1904Year Built
7Stories
O6Building Class
M1-8A/R11Zoning
35,600 sfGross Floor Area
7Units
LL97 Covered
Office with commercial, 7-19 stories · Owner of record: THE HORNE BUILDING OWNERS CORP · 5,800 sf lot · 6.14 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction7p · 3 filings · 20 docs
Floor 7Under Construction7p · 3 filings · 20 docs
Floor 61 filing · 2 docs
Floor 56p · 3 filings · 20 docs
Floor 41 filing · 2 docs
Floor 31 filing · 2 docs
Floor 21 filing · 2 docs
Floor 11 filing · 2 docs
CellarUnder Construction9p · 1 filing · 12 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
COLLADO ENGINEERING302/24/2026
FMO ENGINEERING PC204/23/2024
PAUL PERDEK, PROF. ENG. PLLC211/16/2023
MDG DESIGN GROUP506/24/2021
ALNOUR CONSULTING105/19/2020
MCRB SERVICE CORP101/25/2018
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KATZ ARCHITECTURE1371402/24/2026
MEP INSPECTIONS, INC1102101/14/2026
FMO ENGINEERING PC1798204/23/2024
SEAD ENGINEERING PC2665506/24/2021
ALNOUR CONSULTING ENGINEE607105/19/2020
Building Lifecycle
All (19)Filed (14)Signed Off (5)
02/24/2026
Filed — Alteration
Removal of one roof tank. Installation of new sprinkler service, backflow preventer assembly, floor drain, sprinkler booster pump, and riser control valve. Installation of new test tee on domestic water service. No change to egress use or occupancy
M01099103-S1
01/14/2026
Filed — Alteration
Removal of one roof tank. Installation of new sprinkler service, backflow preventer assembly, floor drain, sprinkler booster pump, and riser control valve. Installation of new test tee on domestic water service. No change to egress use or occupancy
M01099103-I1
10/02/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00958052-I1
07/08/2024
Signed off — Alteration
M00950650-I1
04/23/2024
Filed — Alteration
STRUCTURAL REINFORCEMENT OF THE ROOF FRAMING
M00972104-P1
12/20/2023
Filed — Alteration
M00950650-I1
12/12/2023
Filed — Alteration
STRUCTURAL REINFORCEMENT OF THE ROOF FRAMING
M00972104-I1
11/16/2023
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00958055-I1
11/07/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00958052-I1
11/29/2021
Signed off — Alteration
HEREWITH FILE TO RENOVATE EXIST. OFFICE SPACE INCLUDES REPLACE/RELOCATE PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00334702-I1
07/21/2021
Signed off — Alteration
HEREWITH FILE TO INSTALL MINI-SPLIT TYPE HVAC UNIT WITH NEW STEEL DUNNAGE FOR 5TH FLOOR OFFICE SPACE. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00473511-I1
06/24/2021
Filed — Alteration
HEREWITH FILE TO INSTALL MINI-SPLIT TYPE HVAC UNIT WITH NEW STEEL DUNNAGE FOR 5TH FLOOR OFFICE SPACE. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00473511-P1
02/19/2021
Filed — Alteration
HEREWITH FILE TO INSTALL MINI-SPLIT TYPE HVAC UNIT WITH NEW STEEL DUNNAGE FOR 5TH FLOOR OFFICE SPACE. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00473511-I1
01/29/2021
Filed — Alteration
HEREWITH FILE TO RENOVATE EXIST. OFFICE SPACE INCLUDES REPLACE/RELOCATE PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00334702-P2
11/23/2020
Filed — Alteration
HEREWITH FILE TO RENOVATE EXIST. OFFICE SPACE INCLUDES REPLACE/RELOCATE PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00334702-P1
05/19/2020
Filed — Alteration
REPLACE EXISTING ROOF SLAB OVER UNDERSIDE SIDEWALK VAULT, REPLACE SIDEWALK SLAB ON GRADE. NO CHANGE TO USE, EGRESS OR OCCUPANCY AS PER PLAN.
M00310073-I1
03/19/2020
Filed — Alteration
HEREWITH FILE TO RENOVATE EXIST. OFFICE SPACE INCLUDES REPLACE/RELOCATE PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00334702-I1
07/23/2019
Signed off — Alteration
M00013902-I1
01/25/2018
Filed — Alteration
M00013902-I1
Nothing on file for this building.
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
10/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
02/24/2026Fire-Resistant Penetrations and JointsDavid Katzspecial
02/24/2026Fire-Resistance Rated ConstructionDavid Katzprogress
02/24/2026Energy Code Compliance InspectionsDavid Katzprogress
02/17/2026FinalDavid Katzprogress
04/18/2024FinalFRANCESCO MOprogress
04/18/2024Structural Wood FrameFRANCESCO MOprogress
04/18/2024Structural Steel - High Strength BoltingFRANCESCO MOspecial
04/18/2024Structural Steel - WeldingFRANCESCO MOspecial
04/18/2024MasonryFRANCESCO MOspecial
04/18/2024Structural Stability – Alterations of existing buildingsFRANCESCO MOspecial
04/18/2024Structural Steel - DetailsFRANCESCO MOspecial
04/18/2024Wood – Seismic ResistanceDavid Katzspecial
12/19/2023Fire-Resistance Rated ConstructionDavid Katzprogress
10/20/2023Structural Stability – Alterations of existing buildingsDavid Katzspecial
10/20/2023MasonryDavid Katzspecial
10/19/2023FinalDavid Katzprogress
02/08/2021Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
01/28/2021Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
05/12/2020Structural Steel - High Strength BoltingNouredine Benabdelhakspecial
05/12/2020Structural Steel - WeldingNouredine Benabdelhakspecial
03/03/2020Structural Stability – Alterations of existing buildings—special
02/05/2020Final—progress
01/24/2018FinalASMA CAMELIAprogress
Nothing on file for this building.