LL97 Covered1 Open Violation 0 unresolved · 1 paperwork only▸
ECB04/11/2024FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #907678. REMEDY: SUBMIT ACCEPTABLE REQUNothing owed — awaiting certificate of correction
Hospital, sanitarium, mental institution · Owner of record: BRONX-LEBANON HOSPITAL CENTER · 31,980 sf lot · 3.39 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.