← Back
BuildNYC
Elevator apt, fireproof without stores
Starrett City
1275 DELMAR LOOP · BIN 3343586
💬 Discuss this project
1970Year Built
20Stories
D3Building Class
R5Zoning
1,688,760 sfGross Floor Area
2,926Units
LL97 CoveredRent Stabilized22 Active Violations 18 unresolved · 4 paperwork only 2 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: BSC Housing Company · 1,073,857 sf lot · 1.57 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Bsc Housing Company, INC3p · 1 filing · 4 docs
Site & exteriorBsc Housing Company, INC11p · 2 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Greandier Realty603/21/2026
BSC Owner203/21/2026
Starrett City103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
New York & Company110/21/2024
Paul Perdek, Prof. Engineering104/22/2022
Tiffani Lee Simple103/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company203/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Pna ContractingGeneral Contractor203/21/2026
RPJ ElectricElectrical103/21/2026
Spieler & Ricca Electrical CoElectrical103/21/2026
Proto Enterprise GroupScaffold107/08/2026
Advanced Plumbing MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New York Engineering Associates851110/21/2024
Simple Design Studio-Architects7915103/18/2022
Building Lifecycle
All (91)Filed (3)Permit Issued (3)Signed Off (3)Facade (FISP) (12)Violation (60)Inspection (2)Objection (2)Special Inspection (6)
01/30/2025
Signed off — Alteration
REGISTER GAS DRYERS (BUILDING NO. D3).
B01094871-I1
01/27/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/23/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/07/2025
Violation issued (HPD, closed)
C
01/04/2025
Violation issued (HPD, closed)
C
01/04/2025
Violation issued (HPD, closed)
C
01/02/2025
Permit issued — Plumbing
B01094871-I1-PL
10/21/2024
Filed — Alteration
REGISTER GAS DRYERS (BUILDING NO. D3).
B01094871-I1
08/12/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
06/06/2023
Cycle 9 facade report signed — SAFE
02/20/2023
Cycle 9 facade report submitted
01/13/2023
Cycle 9 facade inspection completed
01/06/2023
Signed off — Alteration
EXTERIOR FACADE RESTORATION INCLUDING MASONRY REPLACEMENT, MORTAR JOINT REPLACEMENT, SEALANT REPLACEMENT, WINDOW SILL REPLACEMENT AND CONCRETE SLAB EDGE PATCHING.
B00693558-I1
11/05/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00716739-I1
11/01/2022
Violation issued (FDNY_NOV, closed)
07/30/2022
Violation issued (ECB, closed)
Construction
07/30/2022
Violation issued (ECB, closed)
Construction
07/30/2022
Violation issued (ECB, closed)
Construction
07/23/2022
Permit issued — Sidewalk Shed
B00716739-I1-SH
07/13/2022
Permit issued — General Construction
B00693558-I1-GC
06/22/2022
Violation issued (HPD, closed)
A
06/22/2022
Violation issued (HPD, closed)
C
06/07/2022
Violation issued (HPD, closed)
C
04/22/2022
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00716739-I1
04/11/2022
Special inspection requirement — Final
Paul Perdek
03/22/2022
Objection raised — Admin
03/22/2022
Objection resolved — Addressed
03/18/2022
Filed — Alteration
EXTERIOR FACADE RESTORATION INCLUDING MASONRY REPLACEMENT, MORTAR JOINT REPLACEMENT, SEALANT REPLACEMENT, WINDOW SILL REPLACEMENT AND CONCRETE SLAB EDGE PATCHING.
B00693558-I1
03/18/2022
Special inspection requirement — Air barrier - visual inspection
Tiffani Simple
03/07/2022
Special inspection requirement — Masonry
Tiffani Simple
03/07/2022
Special inspection requirement — Post-installed Anchors
Tiffani Simple
03/07/2022
Special inspection requirement — Final
Tiffani Simple
06/17/2021
Violation issued (HPD, closed)
B
06/17/2021
Violation issued (HPD, closed)
B
06/03/2021
Violation issued (HPD, closed)
C
04/08/2021
Violation issued (ECB, closed)
Elevators
04/08/2021
Violation issued (ECB, closed)
Elevators
04/08/2021
Violation issued (ECB, open)
Construction
11/18/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/15/2020
Violation issued (HPD, closed)
C
07/29/2020
Violation issued (ECB, closed)
Elevators
07/16/2020
Violation issued (ECB, closed)
Elevators
06/05/2020
Violation issued (HPD, closed)
A
01/21/2020
Violation issued (HPD, closed)
B
01/21/2020
Violation issued (HPD, closed)
C
10/25/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/25/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/05/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/05/2018
Violation issued (HPD, closed)
B
12/05/2018
Violation issued (HPD, closed)
B
11/16/2018
Violation issued (HPD, closed)
B
11/14/2018
Violation issued (HPD, closed)
A
11/14/2018
Violation issued (HPD, closed)
A
11/14/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/05/2018
Cycle 8 facade report signed — SAFE
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/24/2018
Cycle 8 facade inspection completed
10/20/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/29/2017
Violation issued (ECB, closed)
Construction
05/18/2017
Violation issued (HPD, closed)
C
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAdvanced Plumbing Mechanical01/02/2025
DOB NOWSidewalk ShedSigned-offProto Enterprise Group07/23/2022
DOB NOWGeneral ConstructionSigned-offPna Contracting07/13/2022
BISEQISSUEDRock Scaffolding02/16/2012
BISOTISSUEDAllstate Restoration01/10/2012
BISOTISSUEDPretee Constsruction Co01/10/2005
BISOTISSUEDNJK Contracting10/10/2001
BISSPISSUEDP R Plumbing & Heating10/11/1991
BIS—ISSUEDWerner Krebs07/25/1991
1 project · most recent 04/22/2022
FiledStatusContractorScope
04/22/2022CompleteHigh Quality Electric of—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/27/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/12/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
04/11/2022FinalPaul Perdekprogress
03/18/2022Air barrier - visual inspectionTiffani Simpleenergy_progress
03/07/2022MasonryTiffani Simplespecial
03/07/2022Post-installed AnchorsTiffani Simplespecial
03/07/2022FinalTiffani Simpleprogress
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/29/2026B00716739-I1Request digital key ↗
08/23/2026B01094871-I1Request digital key ↗
08/15/2026B00693558-I1Request digital key ↗
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
02/21/2012320431136Open ↗
01/10/2012320344686Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
02/21/2012320431136Open ↗
▸Seals & Professional Certifications16
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION5
05/09/2014320431136Open ↗
03/23/2012320344686Open ↗
01/10/2012320344686Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B00693558-I1Open ↗
09/01/2026B00693558-I1Open ↗
08/28/2026B01094871-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026B00716739-I1Open ↗
09/01/2026B00693558-I1Open ↗
09/01/2026B00693558-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/23/2026B01094871-I1Open ↗
08/13/2026B00716739-I1Open ↗
08/13/2026B00693558-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/21/2012320431136Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/21/2012320431136Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00693558-I1Open ↗
▸Energy Compliance2
▸BISTR8: Energy Code Progress Inspections1
12/16/2011320344686Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00693558-I1Open ↗
▸Approvals, Objections & Sign-offs9
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
03/23/2012320344686Open ↗
03/21/2012320344686Open ↗
05/09/2014320431136Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/13/2026B01094871-I1Open ↗
08/13/2026B00693558-I1Open ↗
08/13/2026B00716739-I1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
05/09/2014320431136Open ↗
12/16/2011320344686Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
02/21/2012320431136Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
03/21/2012320344686Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
02/21/2012320431136Open ↗