ECB07/29/2026OCCUPANCY CONTRARY TO THAT ALLOWED BY DEPT OF BUILDING RECORDS.NOTE ATTIC LEVEL CREATED 2 ROOMS WITH DOORS AND HARDWARE AND A 3 PIECE BATHROOM(TOILET,SHOWER,AND SINK)ATTIC LEVEL.EQUIPPED AND ARRANGED AS HABITAB$2K due
DOB12/15/2022FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
ECB02/25/20251RCNY 103-09(E)FAILURE TO FILE A RETAINING WALL CONDITION ASSESSMENT REPORT BY THE DEADLINE AS REQUIRED BY 1RCNY 103-09(E)(2)AND(5).TO DATE,THE DEPARTMENT HAS NOT RECEIVED A RETAINING WALL CONDITION ASSESSMENTNothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 3,200 sf lot · 0.61 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.