← Back
BuildNYC
Three families
1263 TABOR COURT
BROOKLYN · Borough Park · BIN 3141591
💬 Discuss this project
1930Year Built
2Stories
C0Building Class
R5BZoning
2,970 sfGross Floor Area
3Units
Rent Stabilized13 Active Violations ▸FDNY Report ↗
Three families · 2,442 sf lot · 1.22 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 27p · 2 filings · 20 docs
Floor 17p · 2 filings · 20 docs
Cellar7p · 2 filings · 20 docs
Site & exterior1 filing · 2 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/11/2021$1.5M—IGNAZIO R. AND HELEN MAE GRIPPI TRUST → Private party$512/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Billah Engineering107/08/2022
Arc Consulting Engineers406/10/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRK Creative803/21/2026
Ecdesign Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
First Star ConstructionGeneral Contractor303/21/2026
Splen ConstructionGeneral Contractor107/08/2026
Catman PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Arc Consulting Engineers4083506/10/2021
Building Lifecycle
05/06/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
11/19/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
06/11/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
11/27/2024
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
04/12/2024
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
47 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSplen Construction08/05/2022
DOB NOWPlumbingSigned-offCatman Plumbing02/19/2021
DOB NOWGeneral ConstructionSigned-offFirst Star Construction02/18/2021
1 project · most recent 05/05/2021
Gas Water/Sanitary
FiledStatusContractorScope
05/05/2021Signed-offCatman PlumbingGas, Water/Sanitary
1 project · most recent 06/10/2021
General Wiring
FiledStatusContractorScope
06/10/2021CompleteFirst Star ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/16/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
06/11/2021Fire-Resistant Penetrations and JointsJAN PEREZspecial
06/11/2021Concrete - Cast-In-PlaceJAN PEREZspecial
06/11/2021Energy Code Compliance InspectionsJAN PEREZprogress
06/11/2021Lighting in dwelling unitsJAN PEREZenergy_progress
06/11/2021HVAC-R and service water piping design and insulationJAN PEREZenergy_progress
06/09/2021Concrete - Cast-In-PlaceJAN PEREZspecial
06/09/2021Fire-Resistant Penetrations and JointsJAN PEREZspecial
06/09/2021Energy Code Compliance InspectionsJAN PEREZprogress
06/09/2021HVAC-R and service water piping design and insulationJAN PEREZenergy_progress
06/09/2021Lighting in dwelling unitsJAN PEREZenergy_progress
05/06/2021Fire-Resistant Penetrations and JointsJAN PEREZspecial
05/06/2021Energy Code Compliance InspectionsJAN PEREZprogress
05/06/2021HVAC-R and service water piping design and insulationJAN PEREZenergy_progress
05/06/2021HVAC-R and service water heating system controlsJAN PEREZenergy_progress
05/06/2021HVAC-R and service water heating equipmentJAN PEREZenergy_progress
04/20/2021Fire-Resistant Penetrations and JointsJAN PEREZspecial
04/20/2021Energy Code Compliance InspectionsJAN PEREZprogress
04/20/2021HVAC-R and service water heating system controlsJAN PEREZenergy_progress
04/20/2021HVAC-R and service water piping design and insulationJAN PEREZenergy_progress
04/20/2021HVAC-R and service water heating equipmentJAN PEREZenergy_progress
36 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account