← Back
Two stories - detached, small or mid-size
1262 MASON AVENUE
STATEN ISLAND · New Dorp-Midland Beach · BIN 5054776
💬 Discuss this project
1970Year Built
2Stories
A1Building Class
R3-1Zoning
1,680 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.42 FAR built · Flood zone X500
Locations of Work
Electrical
Roof5p · 1 filing · 17 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC210/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272210/23/2024
Building Lifecycle
All (14)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (10)
09/03/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01101102-I1
10/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/30/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
10/30/2024
Special inspection requirement — Final
Walid Abdulla
10/30/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
10/30/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
10/23/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01101102-P1
10/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
10/16/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
10/16/2024
Special inspection requirement — Final
Walid Abdulla
10/16/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
09/09/2024
Permit issued — Solar
S01101102-I1-SL
08/27/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01101102-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC09/09/2024
3 projects · most recent 10/07/2024
General Wiring
FiledStatusContractorScope
10/07/2024CompleteA.L. ELECTRICAL CORP.General Wiring
08/27/2024CompleteSUNRUN SOLAR ELECTL CORPGeneral Wiring
03/26/2024CompleteA.L. ELECTRICAL CORP.1 meters
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
10/30/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/30/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/30/2024FinalWalid Abdullaprogress
10/30/2024Energy Code Compliance InspectionsWalid Abdullaprogress
10/30/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
10/16/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/16/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/16/2024Energy Code Compliance InspectionsWalid Abdullaprogress
10/16/2024FinalWalid Abdullaprogress
10/16/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026S01101102-P1Request digital key ↗
08/20/2026S01101102-I1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
08/27/2026S01101102-P1Open ↗
08/27/2026S01101102-P1Open ↗
08/27/2026S01101102-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/27/2026S01101102-P1Open ↗
08/27/2026S01101102-P1Open ↗
08/23/2026S01101102-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/20/2026S01101102-P1Open ↗
08/20/2026S01101102-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/20/2026S01101102-P1Open ↗
08/20/2026S01101102-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01101102-I1Open ↗