Zoned residential, not Manhattan · Owner of record: RESTORED HOMES HOUSING DEVELOPMENT FUND CORP · 1,500 sf lot · 0 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire ProtectionEquipment
Permit Issued — active, not yet Signed-off
RoofUnder Construction10p · 4 filings · 20 docs
Bulkhead2p · 1 filing · 8 docs
Floor 4Under Construction9p · 2 filings · 17 docs
Floor 3Under Construction6p · 1 filing · 9 docs
Floor 2Under Construction9p · 2 filings · 17 docs
Floor 1Under Construction9p · 2 filings · 17 docs
CellarUnder Construction7p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEIGHBORHOOD RESTORE HDFC3108/30/2026
RESTORED HOMES HDFC407/08/2026
OWNERS REP704/09/2026
OWNER OF 1262 BUSHWICK AV103/22/2026
NYC HOUSING PRES DEVEL203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING2403/21/2026
AE DESIGN SOLUTION603/21/2026
AMBROSINO CONSTRUCTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMBROSINO CONST CORPGeneral Contractor607/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor504/09/2026
TOVIA WERZBERGERElectrical203/21/2026
TARGET PIPING NY LLCFire Protection208/13/2026
B&B MECH PLBG & HTG LLCPlumbing208/13/2026
DOWNEY, CONORElectrical103/21/2026
PLUMBING NYC INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERICAN CONSTRUCTION TES9731708/03/2026
CROSSCHECK INSPECTION SER544410/28/2025
CITYSCAPE ENGINEERING, PL5517107/27/2021
Building Lifecycle
All (139)Filed (19)Permit Issued (14)Signed Off (6)Violation (10)Inspection (14)Objection (46)Special Inspection (30)
09/03/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
09/03/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
08/27/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/12/2026
Permit issued — Sprinklers
B00547221-I1-PL
08/12/2026
Permit issued — Sprinklers
B00547221-I1-EW-SP
08/03/2026
Filed — Alteration
Propose plumbing and sprinkler scope of work filed in conjunction with NB # 321600479.
B00547221-P2
07/27/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01286351-I1
07/24/2026
Signed off — Alteration
B01280927-I1
07/24/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01286347-I1
07/21/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/20/2026
Signed off — Alteration
Propose foundation scope of work filed in conjunction with NB # 321600479.
B00547489-I1
07/20/2026
Signed off — Alteration
PROPOSE STRUCTURAL SCOPE OF WORK FILED IN CONJUNCTION WITH NB # 321600479
B00547325-I1
06/29/2026
Violation issued (ECB, closed)
Construction
06/29/2026
Violation issued (ECB, closed)
Construction
06/29/2026
Violation issued (ECB, closed)
Construction
05/24/2026
Special inspection requirement — Shutoff dampers
EDWIN HOPKINS
05/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWIN HOPKINS
05/24/2026
Special inspection requirement — Mechanical Systems
EDWIN HOPKINS
05/24/2026
Special inspection requirement — Final
EDWIN HOPKINS
05/24/2026
Special inspection requirement — Energy Code Compliance Inspections
EDWIN HOPKINS
05/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
EDWIN HOPKINS
05/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EDWIN HOPKINS
05/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
EDWIN HOPKINS
05/24/2026
Special inspection requirement — Maintenance information
EDWIN HOPKINS
05/20/2026
Permit issued — Construction Fence
B01235708-I1-FN
04/17/2026
Filed — Alteration
Propose mechanical scope of work filed in conjunction with NB # 321600479.
B00547210-P1
04/17/2026
Filed — Alteration
Propose plumbing and sprinkler scope of work filed in conjunction with NB # 321600479.
B00547221-P1
04/02/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
EDWIN HOPKINS
04/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EDWIN HOPKINS
04/02/2026
Special inspection requirement — Energy Code Compliance Inspections
EDWIN HOPKINS
04/02/2026
Special inspection requirement — Sprinkler Systems
EDWIN HOPKINS
04/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWIN HOPKINS
02/26/2026
Permit issued — Sprinklers
B70735566-I1-PL
02/19/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/05/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/15/2025
Signed off — Alteration
Proposed Support of Excavation works include solider piles, Timber Lagging, and angle of repose slope cut as shown on plan. This is in conjunction with New Building # 321600479.
B00547497-I1
12/03/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
11/17/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
STEVE LIN
11/17/2025
Special inspection requirement — Final
EDWIN HOPKINS
11/17/2025
Special inspection requirement — Footing and Foundation
EDWIN HOPKINS
11/17/2025
Special inspection requirement — Concrete - Cast-In-Place
EDWIN HOPKINS
11/17/2025
Special inspection requirement — Post-installed Anchors
EDWIN HOPKINS
11/17/2025
Special inspection requirement — Subgrade Inspections
EDWIN HOPKINS
11/17/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
EDWIN HOPKINS
10/28/2025
Filed — Alteration
Propose foundation scope of work filed in conjunction with NB # 321600479.
B00547489-P3
10/23/2025
Special inspection requirement — Footing and Foundation
EUGENE BIFULCO
10/23/2025
Special inspection requirement — Concrete - Cast-In-Place
EUGENE BIFULCO
10/23/2025
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
10/23/2025
Special inspection requirement — Subgrade Inspections
EUGENE BIFULCO
10/23/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
EUGENE BIFULCO
10/23/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
STEVE LIN
10/23/2025
Special inspection requirement — Final
EUGENE BIFULCO
09/18/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
09/15/2025
Permit issued — Protection and Mechanical Methods
B01286351-I1-PMM
09/12/2025
Filed — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01286351-I1
09/12/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01286347-I1
09/12/2025
Permit issued — Supported Scaffold
B01286347-I1-SF
09/05/2025
Violation issued (ECB, closed)
Construction
09/04/2025
Permit issued — Sidewalk Shed
B01280927-I1-SH
09/03/2025
Filed — Alteration
B01280927-I1
Latest 60 of 139 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offB&B MECH PLBG & HTG LLC08/12/2026
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC08/12/2026
DOB NOWConstruction FenceSigned-offAMBROSINO CONST CORP05/20/2026
DOB NOWSprinklersSigned-offPLUMBING WORKS NYC INC02/26/2026
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC09/15/2025
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC09/12/2025
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC09/04/2025
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC08/14/2025
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC08/14/2025
DOB NOWConstruction FenceSigned-offAMBROSINO CONST06/11/2025
DOB NOWFoundationSigned-offAMBROSINO CONST06/10/2025
DOB NOWStructuralSigned-offAMBROSINO CONST06/09/2025
DOB NOWMechanical SystemsPermit IssuedAMBROSINO CONST06/09/2025
DOB NOWSupport of ExcavationSigned-offAMBROSINO CONST06/09/2025
BIS—ISSUEDAMBROSINO CONST CORP06/12/2025
1 project · most recent 04/17/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/17/2026Permit IssuedAMBROSINO CONST CORPAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric PUMY-P36NKMU3 36,000 BTU · Vrf Outdoor ×8
Heating
Tpi E3703-024B 1,275 BTU · Electric Heater ×15
F3422T 6,820 BTU · Electric Heater ×4
HF 3323T-RP 5,120 BTU · Electric Heater ×2
Mitsubishi Electric PUMY-P36NKMU3 42,000 BTU · Vrf Outdoor ×8
Stelpro ARWF1001T 1,750 BTU · Electric Heater ×16
AWFA2008T 6,825 BTU · Electric Heater ×4
AWF1501T 4,710 BTU · Electric Heater ×2
Ventilation
Greenheck G-075-VG 250 CFM · Exhaust Fan ×2
SP-80-VG 80 CFM · Exhaust Fan ×1
Fantech DBF110 150 CFM · Exhaust Fan ×1
Ventacity VS 1000 RTe 825 CFM · Erv ×2
Heat / Cool
Ephoca AWP10N3H1-2 8,590 BTU · Ptac ×31
1 project · most recent 08/03/2026
FiledStatusContractorScope
08/03/2026Signed-offTARGET PIPING NY LLC109 heads
1 project · most recent 08/03/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/03/2026Signed-offTARGET PIPING NY LLCStorm, Water/Sanitary
3 projects · most recent 08/17/2026
General Wiring
FiledStatusContractorScope
08/17/2026Permit IssuedPOWER DIRECT ELECTRIC INCGeneral Wiring
09/29/2025CompletePOWER DIRECT ELECTRIC INC—
09/17/2025CompleteSOLAS ELECTRICAL CORP—
2 projects · most recent 10/28/2025
Steel Concrete Masonry
FiledStatusContractorScope
10/28/2025Signed-offAMBROSINO CONST CORP2 scope_items
02/24/2025Signed-offAMBROSINO CONST CORPSteel, Concrete, Masonry
1 project · most recent 09/12/2025
Scaffold
FiledStatusContractorScope
09/12/2025Signed-offCORE SCAFFOLD SYSTEMS INCScaffold
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
09/03/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
09/03/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
08/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/21/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/19/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/05/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/03/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/18/2025Pass-Final PL - UndergroundPassView ↗
07/18/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/18/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/22/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/22/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/20/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
05/24/2026Shutoff dampersEDWIN HOPKINSenergy_progress
05/24/2026Fire-Resistant Penetrations and JointsEDWIN HOPKINSspecial
05/24/2026Mechanical SystemsEDWIN HOPKINSspecial
05/24/2026FinalEDWIN HOPKINSprogress
05/24/2026Energy Code Compliance InspectionsEDWIN HOPKINSprogress
05/24/2026HVAC-R and service water heating system controlsEDWIN HOPKINSenergy_progress
05/24/2026HVAC-R and service water piping design and insulationEDWIN HOPKINSenergy_progress
05/24/2026HVAC-R and service water heating equipmentEDWIN HOPKINSenergy_progress
05/24/2026Maintenance informationEDWIN HOPKINSenergy_progress
04/02/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationEDWIN HOPKINSspecial
04/02/2026HVAC-R and service water piping design and insulationEDWIN HOPKINSenergy_progress
04/02/2026Energy Code Compliance InspectionsEDWIN HOPKINSprogress
04/02/2026Sprinkler SystemsEDWIN HOPKINSspecial
04/02/2026Fire-Resistant Penetrations and JointsEDWIN HOPKINSspecial
11/17/2025Subsurface Investigations (Borings/Test Pits)STEVE LINspecial
11/17/2025FinalEDWIN HOPKINSprogress
11/17/2025Footing and FoundationEDWIN HOPKINSprogress
11/17/2025Concrete - Cast-In-PlaceEDWIN HOPKINSspecial
11/17/2025Post-installed AnchorsEDWIN HOPKINSspecial
11/17/2025Subgrade InspectionsEDWIN HOPKINSspecial
11/17/2025Subsurface Conditions – Fill Placement & In-Place DensityEDWIN HOPKINSspecial
10/23/2025Footing and FoundationEUGENE BIFULCOprogress
10/23/2025Concrete - Cast-In-PlaceEUGENE BIFULCOspecial
10/23/2025Post-installed AnchorsEUGENE BIFULCOspecial
10/23/2025Subgrade InspectionsEUGENE BIFULCOspecial
Latest 25 of 55.
▾Documents — 168 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
09/01/2026B00547497-P3Request digital key ↗
09/01/2026B00547497-P1Request digital key ↗
09/01/2026B00547325-P1Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION17
02/13/2026340361628Open ↗
09/23/2024321600479Open ↗
09/16/2024321600479Open ↗
Showing 3 of 17 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
08/31/2021340818887Open ↗
04/07/2016340361628Open ↗
▸BISWORK PERMIT APPLICATION1
06/12/2025321600479Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISADDRESS: NEW HOUSE NUMBER APPROVED3
10/14/2021321600479Open ↗
08/31/2021340818887Open ↗
05/12/2016321190527Open ↗
▸BISZONING DIAGRAM2
01/13/2022321600479Open ↗
05/12/2016321190527Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
05/12/2016321190527Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
10/14/2021321600479Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
05/12/2016321190527Open ↗
▸Seals & Professional Certifications42
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/01/2026B00547497-I1Open ↗
09/01/2026B00547497-P3Open ↗
09/01/2026B00547497-P2Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/27/2026B00547489-I1Open ↗
09/27/2026B00547489-I1Open ↗
09/19/2026B00547489-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/27/2026B00547489-I1Open ↗
09/19/2026B00547489-P2Open ↗
08/29/2026B00547325-I1Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
08/31/2021340818887Open ↗
04/07/2016340361628Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/09/2021340818887Open ↗
▸Trade Schedules & Equipment3
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
05/12/2016321190527Open ↗
▸BISSCHEDULE B - PLUMBING1
04/06/2016321190527Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
10/14/2021321600479Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST4
01/13/2022321600479Open ↗
10/14/2021321600479Open ↗
08/31/2021340818887Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
06/11/2025321600479Open ↗
08/31/2021340818887Open ↗
▸BISBPP: STREET TREES SITE PLAN1
08/31/2021340818887Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
11/03/2025321600479Open ↗
06/11/2025321600479Open ↗
01/13/2022321600479Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY8
11/14/2025321600479Open ↗
06/11/2025321600479Open ↗
02/08/2023321600479Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSOIL REPORT4
08/13/2026B00547489-P3Open ↗
08/13/2026B00547489-P1Open ↗
08/13/2026B00547489-P2Open ↗
Showing 3 of 4 on file for this type
▸BISSOIL REPORT2
10/14/2021321600479Open ↗
05/12/2016321190527Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
10/14/2021321600479Open ↗
06/13/2016321190527Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
06/12/2025321600479Open ↗
▸BISHYDRO FLOW TEST LETTER1
05/12/2016321190527Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00547489-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00547489-I1Open ↗
▸Approvals, Objections & Sign-offs26
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter18
09/01/2026B00547497-P3Open ↗
09/01/2026B00547497-P1Open ↗
08/20/2026B01280927-I1Open ↗
Showing 3 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
02/08/2023321600479Open ↗
02/08/2023321600479Open ↗
02/08/2023321600479Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
06/23/2016321190527Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE2
06/12/2025321600479Open ↗
06/11/2025321600479Open ↗
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION7
06/05/2025321600479Open ↗
11/14/2024321600479Open ↗
10/07/2024321600479Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
09/09/2021340818887Open ↗
04/07/2016340361628Open ↗
▸BISEFILING COVER SHEET2
11/17/2015321190527Open ↗
11/17/2015321190527Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/31/2021340818887Open ↗
▸Other Documents5
▸BISPLOT DIAGRAM2
02/08/2023321600479Open ↗
05/12/2016321190527Open ↗
▸BISSupporting Document: Fee Deferment1
05/12/2016321190527Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
12/03/2021321600479Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00547497-I1Open ↗