← Back
BuildNYC
Two family converted from one family
127 BAY 23 STREET
BROOKLYN · Bath Beach · BIN 3167825
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R5Zoning
1,420 sfGross Floor Area
2Units
Two family converted from one family · Owner of record: 127 Bay 23rd Street Realty · 2,034 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofCellar, 1st, 2nd floor renovation and plumbing2p · 2 filings · 20 docs
Floor 2Cellar, 1st, 2nd floor renovation and plumbing7p · 2 filings · 20 docs
Floor 1Cellar, 1st, 2nd floor renovation and plumbing6p · 2 filings · 20 docs
CellarCellar, 1st, 2nd floor renovation and plumbing11p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/30/2026$1.2M—127 BAY 23RD STREET REALTY LLC → Private party$817/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Farhad Bassiri-Tehrani808/28/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kale ConstructionGeneral Contractor106/27/2026
Catman PlumbingPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bassiri8394408/28/2026
Building Lifecycle
09/30/2026
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW COMBI. BOILERS IN 1ST AND 2ND FLOOR; INSTALL NEW 3-PC BATHROOM IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01385263-I1
09/16/2026
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK;REPLACE CONCRETE STAIR AT FRONT AND REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01385262-I1
08/28/2026
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW COMBI. BOILERS IN 1ST AND 2ND FLOOR; INSTALL NEW 3-PC BATHROOM IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01385263-P3
08/28/2026
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK;REPLACE CONCRETE STAIR AT FRONT AND REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01385262-P3
08/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
24 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCatman Plumbing05/07/2026
DOB NOWGeneral ConstructionSigned-offKale Construction04/23/2026
1 project · most recent 08/28/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/28/2026Signed-offCatman PlumbingGas, Storm, Water/Sanitary
1 project · most recent 05/27/2026
General Wiring
FiledStatusContractorScope
05/27/2026CompleteKJK ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/15/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/11/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
08/28/2026Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
08/28/2026Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
08/28/2026Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
06/23/2026Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
06/23/2026Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
06/23/2026Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
06/19/2026Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
06/19/2026Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
06/19/2026Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
32 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account