← Back
Walk-up apt, over six families with stores
1263 JEROME AVENUE
BRONX · BIN 2008280
💬 Discuss this project
1921Year Built
5Stories
C7Building Class
R9AZoning
10,525 sfGross Floor Area
12Units
Rent Stabilized28 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: CASTILLO IGNACIO 7 · 2,500 sf lot · 4.21 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EXCLUSIVE REALTY CORP1403/22/2026
CASTILLO IGNACIO 7103/22/2026
EXCLUSIVE MANAGEMENT803/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.407/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P C803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WARD PLUMBING CORPPlumbing307/08/2026
BEARD, JOIElectrical103/21/2026
FABCON PRECAST LLCElectrical103/21/2026
JIMENEZ LUISElectrical103/21/2026
LUIS JIMENEZElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851407/08/2022
Building Lifecycle
All (82)Filed (4)Permit Issued (2)Signed Off (2)Violation (58)Inspection (4)Special Inspection (12)
06/18/2026
Violation issued (HPD, open)
A
06/18/2026
Violation issued (HPD, open)
B
07/06/2025
Violation issued (HPD, closed)
A
04/15/2025
Violation issued (FDNY_ORDER, closed)
03/31/2025
Violation issued (HPD, closed)
B
03/31/2025
Violation issued (HPD, closed)
B
03/31/2025
Violation issued (HPD, closed)
B
03/31/2025
Violation issued (HPD, open)
B
03/31/2025
Violation issued (HPD, closed)
B
12/14/2024
Violation issued (HPD, open)
B
12/14/2024
Violation issued (HPD, open)
C
12/14/2024
Violation issued (HPD, open)
C
12/14/2024
Violation issued (HPD, open)
B
11/08/2024
Violation issued (HPD, open)
B
11/08/2024
Violation issued (HPD, closed)
A
11/08/2024
Violation issued (HPD, closed)
B
11/08/2024
Violation issued (HPD, closed)
B
11/08/2024
Violation issued (HPD, closed)
C
11/08/2024
Violation issued (HPD, closed)
B
11/08/2024
Violation issued (HPD, closed)
C
11/08/2024
Violation issued (HPD, open)
B
11/08/2024
Violation issued (HPD, open)
B
11/08/2024
Violation issued (HPD, open)
B
11/08/2024
Violation issued (HPD, open)
B
11/08/2024
Violation issued (HPD, open)
C
11/08/2024
Violation issued (HPD, open)
A
11/08/2024
Violation issued (HPD, open)
B
11/08/2024
Violation issued (HPD, open)
A
11/08/2024
Violation issued (HPD, open)
A
11/08/2024
Violation issued (HPD, open)
B
11/08/2024
Violation issued (HPD, open)
B
11/08/2024
Violation issued (HPD, open)
B
11/08/2024
Violation issued (HPD, open)
B
11/08/2024
Violation issued (HPD, open)
B
10/24/2024
Violation issued (HPD, closed)
B
10/24/2024
Violation issued (HPD, closed)
A
10/24/2024
Violation issued (HPD, closed)
B
10/24/2024
Violation issued (HPD, closed)
C
10/24/2024
Violation issued (HPD, closed)
A
02/06/2023
Signed off — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING. INSTALL TEMPORARY OIL FIRED WATER HEATER TO BE REMOVED UPON FIRING OF BOILER.
X00721419-I1
02/06/2023
Signed off — Alteration
REPLACEMENT BOILER AND GAS BURNER AND REMOVE EXISTING OIL TANK.
X00720016-I1
01/09/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/03/2022
Violation issued (HPD, closed)
I
08/19/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/19/2022
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
08/12/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/13/2022
Special inspection requirement — Heating Systems
LOUIS ARENA
07/13/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
07/13/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
07/13/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
07/13/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
07/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
07/08/2022
Filed — Alteration
REPLACEMENT BOILER AND GAS BURNER AND REMOVE EXISTING OIL TANK.
X00720016-P1
07/08/2022
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING. INSTALL TEMPORARY OIL FIRED WATER HEATER TO BE REMOVED UPON FIRING OF BOILER.
X00721419-P1
06/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
06/22/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
06/22/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
06/22/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
06/22/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
06/22/2022
Special inspection requirement — Heating Systems
LOUIS ARENA
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWARD PLUMBING CORP05/13/2022
DOB NOWBoiler EquipmentSigned-offWARD PLUMBING CORP05/13/2022
BISFPISSUEDMASTER FIRE SYSTEMS, INC05/30/2007
BISOTISSUEDH& A HEATING & AIR CONDITIONING01/14/2005
BISBLISSUEDJACK PICCINI, INC01/20/2004
BISFPISSUEDACCURATE FIRE PROTECTION SYSTEMS10/18/2001
BISFPISSUEDMASTER FIRE SYSTEMS, INC12/12/1995
BISFBISSUEDDUAL FUEL PLUMBING & HEATING12/27/1994
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/09/2023Pass-Final Boiler Equipment InspectionPassView ↗
08/19/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/19/2022Fail-Final Boiler Equipment InspectionFailView ↗
08/12/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
07/13/2022Heating SystemsLOUIS ARENAspecial
07/13/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
07/13/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
07/13/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
07/13/2022Maintenance informationLOUIS ARENAenergy_progress
07/11/2022Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
06/22/2022Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
06/22/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
06/22/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
06/22/2022Maintenance informationLOUIS ARENAenergy_progress
06/22/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
06/22/2022Heating SystemsLOUIS ARENAspecial
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/24/2026X00721419-I1Request digital key ↗
08/24/2026X00721419-P1Request digital key ↗
08/24/2026X00720016-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026X00720016-I1Open ↗
09/21/2026X00720016-P1Open ↗
09/01/2026X00721419-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/24/2026X00721419-I1Open ↗
08/24/2026X00720016-P1Open ↗
08/24/2026X00720016-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026X00720016-I1Open ↗
09/21/2026X00720016-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026X00721419-I1Open ↗
08/24/2026X00720016-I1Open ↗
08/24/2026X00720016-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00720016-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00720016-I1Open ↗