← Back
Three families
1271 TABOR COURT
BROOKLYN · BIN 3141588
💬 Discuss this project
1930Year Built
2Stories
C0Building Class
R5BZoning
2,988 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Three families · 1,958 sf lot · 1.53 FAR built · Flood zone X
Locations of Work
Architecture
Basement1p · 1 filing · 6 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/09/2025$1.6M—— → —$552/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MW PROFESSIONAL ENGINEERING, P.C.504/17/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRK CREATIVE603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GENESIS NYC CONSTRUCTIONGeneral Contractor303/21/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MW PROFESSIONAL ENGINEERI570504/17/2026
Building Lifecycle
All (32)Filed (5)Permit Issued (2)Signed Off (2)Violation (9)Inspection (4)Special Inspection (10)
05/26/2026
Signed off — Alteration
FILING THIS APPLICATION RELOCATE & REPLACE PLUMBING FIXTURES AND INSTALL NEW PLUMBING FIXTURES FOR EXISTING 3 FAMILY DWELLING UNITS,ON BASEMENT,1ST,2ND FL,GENERAL CONSTRUCTION FILING SEPARATE APPLICATION ,NO CHANGE IN MEANS OF USE,EGRESS OR OCCUPANCY
B01302045-I1
05/26/2026
Signed off — Alteration
INTERIOR RENOVATION FOR EXISTING 3 FAMILY DWELLING BUILDING. NEW PARTITION WALL ON BASEMENT,1ST FL,2ND FL.AND PLUMBING WORK FILING SEPARATE APPLICATION ,NO CHANGE IN MEANS OF USE,EGRESS OR OCCUPANCY
B01302037-I1
05/06/2026
Violation issued (HPD, open)
A
04/21/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
MING WAI WONG
04/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MING WAI WONG
04/20/2026
Special inspection requirement — Energy Code Compliance Inspections
MING WAI WONG
04/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MING WAI WONG
04/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
MING WAI WONG
04/17/2026
Filed — Alteration
FILING THIS APPLICATION RELOCATE & REPLACE PLUMBING FIXTURES AND INSTALL NEW PLUMBING FIXTURES FOR EXISTING 3 FAMILY DWELLING UNITS,ON BASEMENT,1ST,2ND FL,GENERAL CONSTRUCTION FILING SEPARATE APPLICATION ,NO CHANGE IN MEANS OF USE,EGRESS OR OCCUPANCY
B01302045-P2
04/13/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/25/2026
Filed — Alteration
INTERIOR RENOVATION FOR EXISTING 3 FAMILY DWELLING BUILDING. NEW PARTITION WALL ON BASEMENT,1ST FL,2ND FL.AND PLUMBING WORK FILING SEPARATE APPLICATION ,NO CHANGE IN MEANS OF USE,EGRESS OR OCCUPANCY
B01302037-P1
01/06/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/02/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/22/2025
Filed — Alteration
FILING THIS APPLICATION RELOCATE & REPLACE PLUMBING FIXTURES AND INSTALL NEW PLUMBING FIXTURES FOR EXISTING 3 FAMILY DWELLING UNITS,ON BASEMENT,1ST,2ND FL,GENERAL CONSTRUCTION FILING SEPARATE APPLICATION ,NO CHANGE IN MEANS OF USE,EGRESS OR OCCUPANCY
B01302045-P1
12/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MING WAI WONG
12/15/2025
Special inspection requirement — Energy Code Compliance Inspections
MING WAI WONG
12/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
MING WAI WONG
12/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MING WAI WONG
12/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
MING WAI WONG
10/30/2025
Permit issued — Plumbing
B01302045-I1-PL
10/23/2025
Permit issued — Structural
B01302037-I1-GC-CX
10/18/2025
Filed — Alteration
FILING THIS APPLICATION RELOCATE & REPLACE PLUMBING FIXTURES AND INSTALL NEW PLUMBING FIXTURES FOR EXISTING 3 FAMILY DWELLING UNITS,ON BASEMENT,1ST,2ND FL,GENERAL CONSTRUCTION FILING SEPARATE APPLICATION ,NO CHANGE IN MEANS OF USE,EGRESS OR OCCUPANCY
B01302045-I1
10/17/2025
Filed — Alteration
INTERIOR RENOVATION FOR EXISTING 3 FAMILY DWELLING BUILDING. NEW PARTITION WALL ON BASEMENT,1ST FL,2ND FL.AND PLUMBING WORK FILING SEPARATE APPLICATION ,NO CHANGE IN MEANS OF USE,EGRESS OR OCCUPANCY
B01302037-I1
06/11/2025
Violation issued (HPD, closed)
A
11/27/2024
Violation issued (HPD, closed)
I
04/12/2024
Violation issued (HPD, closed)
A
11/21/2023
Violation issued (HPD, closed)
I
03/27/2023
Violation issued (HPD, closed)
A
11/09/2022
Violation issued (HPD, closed)
I
03/02/2022
Violation issued (HPD, closed)
A
04/13/2021
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC10/30/2025
DOB NOWStructuralSigned-offGENESIS NYC CONSTRUCTION10/23/2025
1 project · most recent 11/12/2025
General Wiring
FiledStatusContractorScope
11/12/2025Permit IssuedJ Y ELECTRIC INCGeneral Wiring
1 project · most recent 03/25/2026
Concrete Wood
FiledStatusContractorScope
03/25/2026Signed-offGENESIS NYC CONSTRUCTIONConcrete, Wood
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/21/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/13/2026Fail-Final General Construction Non-Directive 14FailView ↗
01/06/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/02/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
04/20/2026HVAC-R and service water heating system controlsMING WAI WONGenergy_progress
04/20/2026Fire-Resistant Penetrations and JointsMING WAI WONGspecial
04/20/2026Energy Code Compliance InspectionsMING WAI WONGprogress
04/20/2026HVAC-R and service water piping design and insulationMING WAI WONGenergy_progress
04/20/2026HVAC-R and service water heating equipmentMING WAI WONGenergy_progress
12/15/2025Fire-Resistant Penetrations and JointsMING WAI WONGspecial
12/15/2025Energy Code Compliance InspectionsMING WAI WONGprogress
12/15/2025HVAC-R and service water heating equipmentMING WAI WONGenergy_progress
12/15/2025HVAC-R and service water piping design and insulationMING WAI WONGenergy_progress
12/15/2025HVAC-R and service water heating system controlsMING WAI WONGenergy_progress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/17/2026B01302037-P1Request digital key ↗
08/17/2026B01302037-I1Request digital key ↗
08/17/2026B01302045-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026B01302037-P1Open ↗
08/17/2026B01302037-I1Open ↗
08/17/2026B01302045-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026B01302045-I1Open ↗
09/02/2026B01302045-I1Open ↗
08/25/2026B01302045-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026B01302045-I1Open ↗
08/25/2026B01302045-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/17/2026B01302037-P1Open ↗
08/17/2026B01302037-I1Open ↗
08/17/2026B01302045-I1Open ↗
Showing 3 of 5 on file for this type