1261 FINDLAY AVENUE
BRONX · Concourse-Concourse Village · BIN 2002325
💬 Discuss this project
1930Year Built
2Stories
C1Building Class
R7-1Zoning
3,848 sfGross Floor Area
10Units
Rent Stabilized43 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: 1261 SZ AS DE LLC · 2,542 sf lot · 1.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof10p · 1 filing · 20 docs
Floor 239p · 1 filing · 20 docs
Floor 140p · 1 filing · 20 docs
Basement46p · 1 filing · 20 docs
Site & exterior15p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SCG CAPITAL2307/08/2026
1261 SZ AS DE LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/23/2024$1.2M—WELCOME STREET MANAGEMENT CORP → 1261 SZ AS LLC$307/sf building
01/12/2017$335K—— → —$87/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIKOLAI KATZ ARCHITECT305/20/2025
VASILIOS ARTEMIOU PE511/19/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H BUILDERS NYC LLCGeneral Contractor507/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616705/20/2025
SHAHRISH SHUVO ENGINEERIN8524102/12/2025
Building Lifecycle
All (127)Filed (8)Permit Issued (5)Signed Off (4)Violation (60)Inspection (8)Objection (12)Special Inspection (30)
04/02/2026
Violation issued (HPD, closed)
A
04/02/2026
Violation issued (HPD, closed)
A
04/02/2026
Violation issued (HPD, closed)
A
04/02/2026
Violation issued (HPD, closed)
A
04/02/2026
Violation issued (HPD, closed)
A
04/02/2026
Violation issued (HPD, closed)
B
04/02/2026
Violation issued (HPD, closed)
A
04/02/2026
Violation issued (HPD, closed)
A
02/20/2026
Violation issued (HPD, closed)
C
02/20/2026
Violation issued (HPD, closed)
B
05/20/2025
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION, CONVERTING AN EXISTING 2 STORY AND BASEMENT INTO A TOTAL OF 10 RESIDENTIAL UNITS
X01061302-P3
05/16/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
05/16/2025
Special inspection requirement — Metering
FAHAD FATEH
05/16/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
05/16/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
05/16/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
05/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/16/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
05/16/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
05/16/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
05/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
05/16/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
05/13/2025
Violation issued (HPD, open)
B
05/13/2025
Violation issued (HPD, closed)
C
05/13/2025
Violation issued (HPD, open)
A
05/13/2025
Violation issued (HPD, open)
A
05/13/2025
Violation issued (HPD, open)
B
03/25/2025
Signed off — Alteration CO
PROPOSED INTERIOR RENOVATION, CONVERTING AN EXISTING 2 STORY AND BASEMENT INTO A TOTAL OF 10 RESIDENTIAL UNITS
X01061302-S4
03/19/2025
Permit issued — Structural
X01061302-S4-ST
02/12/2025
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION, CONVERTING AN EXISTING 2 STORY AND BASEMENT INTO A TOTAL OF 10 RESIDENTIAL UNITS
X01061302-S4
02/11/2025
Special inspection requirement — Final
Shahrish Shuvo
02/11/2025
Special inspection requirement — Concrete - Cast-In-Place
Shahrish Shuvo
12/12/2024
Signed off — Alteration CO
PROPOSED INTERIOR RENOVATION, CONVERTING AN EXISTING 2 STORY AND BASEMENT INTO A TOTAL OF 10 RESIDENTIAL UNITS
X01061302-S2
12/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
12/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
12/04/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
12/04/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
12/03/2024
Violation issued (HPD, closed)
I
11/19/2024
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION, CONVERTING AN EXISTING 2 STORY AND BASEMENT INTO A TOTAL OF 10 RESIDENTIAL UNITS
X01061302-P2
11/19/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
11/19/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
11/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/19/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
11/19/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
10/28/2024
Signed off — Alteration CO
PROPOSED INTERIOR RENOVATION, CONVERTING AN EXISTING 2 STORY AND BASEMENT INTO A TOTAL OF 10 RESIDENTIAL UNITS
X01061302-S3
10/14/2024
Signed off — Alteration CO
PROPOSED INTERIOR RENOVATION, CONVERTING AN EXISTING 2 STORY AND BASEMENT INTO A TOTAL OF 10 RESIDENTIAL UNITS
X01061302-S1
10/08/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/27/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/25/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/23/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/04/2024
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION, CONVERTING AN EXISTING 2 STORY AND BASEMENT INTO A TOTAL OF 10 RESIDENTIAL UNITS
X01061302-P1
08/28/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
08/28/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
08/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/28/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
08/28/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
08/23/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/23/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offH BUILDERS NYC LLC03/19/2025
DOB NOWSprinklersSigned-offA M B MECHANICAL INC07/29/2024
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN07/29/2024
DOB NOWGeneral ConstructionPermit IssuedH BUILDERS NYC LLC07/23/2024
DOB NOWMechanical SystemsSigned-offH BUILDERS NYC LLC07/18/2024
BISOTISSUEDHUNTER CONTRACTING CO.12/22/1993
1 project · most recent 05/20/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/20/2025Signed-offH BUILDERS NYC LLCHeating and Air Conditioning Systems
Heat / Cool
Daikin RXF18AXVJU 20,000 BTU · Condensing Unit ×5
2MXS18NMVJU9 18,900 BTU · Condensing Unit ×2
3MXS24WMVJU9 24,000 BTU · Condensing Unit ×2
4MXS36WMVJU9 36,000 BTU · Condensing Unit ×1
1 project · most recent 05/20/2025
Sprinkler System
FiledStatusContractorScope
05/20/2025Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 05/20/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/20/2025Signed-offPRIME PIPING & HEATING INGas, Storm, Water/Sanitary
3 projects · most recent 02/18/2025
General Wiring
FiledStatusContractorScope
02/18/2025CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
08/19/2024CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
07/31/2024CompletePOWER DIRECT ELECTRIC INC—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/27/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/25/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/23/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/23/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/20/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/08/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
05/16/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
05/16/2025MeteringFAHAD FATEHenergy_progress
05/16/2025Fenestration areasFAHAD FATEHenergy_progress
05/16/2025Interior lighting powerFAHAD FATEHenergy_progress
05/16/2025Permanent certificateFAHAD FATEHenergy_progress
05/16/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/16/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
05/16/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
05/16/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
05/16/2025Maintenance informationFAHAD FATEHenergy_progress
05/16/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
05/16/2025Fenestration air leakageFAHAD FATEHenergy_progress
02/11/2025FinalShahrish Shuvoprogress
02/11/2025Concrete - Cast-In-PlaceShahrish Shuvospecial
12/04/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
12/04/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/04/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
12/04/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
12/04/2024Maintenance informationFAHAD FATEHenergy_progress
11/19/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
11/19/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
11/19/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/19/2024Maintenance informationFAHAD FATEHenergy_progress
11/19/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
08/28/2024Maintenance informationFAHAD FATEHenergy_progress
Latest 25 of 41.
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/19/2026X01061302-P1Request digital key ↗
08/19/2026X01061302-S1Request digital key ↗
08/19/2026X01061302-S3Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION3
04/25/2025200277226Open ↗
03/04/2025200277226Open ↗
12/17/2024200277226Open ↗
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature8
09/24/2026X01061302-S1Open ↗
09/24/2026X01061302-S1Open ↗
09/01/2026X01061302-S4Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/19/2026X01061302-S3Open ↗
08/19/2026X01061302-S2Open ↗
08/19/2026X01061302-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/24/2026X01061302-S1Open ↗
09/01/2026X01061302-S4Open ↗
08/31/2026X01061302-P2Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/19/2026X01061302-P3Open ↗
08/15/2026X01061302-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/19/2026X01061302-S3Open ↗
08/19/2026X01061302-S1Open ↗
08/19/2026X01061302-P3Open ↗
Showing 3 of 8 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/19/2026X01061302-P3Open ↗
08/15/2026X01061302-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X01061302-I1Open ↗