ECB01/08/2026FAILURE TO INSTITURE/MAINTAIN SAFETY EQUIP OR TEMPORARY CONTRACTING "NO TOE BOARD". AS NOTED; AT TIME OF INSPECTION AT AN ACTIVE JOBSITE FORA PROPOSED 3 STORY BUILDING ALREADY AT THE 2ND FLOOR LEVEL. OBSERVED A$5K due
ECB01/08/2026FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIP MEASURE/TEMPORARY CONSTRUCTION "NO HANDRAIL". AS NOTED: AT TIME OF INSPECTION AT ON ACTIVE JOBSITE FOR A PROPOSED 3 STORY BUILDING ALREADY AT THE 2ND FLOOR LEVEL. OBSE$2K due
Two family converted from one family · 4,700 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.