← Back
BuildNYC
Three families
1271 TABOR COURT
BROOKLYN · Borough Park · BIN 3141588
💬 Discuss this project
1930Year Built
2Stories
C0Building Class
R5BZoning
2,988 sfGross Floor Area
3Units
Rent Stabilized2 Active Violations ▸FDNY Report ↗
Three families · 1,958 sf lot · 1.53 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Plumbing fixture relocation and replacement8p · 2 filings · 20 docs
Floor 1Unit 1IC28p · 2 filings · 20 docs
Basement1p · 1 filing · 6 docs
Sub-BasementPlumbing fixture relocation and replacement8p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/09/2025$1.6M—THOMAS AND JOANNE L. TORMEY TRUST → Private party$552/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MW Professional Engineering504/17/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRK Creative603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Genesis NYC ConstructionGeneral Contractor303/21/2026
Catman PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MW Professional Engineering570504/17/2026
Building Lifecycle
05/26/2026
Signed off — Alteration
FILING THIS APPLICATION RELOCATE & REPLACE PLUMBING FIXTURES AND INSTALL NEW PLUMBING FIXTURES FOR EXISTING 3 FAMILY DWELLING UNITS,ON BASEMENT,1ST,2ND FL,GENERAL CONSTRUCTION FILING SEPARATE APPLICATION ,NO CHANGE IN MEANS OF USE,EGRESS OR OCCUPANCY
B01302045-I1
05/26/2026
Signed off — Alteration
INTERIOR RENOVATION FOR EXISTING 3 FAMILY DWELLING BUILDING. NEW PARTITION WALL ON BASEMENT,1ST FL,2ND FL.AND PLUMBING WORK FILING SEPARATE APPLICATION ,NO CHANGE IN MEANS OF USE,EGRESS OR OCCUPANCY
B01302037-I1
05/06/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
04/21/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MING WAI WONG
32 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCatman Plumbing10/30/2025
DOB NOWGeneral ConstructionSigned-offGenesis NYC Construction10/23/2025
1 project · most recent 11/12/2025
General Wiring
FiledStatusContractorScope
11/12/2025Permit IssuedJ Y ElectricGeneral Wiring
1 project · most recent 03/25/2026
Concrete Wood
FiledStatusContractorScope
03/25/2026Signed-offGenesis NYC ConstructionConcrete, Wood
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/21/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/13/2026Fail-Final General Construction Non-Directive 14FailView ↗
01/06/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/02/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
04/20/2026Fire-Resistant Penetrations and JointsMING WAI WONGspecial
04/20/2026Energy Code Compliance InspectionsMING WAI WONGprogress
04/20/2026HVAC-R and service water piping design and insulationMING WAI WONGenergy_progress
04/20/2026HVAC-R and service water heating equipmentMING WAI WONGenergy_progress
04/20/2026HVAC-R and service water heating system controlsMING WAI WONGenergy_progress
12/15/2025Fire-Resistant Penetrations and JointsMING WAI WONGspecial
12/15/2025Energy Code Compliance InspectionsMING WAI WONGprogress
12/15/2025HVAC-R and service water heating equipmentMING WAI WONGenergy_progress
12/15/2025HVAC-R and service water piping design and insulationMING WAI WONGenergy_progress
12/15/2025HVAC-R and service water heating system controlsMING WAI WONGenergy_progress
21 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account