← Back
Factory, heavy manufacturing, fireproof
127-08 91 AVENUE
QUEENS · Richmond Hill · BIN 4196801
💬 Discuss this project
1930Year Built
1Stories
F1Building Class
M1-1Zoning
8,000 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Factory, heavy manufacturing, fireproof · Owner of record: 91ST AVENUE LLC · 10,500 sf lot · 0.76 FAR built · Flood zone X
Locations of Work
Mechanical
Floor 11 filing · 4 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/11/2020$1.5M—Private party → 91ST AVENUE LLC$188/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.212/30/2019
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MID COUNTY MECHANICAL CORGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808212/30/2019
Building Lifecycle
All (11)Filed (2)Permit Issued (2)Signed Off (2)Violation (2)Special Inspection (3)
10/17/2024
Violation issued (FDNY_NOV, closed)
11/22/2021
Violation issued (FDNY_NOV, closed)
07/01/2020
Signed off — Alteration
INSTALL TWO (2) OIL FIRED HOT AIR UNIT HEATERS AND FUEL OIL PIPING SUPPLY LINE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00266180-I1
07/01/2020
Signed off — Alteration
INSTALL TWO (2) OIL FIRED HOT AIR UNIT HEATERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00266841-I1
12/30/2019
Filed — Alteration
INSTALL TWO (2) OIL FIRED HOT AIR UNIT HEATERS AND FUEL OIL PIPING SUPPLY LINE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00266180-I1
12/30/2019
Filed — Alteration
INSTALL TWO (2) OIL FIRED HOT AIR UNIT HEATERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00266841-I1
12/30/2019
Permit issued — Mechanical Systems
Q00266841-I1-MS
12/30/2019
Permit issued — Boiler Equipment
Q00266180-I1-BE
11/18/2019
Special inspection requirement — Mechanical Systems
Joseph Bazini
11/18/2019
Special inspection requirement — Final
Joseph Bazini
11/15/2019
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Joseph Bazini
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMID COUNTY MECHANICAL COR12/30/2019
DOB NOWBoiler EquipmentPermit IssuedMID-COUNTY MECHANICAL CO12/30/2019
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
11/18/2019Mechanical SystemsJoseph Bazinispecial
11/18/2019FinalJoseph Baziniprogress
11/15/2019Fuel-Oil Storage and Fuel-Oil Piping SystemsJoseph Bazinispecial
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/28/2026Q00266841-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/28/2026Q00266180-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/28/2026Q00266180-I1Open ↗
08/28/2026Q00266841-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026Q00266180-I1Open ↗
08/31/2026Q00266841-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/31/2026Q00266841-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/28/2026Q00266180-I1Open ↗
08/28/2026Q00266841-I1Open ↗