← Back
Primarily 2 family with 1 store or office
1270 NOSTRAND AVENUE
BROOKLYN · BIN 3116062
💬 Discuss this project
1930Year Built
3Stories
S2Building Class
R6Zoning
3,300 sfGross Floor Area
3Units
Rent Stabilized8 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 1270 NOSTRAND AVE LLC · 1,560 sf lot · 2.12 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof2p · 2 filings · 20 docs
Floor 32p · 2 filings · 20 docs
Floor 25p · 3 filings · 20 docs
Floor 14p · 2 filings · 20 docs
Cellar4p · 2 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NORTHBRIDGE CONTRACTING1507/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/01/2019$725K—— → —$220/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AYALA ENGINEERING PC502/11/2025
SUNG HO SHIN ARCHITECT, PC503/11/2024
JIAN ENGINEERING PLLC110/15/2022
BOLT ARCHITECTURE, PLLC108/03/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BOYD CONSULTING203/21/2026
YBL NY1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NORTHBRIDGE CONTRACTING LGeneral Contractor507/08/2026
M. INT'L ENGINEERING PLLCGeneral Contractor107/08/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
TESTERMAN PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AYALA ENGINEERING P.C.9207502/11/2025
JIAN ENGINEERING PLLC7397503/11/2024
BOLTARCHITECTURE,PLLC6712108/03/2021
Building Lifecycle
All (105)Filed (12)Permit Issued (6)Signed Off (4)Violation (42)Inspection (11)Special Inspection (30)
04/16/2026
Signed off — Alteration
JOB FILED INTERIOR RENOVATION OF COMMERCIAL STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW FLOOR TILE AND NEW PAINT, NEW KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01052805-S1
01/28/2026
Violation issued (FDNY_NOV, closed)
11/17/2025
Violation issued (FDNY_ORDER, closed)
11/17/2025
Violation issued (FDNY_ORDER, closed)
11/17/2025
Violation issued (FDNY_ORDER, closed)
11/17/2025
Violation issued (FDNY_ORDER, closed)
06/13/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/10/2025
Signed off — Alteration
JOB FILED INTERIOR RENOVATION OF COMMERCIAL STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW FLOOR TILE AND NEW PAINT, NEW KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01052805-I1
03/07/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/27/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/13/2025
Special inspection requirement — Fenestration areas
Pablo Ayala
02/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Pablo Ayala
02/13/2025
Special inspection requirement — Mechanical Systems
Pablo Ayala
02/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Pablo Ayala
02/13/2025
Special inspection requirement — Fire-Resistance Rated Construction
Pablo Ayala
02/13/2025
Special inspection requirement — Final
Pablo Ayala
02/13/2025
Special inspection requirement — Fenestration air leakage
Pablo Ayala
02/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Pablo Ayala
02/13/2025
Special inspection requirement — Air barrier - visual inspection
Pablo Ayala
02/13/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Pablo Ayala
02/12/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/11/2025
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF COMMERCIAL STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW FLOOR TILE AND NEW PAINT, NEW KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01052805-P3
02/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Pablo Ayala
02/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Pablo Ayala
02/11/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Pablo Ayala
02/11/2025
Special inspection requirement — Fenestration areas
Pablo Ayala
02/11/2025
Special inspection requirement — Air barrier - visual inspection
Pablo Ayala
02/11/2025
Special inspection requirement — Fenestration air leakage
Pablo Ayala
02/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
Pablo Ayala
02/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Pablo Ayala
02/11/2025
Special inspection requirement — Mechanical Systems
Pablo Ayala
02/11/2025
Special inspection requirement — Final
Pablo Ayala
01/30/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Pablo Ayala
01/27/2025
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF COMMERCIAL STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW FLOOR TILE AND NEW PAINT, NEW KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01052805-P1
01/27/2025
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF COMMERCIAL STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW FLOOR TILE AND NEW PAINT, NEW KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01052805-P2
01/27/2025
Special inspection requirement — Energy Code Compliance Inspections
Pablo Ayala
01/27/2025
Special inspection requirement — Mechanical Systems
Pablo Ayala
01/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Pablo Ayala
01/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Pablo Ayala
01/27/2025
Special inspection requirement — Air barrier - visual inspection
Pablo Ayala
01/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Pablo Ayala
01/27/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Pablo Ayala
01/27/2025
Special inspection requirement — Fenestration air leakage
Pablo Ayala
01/27/2025
Special inspection requirement — Fenestration areas
Pablo Ayala
01/07/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/28/2024
Signed off — Alteration
B08038333-I1
06/27/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/26/2024
Permit issued — Plumbing
B01052805-S1-PL
06/20/2024
Permit issued — General Construction
B01007028-I1-GC-CX
06/14/2024
Signed off — Alteration
THIS APPLICATION WILL BE SUPERSEDED ALT-2 JOB#B00293747. INTERIOR RENOVATION OF EXIST'G MIXED-USE BUILDING EXCEPT FOR COMMERCIAL SPACE 001. NO CHANGE IN USE, OCCUPANCY, OR EGRESS IS INVOLVED UNDER THIS APPLICATION
B08049407-I1
06/06/2024
Permit issued — Mechanical Systems
B01052805-I1-GC-CX
05/17/2024
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF COMMERCIAL STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW FLOOR TILE AND NEW PAINT, NEW KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01052805-S1
05/17/2024
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF COMMERCIAL STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW FLOOR TILE AND NEW PAINT, NEW KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01052805-I1
03/22/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/11/2024
Filed — Alteration
THIS APPLICATION WILL BE SUPERSEDED ALT-2 JOB#B00293747. INTERIOR RENOVATION OF EXIST'G MIXED-USE BUILDING EXCEPT FOR COMMERCIAL SPACE 001. NO CHANGE IN USE, OCCUPANCY, OR EGRESS IS INVOLVED UNDER THIS APPLICATION
B08049407-P2
03/08/2024
Filed — Alteration
B01007028-I1
Latest 60 of 105 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC06/26/2024
DOB NOWGeneral ConstructionPermit IssuedNORTHBRIDGE CONTRACTING L06/20/2024
DOB NOWMechanical SystemsSigned-offM. INT'L ENGINEERING PLLC06/06/2024
DOB NOWPlumbingSigned-offTESTERMAN PLBG & HTG INC02/08/2024
DOB NOWGeneral ConstructionSigned-offNORTHBRIDGE CONTRACTING L12/04/2023
DOB NOWGeneral ConstructionSigned-offNORTHBRIDGE CONTRACTING L02/08/2023
BISOTISSUEDG. PARRIS & COMPANY CONST11/04/2021
BISPLISSUEDGOODWILL PLUMBING AND HEATING06/29/1995
BISMHISSUEDBERGEN FUEL OIL03/30/1995
2 projects · most recent 07/07/2025
General Wiring
FiledStatusContractorScope
07/07/2025CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
06/06/2024CompleteNELSON & TOM MAINT INC DBGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
06/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/07/2025Pass-Final General Construction Non-Directive 14PassView ↗
02/27/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/12/2025Fail-Final General Construction Non-Directive 14FailView ↗
01/30/2025Fail-Final General Construction Non-Directive 14FailView ↗
01/07/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/07/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/27/2024Pass-Final General Construction Non-Directive 14PassView ↗
03/22/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/22/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
02/13/2025Fenestration areasPablo Ayalaenergy_progress
02/13/2025Fire-Resistant Penetrations and JointsPablo Ayalaspecial
02/13/2025Mechanical SystemsPablo Ayalaspecial
02/13/2025Energy Code Compliance InspectionsPablo Ayalaprogress
02/13/2025Fire-Resistance Rated ConstructionPablo Ayalaprogress
02/13/2025FinalPablo Ayalaprogress
02/13/2025Fenestration air leakagePablo Ayalaenergy_progress
02/13/2025HVAC-R and service water piping design and insulationPablo Ayalaenergy_progress
02/13/2025Air barrier - visual inspectionPablo Ayalaenergy_progress
02/13/2025Fenestration and door U-factor and product ratingsPablo Ayalaenergy_progress
02/11/2025Energy Code Compliance InspectionsPablo Ayalaprogress
02/11/2025HVAC-R and service water piping design and insulationPablo Ayalaenergy_progress
02/11/2025Fenestration and door U-factor and product ratingsPablo Ayalaenergy_progress
02/11/2025Fenestration areasPablo Ayalaenergy_progress
02/11/2025Air barrier - visual inspectionPablo Ayalaenergy_progress
02/11/2025Fenestration air leakagePablo Ayalaenergy_progress
02/11/2025Fire-Resistance Rated ConstructionPablo Ayalaprogress
02/11/2025Fire-Resistant Penetrations and JointsPablo Ayalaspecial
02/11/2025Mechanical SystemsPablo Ayalaspecial
02/11/2025FinalPablo Ayalaprogress
01/28/2025Fire-Resistant Penetrations and JointsPablo Ayalaspecial
01/27/2025Energy Code Compliance InspectionsPablo Ayalaprogress
01/27/2025Mechanical SystemsPablo Ayalaspecial
01/27/2025Fire-Resistant Penetrations and JointsPablo Ayalaspecial
01/27/2025Fire-Resistant Penetrations and JointsPablo Ayalaspecial
Latest 25 of 52.
▾Documents — 82 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch11
08/28/2026B08020067-I1Request digital key ↗
08/28/2026B08038333-I1Request digital key ↗
08/25/2026B08049407-P2Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/01/2026B00293747-I1Request digital key ↗
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
11/05/2021321922274Open ↗
06/07/2021321922274Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
03/11/2020321922274Open ↗
▸Seals & Professional Certifications47
▸DOB NOWProgress Inspector Seal & Signature16
09/02/2026B08038333-I1Open ↗
09/02/2026B08038333-I1Open ↗
09/02/2026B08038333-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/02/2026B08038333-I1Open ↗
09/02/2026B08038333-I1Open ↗
09/01/2026B01052805-S1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/28/2026B08038333-I1Open ↗
08/25/2026B08049407-P1Open ↗
08/25/2026B08049407-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
03/11/2020321922274Open ↗
03/11/2020321922274Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/11/2020321922274Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/11/2020321922274Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
03/11/2020321922274Open ↗
▸BISTenant Protection Plan and Notes1
03/11/2020321922274Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/28/2026B08038333-I1Open ↗
08/25/2026B08049407-I1Open ↗
08/25/2026B01007028-I1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/11/2020321922274Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/11/2020321922274Open ↗
03/11/2020321922274Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
03/11/2020321922274Open ↗
▸Filing & Intake Forms2
▸BISBOROUGH INTAKE FORM1
05/21/2020321922274Open ↗
▸BISEFILING COVER SHEET1
03/09/2020321922274Open ↗
▸Other Documents1
▸DOB NOWWaiver Document1
08/13/2026B08038333-I1Open ↗