1260 FTELEY AVENUE
BRONX · BIN 2025448
💬 Discuss this project
1926Year Built
2Stories
C2Building Class
R6Zoning
3,240 sfGross Floor Area
5Units
Rent Stabilized13 Active Violations ▸FDNY Report ↗
Five to six families · Owner of record: 1260 Fteley Ave · 2,500 sf lot · 1.3 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 21 filing · 13 docs
Floor 1Unit 1A1 filing · 13 docs
Cellar1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1260 Fteley Ave203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/20/2018$790K—ANAND BARI INC → 1260 FTELEY AVE LLC$244/sf building
08/05/2016$625K—Private party → ANAND BARI INC$193/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Shahrish Shuvo Engineering103/30/2026
Vasilios Artemiou PE103/18/2026
AG Engineering302/20/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Xpdite Group LLC (104)303/21/2026
Xpdite Group LLC 104203/21/2026
Xpdite Group LLC 105103/21/2026
Building Lifecycle
04/30/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
04/13/2026
Objection raised — Other
04/13/2026
Objection raised — Admin
04/10/2026
Objection resolved — Resolved
04/10/2026
Objection resolved — Addressed
206 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 03/30/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
03/30/2026——Heating and Air Conditioning Systems
1 project · most recent 03/30/2026
Sprinkler System
FiledStatusContractorScope
03/30/2026——Sprinkler System
1 project · most recent 03/30/2026
Storm Water/Sanitary
FiledStatusContractorScope
03/30/2026——Storm, Water/Sanitary
1 project · most recent 11/25/2025
General Wiring
FiledStatusContractorScope
11/25/2025Permit IssuedAG Power ElectricGeneral Wiring
1 project · most recent 03/30/2026
Steel Wood
FiledStatusContractorScope
03/30/2026——Steel, Wood
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
03/26/2026Structural Cold-Formed Steel—special
03/26/2026Structural Steel - Details—special
03/26/2026Wood – Prefabricated I-Joists—special
03/11/2026Post-installed Anchors—special
03/11/2026Fire-Resistant Penetrations and Joints—special
02/04/2026Structural Stability – Alterations of existing buildings—special
01/26/2026Fire-Resistant Penetrations and Joints—special
01/26/2026HVAC-R and service water heating equipment—energy_progress
01/26/2026Duct leakage testing, insulation and design—energy_progress
01/26/2026Fire-Resistant Penetrations and Joints—special
01/26/2026Energy Code Compliance Inspections—progress
01/26/2026Maintenance information—energy_progress
01/26/2026HVAC-R and service water heating equipment—energy_progress
01/26/2026HVAC-R and service water heating system controls—energy_progress
01/26/2026HVAC-R and service water piping design and insulation—energy_progress
01/26/2026HVAC-R and service water piping design and insulation—energy_progress
01/26/2026Energy Code Compliance Inspections—progress
01/26/2026Ventilation and air distribution system—energy_progress
01/26/2026HVAC-R and service water heating system controls—energy_progress
01/26/2026Permanent certificate—energy_progress
01/26/2026Maintenance information—energy_progress
12/23/2025Final—progress
12/23/2025Mechanical Systems—special
12/23/2025Final—progress
12/23/2025Sprinkler Systems—special
Latest 25 of 38.
13 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account