← Back
Miscellaneous hospital / health care facility
1262 EAST 14 STREET
BROOKLYN · Midwood · BIN 3180645
💬 Discuss this project
1934Year Built
4Stories
I9Building Class
M1-1Zoning
78,765 sfGross Floor Area
1Units
LL97 Covered3 Open Violations ▸FDNY Report ↗
Miscellaneous hospital / health care facility · 23,619 sf lot · 3.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Roof22p · 5 filings · 20 docs
Floor 448p · 7 filings · 20 docs
Floor 35p · 2 filings · 6 docs
Floor 25p · 2 filings · 6 docs
Floor 17p · 4 filings · 12 docs
Cellar1 filing · 4 docs
Site & exterior7p · 2 filings · 4 docs
Filed — no permit issued2p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AVENUE M REALTY HOLDINGS LLC703/21/2026
MARSTAN DEVELOPMENT403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/11/2014$10.8M—— → —$138/sf building
10/30/2014$8.4M—AVENUE M REALTY HOLDINGS LLC → Private party$107/sf building
12/09/2013$15.1M—— → —$191/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A E C CONSULTING EXPEDITING2203/21/2026
AE DESIGN SOLUTION403/21/2026
MEP DESIGNS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RUBIN DEVEL AND CONST INCGeneral Contractor2607/08/2026
CARO GROUP LTDGeneral Contractor504/09/2026
POWERS BRIDGING & SCAFFOLDINGGeneral Contractor407/08/2026
ARIANA CONTRACTING INCPlumbing407/08/2026
COPPER PLUMBING INCPlumbing407/08/2026
LIGHTEN UP ELEC'L SERVICEElectrical203/22/2026
WOHL & O'MARA, LLPGeneral Contractor203/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KALLASSY ENGINEERING PLLC57111101/20/2026
IP CONCRETE TESTING AND I6252101/04/2024
AVID DESIGNS, INC.453106/19/2020
Building Lifecycle
All (156)Filed (18)Permit Issued (26)Signed Off (9)Violation (60)Inspection (11)Objection (2)Special Inspection (30)
02/20/2026
Signed off — Alteration
Project scope shall include modifying an existing sprinkler system including piping and sprinkler heads on the 4th floor of this existing building. No change to use, egress or occupancy.
B01026725-I1
02/18/2026
Signed off — Alteration
Installation of HVAC units and associated ducting as per plans. No change to use, egress or occupancy.
B01026770-I1
02/17/2026
Signed off — Alteration
B01021559-I1
02/03/2026
Signed off — Alteration
Project scope shall include new plumbing systems in existing building installation will include new sanitary, vent and domestic H/C water piping and electric hot water heater on the fourth floor on this existing building.
B01026717-I1
01/20/2026
Filed — Alteration
Installation of HVAC units and associated ducting as per plans. No change to use, egress or occupancy.
B01026770-P2
01/16/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/16/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/16/2026
Special inspection requirement — Energy Code Compliance Inspections
Joseph El-kallassy
01/16/2026
Special inspection requirement — Maintenance information
Joseph El-kallassy
01/16/2026
Special inspection requirement — Final
Joseph El-kallassy
01/16/2026
Special inspection requirement — Mechanical Systems
Joseph El-kallassy
01/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
Joseph El-kallassy
01/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph El-kallassy
01/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
Joseph El-kallassy
01/16/2026
Special inspection requirement — Duct leakage testing, insulation and design
Joseph El-kallassy
01/16/2026
Special inspection requirement — Shutoff dampers
Joseph El-kallassy
01/13/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/12/2026
Signed off — Alteration
The project is an interior renovation on the 4th floor. The project scope includes the construction of interior partitions for the proposed office space and a new dormer to the exterior terrace. No change in use
B01013629-I1
01/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/08/2026
Signed off — Alteration
MODIFICATION TO EXISTING ALTERED ROOF TRUSSES TO ALLOW COMMUNICATION BETWEEN NEW PROPOSED OFFICES. PROVIDED NEW DUNNAGE AT EXISTING 4TH FLOOR MECHANICAL ROOFTOP. PROVIDED NEW DOORWAY DORMER THROUGH EXTERIOR WALL TO 4TH FLOOR MECHANICAL ROOF.
B01028053-I1
12/30/2025
Signed off — Alteration
Installation of fuel storage and piping in conjunction with generator located on roof. Generator filed under application B00357983.
B00962034-I1
11/20/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/31/2025
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
10/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/20/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/10/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Joseph El-kallassy
10/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph El-kallassy
10/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Joseph El-kallassy
10/10/2025
Special inspection requirement — Final
Joseph El-kallassy
10/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
Joseph El-kallassy
10/10/2025
Special inspection requirement — Air barrier - visual inspection
Joseph El-kallassy
10/10/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Joseph El-kallassy
10/10/2025
Special inspection requirement — Fenestration air leakage
Joseph El-kallassy
10/10/2025
Special inspection requirement — Insulation placement and R values
Joseph El-kallassy
10/10/2025
Special inspection requirement — Fenestration areas
Joseph El-kallassy
10/10/2025
Special inspection requirement — Air barrier — testing
Joseph El-kallassy
09/25/2025
Filed — Alteration
The project is an interior renovation on the 4th floor. The project scope includes the construction of interior partitions for the proposed office space and a new dormer to the exterior terrace. No change in use
B01013629-P1
09/11/2025
Filed — Alteration
Project scope shall include modifying an existing sprinkler system including piping and sprinkler heads on the 4th floor of this existing building. No change to use, egress or occupancy.
B01026725-P2
09/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph El-kallassy
09/11/2025
Special inspection requirement — Sprinkler Systems
Joseph El-kallassy
09/09/2025
Special inspection requirement — Sprinkler Systems
Joseph El-kallassy
09/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph El-kallassy
09/05/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/04/2025
Filed — Alteration
Installation of HVAC units and associated ducting as per plans. No change to use, egress or occupancy.
B01026770-P1
09/04/2025
Filed — Alteration
Project scope shall include modifying an existing sprinkler system including piping and sprinkler heads on the 4th floor of this existing building. No change to use, egress or occupancy.
B01026725-P1
09/04/2025
Filed — Alteration
Project scope shall include new plumbing systems in existing building installation will include new sanitary, vent and domestic H/C water piping and electric hot water heater on the fourth floor on this existing building.
B01026717-P1
08/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
Joseph El-kallassy
08/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph El-kallassy
08/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph El-kallassy
08/28/2025
Special inspection requirement — Sprinkler Systems
Joseph El-kallassy
08/28/2025
Special inspection requirement — Energy Code Compliance Inspections
Joseph El-kallassy
08/28/2025
Special inspection requirement — Final
Joseph El-kallassy
06/03/2025
Permit issued — Mechanical Systems
B01026770-I1-MS
06/03/2025
Permit issued — Structural
B01028053-I1-ST
03/31/2025
Permit issued — Supported Scaffold
B01027982-I1-SF
03/17/2025
Permit issued — Sidewalk Shed
B01021559-I1-SH
02/06/2025
Permit issued — General Construction
B01013629-I1-GC
01/02/2025
Permit issued — Boiler Equipment
B00962034-I1-BE
11/15/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 156 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCARO GROUP06/03/2025
DOB NOWStructuralSigned-offCARO GROUP06/03/2025
DOB NOWSupported ScaffoldSigned-offPOWERS BRIDGING & SCAFFOL03/31/2025
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL03/17/2025
DOB NOWGeneral ConstructionSigned-offCARO GROUP02/06/2025
DOB NOWBoiler EquipmentSigned-offMICHAEL S. KAPLAN01/02/2025
DOB NOWMechanical SystemsPermit IssuedRUBIN DEVEL AND CONST INC10/28/2024
DOB NOWSprinklersSigned-offARIANA CONTRACTING INC10/28/2024
DOB NOWPlumbingSigned-offCOPPER MECHANICAL INC10/03/2024
DOB NOWGeneral ConstructionSigned-offCARO GROUP06/12/2024
DOB NOWSupported ScaffoldSigned-offPOWERS BRIDGING & SCAFFOL04/02/2024
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL03/21/2024
DOB NOWBoiler EquipmentSigned-offMICHAEL S. KAPLAN02/28/2024
DOB NOWMechanical SystemsPermit IssuedRUBIN DEVEL AND CONST INC11/22/2023
DOB NOWMechanical SystemsPermit IssuedRUBIN DEVEL AND CONST INC05/30/2023
DOB NOWMechanical SystemsPermit IssuedRUBIN DEVEL AND CONST INC12/19/2022
DOB NOWMechanical SystemsPermit IssuedRUBIN DEVEL AND CONST INC12/09/2022
DOB NOWMechanical SystemsPermit IssuedRUBIN DEVEL AND CONST INC12/06/2022
DOB NOWMechanical SystemsPermit IssuedRUBIN DEVEL AND CONST INC11/09/2022
DOB NOWMechanical SystemsPermit IssuedRUBIN DEVEL AND CONST INC10/24/2022
DOB NOWMechanical SystemsPermit IssuedRUBIN DEVEL AND CONST INC08/30/2022
DOB NOWMechanical SystemsPermit IssuedRUBIN DEVEL AND CONST INC05/25/2022
DOB NOWMechanical SystemsPermit IssuedRUBIN DEVEL AND CONST INC08/30/2021
DOB NOWMechanical SystemsPermit IssuedRUBIN DEVEL AND CONST INC09/22/2020
DOB NOWCurb CutPermit IssuedRUBIN DEVEL AND CONST INC06/02/2020
DOB NOWCurb CutPermit IssuedRUBIN DEVEL AND CONST INC06/02/2020
BISOTISSUEDRUBIN DEVEL AND CONST INC05/30/2023
BISOTISSUEDRUBIN DEVEL AND CONST INC05/24/2022
BISOTISSUEDRUBIN DEVEL AND CONST INC05/27/2020
BISPLISSUEDBEST MECHANICAL SVCS INC04/03/2019
BISOTISSUEDCITY SIGNS INC01/03/2019
BISMHISSUEDAIRMARK HVAC, LLC10/29/2018
BIS—ISSUEDRUBIN DEVEL AND CONST INC05/24/2018
BISOTISSUEDRUBIN DEVEL AND CONST INC05/24/2018
BISEQISSUEDRUBIN DEVEL AND CONST INC12/08/2017
BIS—ISSUEDRUBIN DEVEL AND CONST INC11/30/2017
BISSPISSUEDTRISTATE FIRE SPRINK INC10/24/2017
BIS—ISSUEDZ-CAR-D CORP07/19/2017
BIS—ISSUEDZ-CAR-D CORP07/19/2017
BIS—ISSUEDZ-CAR-D CORP07/19/2017
+ 32 more permits on file
9 projects · most recent 06/04/2026
General Wiring Lighting
FiledStatusContractorScope
06/04/2026CompleteRM ELECTRIC CO., INC.General Wiring
03/26/2026CompleteA.C.M. ELEC'L CONTR'G CORGeneral Wiring
08/19/2024CompleteA.C.M. ELEC'L CONTR'G CORGeneral Wiring
03/22/2024CompleteOPTIMAL ELECTRIC, INC—
02/15/2021Permit IssuedBRANDL ELECTRIC INC.General Wiring
01/28/2021CompleteRFG ELECTRICAL CONTRACTINGeneral Wiring
05/20/2019CompleteBRANDL ELECTRIC INC.General Wiring
02/20/2019Permit IssuedLIGHTEN UP ELEC'L SERVICEGeneral Wiring
02/08/2018CompleteLIGHTEN UP ELEC'L SERVICEGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
01/16/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/16/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/13/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/31/2025Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
10/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/31/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/20/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/05/2025Pass-Final Boiler Equipment InspectionPassView ↗
11/15/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
01/16/2026Energy Code Compliance InspectionsJoseph El-kallassyprogress
01/16/2026Maintenance informationJoseph El-kallassyenergy_progress
01/16/2026FinalJoseph El-kallassyprogress
01/16/2026Mechanical SystemsJoseph El-kallassyspecial
01/16/2026HVAC-R and service water heating system controlsJoseph El-kallassyenergy_progress
01/16/2026HVAC-R and service water piping design and insulationJoseph El-kallassyenergy_progress
01/16/2026HVAC-R and service water heating equipmentJoseph El-kallassyenergy_progress
01/16/2026Duct leakage testing, insulation and designJoseph El-kallassyenergy_progress
01/16/2026Shutoff dampersJoseph El-kallassyenergy_progress
10/10/2025Exterior Insulation and Finish Systems (EIFS)Joseph El-kallassyspecial
10/10/2025Fire-Resistant Penetrations and JointsJoseph El-kallassyspecial
10/10/2025Energy Code Compliance InspectionsJoseph El-kallassyprogress
10/10/2025FinalJoseph El-kallassyprogress
10/10/2025Fire-Resistance Rated ConstructionJoseph El-kallassyprogress
10/10/2025Air barrier - visual inspectionJoseph El-kallassyenergy_progress
10/10/2025Fenestration and door U-factor and product ratingsJoseph El-kallassyenergy_progress
10/10/2025Fenestration air leakageJoseph El-kallassyenergy_progress
10/10/2025Insulation placement and R valuesJoseph El-kallassyenergy_progress
10/10/2025Fenestration areasJoseph El-kallassyenergy_progress
10/10/2025Air barrier — testing Joseph El-kallassyenergy_progress
09/11/2025Fire-Resistant Penetrations and JointsJoseph El-kallassyspecial
09/11/2025Sprinkler SystemsJoseph El-kallassyspecial
09/09/2025Sprinkler SystemsJoseph El-kallassyspecial
09/09/2025Fire-Resistant Penetrations and JointsJoseph El-kallassyspecial
08/28/2025HVAC-R and service water heating equipmentJoseph El-kallassyenergy_progress
Latest 25 of 43.
▾Documents — 821 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch14
08/26/2026B00962034-I1Request digital key ↗
08/25/2026B01013629-P1Request digital key ↗
08/25/2026B01021559-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Curb Cut2
09/02/2026B00200594-I1Request digital key ↗
09/02/2026B00200578-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00357983-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/02/2026B00442070-I1Request digital key ↗
▸Applications & Permits136
▸BISPLAN / WORK APPROVAL APPLICATION84
12/04/2025320812386Open ↗
11/03/2025320812386Open ↗
10/29/2025320812386Open ↗
Showing 3 of 84 on file for this type
▸BISWORK PERMIT APPLICATION31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISPLACE OF ASSEMBLY6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISZONING EXHIBIT I- CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications171
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION56
04/20/2020321078383Open ↗
04/20/2020321078383Open ↗
03/26/2020321620750Open ↗
Showing 3 of 56 on file for this type
▸DOB NOWProgress Inspector Seal & Signature26
09/01/2026B01026770-P2Open ↗
09/01/2026B01026770-P2Open ↗
09/01/2026B01026770-P2Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/02/2026B00442070-I1Open ↗
08/25/2026B01013629-P1Open ↗
08/25/2026B01013629-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/23/2026B01026725-I1Open ↗
09/23/2026B01026725-I1Open ↗
09/02/2026B01026725-P1Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY13
07/03/2020340740773Open ↗
Showing 1 of 13 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
07/03/2020340740773Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment49
▸BISEQUIPMENT USE PERMITS27
12/10/2020321310844Open ↗
12/10/2020321310844Open ↗
12/10/2020321310844Open ↗
Showing 3 of 27 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT11
12/10/2020321310844Open ↗
12/10/2020321310844Open ↗
12/10/2020321310844Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING3
06/03/2022321063246Open ↗
02/02/2021321063246Open ↗
11/02/2020321063246Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection13
▸BISSTREET TREE CHECKLIST13
05/06/2021321686421Open ↗
Showing 1 of 13 on file for this type
▸Environmental & Asbestos16
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/25/2026B01028053-I1Open ↗
08/20/2026B01026725-I1Open ↗
08/18/2026B01026770-I1Open ↗
Showing 3 of 5 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00962034-I1Open ↗
▸Energy Compliance65
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS21
03/31/2020321620769Open ↗
03/31/2020321620741Open ↗
Showing 2 of 21 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY15
09/21/2020321310844Open ↗
09/21/2020321310844Open ↗
07/18/2020321310844Open ↗
Showing 3 of 15 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS10
09/21/2020321310844Open ↗
09/11/2020321310844Open ↗
07/18/2020321310844Open ↗
Showing 3 of 10 on file for this type
▸BISNYCECC ANALYSIS8
04/15/2021340775959Open ↗
07/06/2020340740773Open ↗
Showing 2 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS7
07/03/2020340740773Open ↗
Showing 1 of 7 on file for this type
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT2
04/15/2021340775959Open ↗
07/03/2020340740773Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports54
▸BISTECHNICAL REPORT: RESPONSIBILITY32
07/27/2021321310782Open ↗
07/27/2021321310782Open ↗
07/20/2021320812386Open ↗
Showing 3 of 32 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION7
03/08/2023321310782Open ↗
Showing 1 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISMASONRY MANUFACTURER'S STATEMENT-FORM 10H2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
04/15/2021340775959Open ↗
▸BIS2008 CODE TR1 REQUIRED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP Hydrant Flow Test Letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs96
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST47
06/30/2021321078383Open ↗
02/12/2021321620750Open ↗
01/22/2021320812386Open ↗
Showing 3 of 47 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION24
03/03/2023321310782Open ↗
12/01/2020320812386Open ↗
09/29/2020321310782Open ↗
Showing 3 of 24 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
06/14/2024320812386Open ↗
06/12/2024320812386Open ↗
12/22/2023320812386Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
09/02/2026B00442070-I1Open ↗
08/25/2026B01013629-P1Open ↗
08/15/2026B01013629-I1Open ↗
Showing 3 of 7 on file for this type
▸BISSUPERSEDING LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Cost, Insurance & Ownership56
▸BISCOST AFFIDAVIT53
06/28/2021321078383Open ↗
04/13/2021321078383Open ↗
09/21/2020321310844Open ↗
Showing 3 of 53 on file for this type
▸BISDEPT OF FINANCE VERIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISWELDERS AFFIDAVIT1
07/20/2021320812386Open ↗
▸Filing & Intake Forms113
▸BISBOROUGH INTAKE FORM44
03/31/2020321620769Open ↗
03/31/2020321620741Open ↗
03/31/2020321620750Open ↗
Showing 3 of 44 on file for this type
▸BISADDITIONAL INFORMATION40
12/11/2025320812386Open ↗
11/06/2025320812386Open ↗
01/08/2024320812386Open ↗
Showing 3 of 40 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET15
07/03/2020340740773Open ↗
Showing 1 of 15 on file for this type
▸BISEFILING COVER SHEET14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸Other Documents19
▸BISUnknown4
12/10/2020321310844Open ↗
12/10/2020321310844Open ↗
12/10/2020321310844Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
05/06/2021321686421Open ↗
05/06/2021321686421Open ↗
03/18/2021321686421Open ↗
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET2
04/15/2021340775959Open ↗
07/03/2020340740773Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMICROFILM/SCAN: INITIAL1
03/03/2023321310782Open ↗
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type