← Back
BuildNYC
Old law tenement
127 EDGECOMBE AVENUE
MANHATTAN · BIN 1091862
💬 Discuss this project
1910Year Built
5Stories
C4Building Class
R7-2Zoning
8,085 sfGross Floor Area
10Units
Rent Stabilized2 Active Violations ▸
Old law tenement · Owner of record: Bremond King Davis Housing Development F Und Co · 2,250 sf lot · 3.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSite information zoning code analysisUnder Construction17p · 1 filing · 20 docs
Floor 5Site information zoning code analysisUnder Construction14p · 1 filing · 20 docs
Floor 4Site information zoning code analysisUnder Construction14p · 1 filing · 20 docs
Floor 3Site information zoning code analysisUnder Construction14p · 1 filing · 20 docs
Floor 2Site information zoning code analysisUnder Construction13p · 1 filing · 20 docs
Floor 1Site information zoning code analysisUnder Construction19p · 2 filings · 20 docs
CellarSite information zoning code analysisUnder Construction16p · 1 filing · 20 docs
Site & exteriorHeavy duty sidewalk shed installationUnder Construction4p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Queens Housing Immigrant Center707/02/2026
Bremond King Davis Housing Development F Und Co309/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FL&M Engineering Design & Inspection210/02/2026
Rosenthal606/24/2026
Stat Architecture206/24/2026
Mje Professional Services112/16/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB Building Consulting803/21/2026
SNR Expediting Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Penta Restorationspecialty_contractor107/02/2026
MC SuperstructureScaffold109/10/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
American Construction Tes9731806/24/2026
Building Lifecycle
All (63)Filed (11)Permit Issued (2)Violation (2)Objection (18)Special Inspection (30)
10/02/2026
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, PIPE SCAFFOLD, ENGINEERED ENCLSOURE, OVERHEAD PROTECTION AND WINDOW PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01456642-P1
09/09/2026
Permit issued — Sidewalk Shed
M01456642-I1-SH
09/09/2026
Violation issued (ECB, open)
Unknown
09/09/2026
Violation issued (ECB, open)
Construction
09/08/2026
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, PIPE SCAFFOLD, ENGINEERED ENCLSOURE, OVERHEAD PROTECTION AND WINDOW PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01456642-I1
06/30/2026
Permit issued — General Construction
M01212855-I1-GC
06/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWIN HOPKINS
06/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
EDWIN HOPKINS
06/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EDWIN HOPKINS
06/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
EDWIN HOPKINS
06/30/2026
Special inspection requirement — Maintenance information
EDWIN HOPKINS
06/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWIN HOPKINS
06/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
EDWIN HOPKINS
06/30/2026
Special inspection requirement — Energy Code Compliance Inspections
EDWIN HOPKINS
06/30/2026
Special inspection requirement — Fire-Resistance Rated Construction
EDWIN HOPKINS
06/30/2026
Special inspection requirement — Final
EDWIN HOPKINS
06/30/2026
Special inspection requirement — Fenestration air leakage
EDWIN HOPKINS
06/30/2026
Special inspection requirement — Insulation placement and R values
EDWIN HOPKINS
06/30/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
EDWIN HOPKINS
06/30/2026
Special inspection requirement — Interior lighting power
EDWIN HOPKINS
06/30/2026
Special inspection requirement — Exterior lighting power
EDWIN HOPKINS
06/30/2026
Special inspection requirement — Lighting controls
EDWIN HOPKINS
06/30/2026
Special inspection requirement — Mechanical Systems
EDWIN HOPKINS
06/30/2026
Special inspection requirement — Chimneys and vents
EDWIN HOPKINS
06/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWIN HOPKINS
06/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/30/2026
Special inspection requirement — Final
EDWIN HOPKINS
06/30/2026
Special inspection requirement — Shutoff dampers
EDWIN HOPKINS
06/24/2026
Filed — Alteration
Provide ventilation for gas meter room and boiler room, all ductwork, fittings and hangers, balance air system and report as per plan, filed in conjunction with GC # M01212855-I1
M01212855-P2
06/24/2026
Filed — Alteration
Provide ventilation for gas meter room and boiler room, all ductwork, fittings and hangers, balance air system and report as per plan, filed in conjunction with GC # M01212855-I1
M01212855-P3
06/24/2026
Filed — Alteration
Provide ventilation for gas meter room and boiler room, all ductwork, fittings and hangers, balance air system and report as per plan, filed in conjunction with GC # M01212855-I1
M01212855-P4
06/24/2026
Filed — Alteration
Provide ventilation for gas meter room and boiler room, all ductwork, fittings and hangers, balance air system and report as per plan, filed in conjunction with GC # M01212855-I1
M01212855-P1
06/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWIN HOPKINS
06/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
EDWIN HOPKINS
06/24/2026
Special inspection requirement — Energy Code Compliance Inspections
EDWIN HOPKINS
06/24/2026
Special inspection requirement — Final
EDWIN HOPKINS
06/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
EDWIN HOPKINS
06/24/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
EDWIN HOPKINS
06/24/2026
Special inspection requirement — Exterior lighting power
EDWIN HOPKINS
10/21/2025
Objection resolved — Addressed
10/16/2025
Objection resolved — Addressed
10/16/2025
Objection resolved — Addressed
10/15/2025
Objection raised — Admin
10/15/2025
Objection raised — Cost
10/13/2025
Objection resolved — Addressed
10/13/2025
Objection resolved — Addressed
10/13/2025
Objection resolved — Addressed
10/06/2025
Objection resolved — Addressed
10/03/2025
Objection raised — Scope
10/03/2025
Objection raised — Scope
10/03/2025
Objection raised — Scope
09/30/2025
Filed — Alteration
Provide ventilation for gas meter room and boiler room, all ductwork, fittings and hangers, balance air system and report as per plan, filed in conjunction with GC # M01212855-I1
M01212855-S3
09/18/2025
Filed — Alteration
Provide ventilation for gas meter room and boiler room, all ductwork, fittings and hangers, balance air system and report as per plan, filed in conjunction with GC # M01212855-I1
M01212855-S2
09/12/2025
Objection resolved — Addressed
09/03/2025
Objection raised — Scope
08/20/2025
Objection resolved — Addressed
07/07/2025
Objection raised — Admin
07/07/2025
Objection raised — Scope
06/18/2025
Filed — Alteration
Provide ventilation for gas meter room and boiler room, all ductwork, fittings and hangers, balance air system and report as per plan, filed in conjunction with GC # M01212855-I1
M01212855-S1
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedMC Superstructure09/09/2026
DOB NOWGeneral ConstructionPermit IssuedPenta Restoration06/30/2026
1 project · most recent 06/24/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/24/2026——Gas, Storm, Water/Sanitary
1 project · most recent 08/25/2026
FiledStatusContractorScope
08/25/2026Permit IssuedNash Electric Services—
2 projects · most recent 10/02/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
10/02/2026Permit IssuedMC SuperstructureScaffold, Sidewalk Shed
12/16/2024Permit IssuedUnited King ConstructionSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
06/30/2026Fire-Resistant Penetrations and JointsEDWIN HOPKINSspecial
06/30/2026Tenant Protection Plan Compliance—special
06/30/2026HVAC-R and service water heating system controlsEDWIN HOPKINSenergy_progress
06/30/2026HVAC-R and service water piping design and insulationEDWIN HOPKINSenergy_progress
06/30/2026HVAC-R and service water heating equipmentEDWIN HOPKINSenergy_progress
06/30/2026Maintenance informationEDWIN HOPKINSenergy_progress
06/30/2026Fire-Resistant Penetrations and JointsEDWIN HOPKINSspecial
06/30/2026Tenant Protection Plan ComplianceEDWIN HOPKINSspecial
06/30/2026Energy Code Compliance InspectionsEDWIN HOPKINSprogress
06/30/2026Fire-Resistance Rated ConstructionEDWIN HOPKINSprogress
06/30/2026FinalEDWIN HOPKINSprogress
06/30/2026Fenestration air leakageEDWIN HOPKINSenergy_progress
06/30/2026Insulation placement and R valuesEDWIN HOPKINSenergy_progress
06/30/2026Fenestration and door U-factor and product ratingsEDWIN HOPKINSenergy_progress
06/30/2026Interior lighting powerEDWIN HOPKINSenergy_progress
06/30/2026Exterior lighting powerEDWIN HOPKINSenergy_progress
06/30/2026Lighting controlsEDWIN HOPKINSenergy_progress
06/30/2026Mechanical SystemsEDWIN HOPKINSspecial
06/30/2026Chimneys and ventsEDWIN HOPKINSspecial
06/30/2026Fire-Resistant Penetrations and JointsEDWIN HOPKINSspecial
06/30/2026Tenant Protection Plan Compliance—special
06/30/2026FinalEDWIN HOPKINSprogress
06/30/2026Shutoff dampersEDWIN HOPKINSenergy_progress
06/24/2026Fire-Resistant Penetrations and JointsEDWIN HOPKINSspecial
06/24/2026Tenant Protection Plan ComplianceEDWIN HOPKINSspecial
Latest 25 of 40.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
10/04/2026M01456642-P1Request digital key ↗
10/04/2026M01456642-I1Request digital key ↗
08/25/2026M01156474-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature11
10/04/2026M01456642-P1Open ↗
09/10/2026M01456642-I1Open ↗
08/25/2026M01156474-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/28/2026M01212855-P1Open ↗
08/28/2026M01212855-P1Open ↗
08/28/2026M01212855-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/28/2026M01212855-P1Open ↗
08/28/2026M01212855-I1Open ↗
08/28/2026M01212855-P2Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/21/2026M01212855-I1Open ↗
08/21/2026M01212855-P4Open ↗
08/21/2026M01212855-P3Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs9
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/21/2026M01212855-P4Open ↗
08/21/2026M01212855-P3Open ↗
08/21/2026M01212855-P1Open ↗
Showing 3 of 9 on file for this type