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
A
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/23/2019
Violation issued (HPD, closed)
C
03/23/2019
Violation issued (HPD, closed)
B
03/23/2019
Violation issued (HPD, closed)
B
11/18/2018
Violation issued (HPD, closed)
A
11/18/2018
Violation issued (HPD, closed)
A
11/18/2018
Violation issued (HPD, closed)
A
11/18/2018
Violation issued (HPD, closed)
B
11/18/2018
Violation issued (HPD, closed)
A
11/18/2018
Violation issued (HPD, closed)
A
09/22/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/15/2017
Violation issued (ECB, closed)
Construction
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC05/13/2025
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.05/13/2025
DOB NOWBoiler EquipmentSigned-offEAST COAST MECHNACIAL LLC09/30/2022
DOB NOWPlumbingSigned-offEAST COAST MECHNACIAL LLC09/30/2022
BISOTISSUEDSABET DEVELOPMENT COMPANY04/09/2014
BISOTISSUEDSABET DEVELOPMENT COMPANY03/03/2014
BISOTISSUEDPARADISE CONSTRUCTION11/18/2005
BISEQISSUEDPARADISE CONSTRUCTION09/26/2005
BISEQISSUEDPARADISE CONSTRUCTION08/03/2005
2 projects · most recent 09/03/2025
General Wiring
FiledStatusContractorScope
09/03/2025CompleteELECL POWER LIGHT & MECHGeneral Wiring
01/24/2023CompleteDENNISON ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/25/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/05/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/26/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/18/2025Tenant Protection Plan ComplianceZHENHUAN XUspecial
06/09/2025Tenant Protection Plan ComplianceZHENHUAN XUspecial
09/22/2022Heating SystemsGregory Perottospecial
09/22/2022Maintenance informationGregory Perottoenergy_progress
09/22/2022Fire-Resistant Penetrations and JointsGregory Perottospecial
09/22/2022HVAC-R and service water heating system controlsGregory Perottoenergy_progress
09/22/2022HVAC-R and service water piping design and insulationGregory Perottoenergy_progress
09/22/2022HVAC-R and service water heating equipmentGregory Perottoenergy_progress
09/22/2022Fire-Resistant Penetrations and JointsGregory Perottospecial
▾Documents — 69 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026M08008273-I1Request digital key ↗
09/01/2026M08008275-I1Request digital key ↗
08/23/2026M01217523-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION8
08/16/2023140182807Open ↗
08/03/2023140182807Open ↗
08/02/2023140182807Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION2
04/07/2014140182807Open ↗
02/28/2014140168191Open ↗
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026M08008275-I1Open ↗
08/23/2026M01217523-S2Open ↗
08/23/2026M01217523-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026M08008273-I1Open ↗
09/23/2026M08008273-I1Open ↗
08/26/2026M01217523-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026M08008273-I1Open ↗
09/23/2026M08008273-I1Open ↗
09/23/2026M08008273-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
04/07/2014140182807Open ↗
02/28/2014140168191Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
04/07/2014140182807Open ↗
02/28/2014140168191Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
04/07/2014140182807Open ↗
02/28/2014140168191Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
12/17/2014140168191Open ↗
12/17/2014140168191Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
06/06/2023123918172Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
04/07/2014140182807Open ↗
02/28/2014140168191Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026M08008275-I1Open ↗
08/13/2026M08008273-I1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
04/07/2014140182807Open ↗
02/28/2014140168191Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/17/2014140168191Open ↗
12/17/2014140168191Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/17/2014140168191Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/07/2014140182807Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/07/2014140182807Open ↗
▸Approvals, Objections & Sign-offs3
▸BISSCHEDULE A - OCCUPANCY / USE2
06/06/2023123918172Open ↗
01/14/2015122245999Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/17/2014140168191Open ↗
▸Cost, Insurance & Ownership9
▸BISDEPT OF FINANCE VERIFICATION4
10/19/2015122245999Open ↗
10/19/2015122245999Open ↗
07/14/2015122245999Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT3
12/17/2014140168191Open ↗
12/17/2014140168191Open ↗
04/07/2014140182807Open ↗
▸BISHIC LICENSE OR AFFIDAVIT2
04/07/2014140182807Open ↗
02/28/2014140168191Open ↗
▸Filing & Intake Forms5
▸BISEFILING JOB APPLICATION COVER SHEET2
04/07/2014140182807Open ↗
02/28/2014140168191Open ↗
▸BISEFILING COVER SHEET2
06/06/2023123918172Open ↗
01/14/2015122245999Open ↗
▸BISBOROUGH INTAKE FORM1
06/06/2023123918172Open ↗
▸Other Documents3
▸BISPLOT DIAGRAM2
06/06/2023123918172Open ↗
01/14/2015122245999Open ↗
▸BISSupporting Document: Fee Exempt1
06/30/2015122245999Open ↗