← Back
BuildNYC
Two family brick
1261 TABOR COURT
BROOKLYN · Borough Park · BIN 3141592
💬 Discuss this project
1930Year Built
2Stories
B1Building Class
R5BZoning
2,739 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family brick · 1,958 sf lot · 1.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofMinor alteration and demolitionUnder Construction13p · 1 filing · 20 docs
BulkheadMinor alteration and demolitionUnder Construction2p · 1 filing · 20 docs
Floor 2Minor alteration and demolitionUnder Construction41p · 1 filing · 20 docs
Floor 1Minor alteration and demolitionUnder Construction52p · 1 filing · 20 docs
CellarMinor alteration and demolitionUnder Construction53p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Carey Ngai Consulting Engineering210/10/2025
ZS Design Architect310/09/2025
GC Engineering & Associates305/16/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AC Building Consultants1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Blue DeerGeneral Contractor710/06/2026
Grindstone ContructionGeneral Contractor704/08/2026
Big Apple Sewer & Drain IPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Avt Engineering345510/10/2025
Building Lifecycle
10/05/2026
Permit renewed — General Construction
Renewed without changes
B00918203-I1-GC
10/05/2026
Permit renewed — Mechanical Systems
Renewed without changes
B00918203-S1-MS
10/05/2026
Permit renewed — Structural
Renewed without changes
B00918203-S3-ST
05/01/2026
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
B00918203-S2-PL
11/24/2025
Objection resolved — Addressed
88 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBlue Deer10/05/2026
DOB NOWMechanical SystemsPermit IssuedBlue Deer10/05/2026
DOB NOWStructuralPermit IssuedBlue Deer10/05/2026
DOB NOWStructuralPermit IssuedBlue Deer10/03/2025
DOB NOWMechanical SystemsPermit IssuedBlue Deer10/03/2025
DOB NOWGeneral ConstructionPermit IssuedBlue Deer10/02/2025
DOB NOWPlumbingPermit IssuedBig Apple Sewer & Drain I05/01/2025
DOB NOWStructuralPermit IssuedGrindstone Contruction12/16/2024
DOB NOWGeneral ConstructionPermit IssuedGrindstone Contruction12/11/2024
DOB NOWMechanical SystemsPermit IssuedGrindstone Contruction12/11/2024
1 project · most recent 10/10/2025
Heating and Air Conditioning Systems
FiledStatusContractorScope
10/10/2025Permit IssuedBlue DeerHeating and Air Conditioning Systems
1 project · most recent 10/10/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/10/2025Permit IssuedBig Apple Sewer & Drain IGas, Water/Sanitary
1 project · most recent 03/27/2025
General Wiring
FiledStatusContractorScope
03/27/2025Permit IssuedA.S.H. ElectricGeneral Wiring
1 project · most recent 10/10/2025
Steel Wood
FiledStatusContractorScope
10/10/2025Permit IssuedBlue DeerSteel, Wood
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/13/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/06/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
10/24/2025Fire-Resistant Penetrations and JointsJOSEPH PASATUROspecial
10/24/2025Structural Stability – Alterations of existing buildingsJOSEPH PASATUROspecial
10/24/2025Energy Code Compliance InspectionsDONALD SCHWETERprogress
10/24/2025Fire-Resistance Rated ConstructionDONALD SCHWETERprogress
10/24/2025Fenestration and door U-factor and product ratingsDONALD SCHWETERenergy_progress
10/24/2025Interior lighting powerDONALD SCHWETERenergy_progress
10/24/2025Lighting controlsDONALD SCHWETERenergy_progress
10/10/2025Structural Cold-Formed SteelJOSEPH PASATUROspecial
10/10/2025DemolitionJOSEPH PASATUROspecial
10/10/2025Structural Stability – Alterations of existing buildingsJOSEPH PASATUROspecial
10/10/2025Structural Steel - DetailsJOSEPH PASATUROspecial
10/10/2025Structural Steel - High Strength BoltingJOSEPH PASATUROspecial
10/10/2025Structural Steel - WeldingJOSEPH PASATUROspecial
10/10/2025Subgrade InspectionsJOSEPH PASATUROspecial
10/10/2025FinalCarey Ngaiprogress
10/10/2025Structural Wood FrameCarey Ngaiprogress
10/09/2025Fire-Resistant Penetrations and JointsJOSEPH PASATUROspecial
10/09/2025Structural Stability – Alterations of existing buildingsJOSEPH PASATUROspecial
10/09/2025Energy Code Compliance InspectionsDONALD SCHWETERprogress
10/09/2025Fire-Resistance Rated ConstructionDONALD SCHWETERprogress
10/09/2025Fenestration and door U-factor and product ratingsDONALD SCHWETERenergy_progress
10/09/2025Lighting controlsDONALD SCHWETERenergy_progress
10/09/2025Interior lighting powerDONALD SCHWETERenergy_progress
06/13/2024HVAC-R and service water piping design and insulationPeter Kanakosenergy_progress
06/13/2024HVAC-R and service water heating system controlsPeter Kanakosenergy_progress
Latest 25 of 31.
43 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account