← Back
One story retail building
1276 EAST 222 STREET
BRONX · Eastchester-Edenwald-Baychester · BIN 2130793
💬 Discuss this project
2004Year Built
1Stories
K1Building Class
C8-1Zoning
10,495 sfGross Floor Area
1Units
0 Open Violations
One story retail building · Owner of record: LA VENTELLA REALTY LLC · 22,155 sf lot · 0.47 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionLandscapeCivilGeneral
Roof24p · 3 filings · 20 docs
Floor 313p · 4 filings · 20 docs
Floor 213p · 4 filings · 20 docs
Floor 113p · 6 filings · 20 docs
Cellar13p · 5 filings · 20 docs
Site & exterior1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RND 2223907/08/2026
EVAN CONSTRUCTION604/09/2026
1278 EAST 222ST LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY BUILDING ASSOCIATES INC107/01/2025
M.S. SAVANI ARCHITECT, PC1303/03/2025
LMW ENGINEERING GROUP LLC507/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCASTLE2203/21/2026
S R SOLAR DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EVAN CONSTURCTION CORPGeneral Contractor1607/08/2026
YAFE MEOD CORPGeneral Contractor207/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
ANDRINO CONTRACTING LLCGeneral Contractor104/09/2026
ARGON ELECTRICAL CORPElectrical103/22/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244107/01/2025
HRF SERVICES CORP5616503/03/2025
REGIONAL TESTING CORP.394903/03/2025
Building Lifecycle
All (164)Filed (19)Permit Issued (18)Signed Off (9)Violation (1)Inspection (15)Objection (72)Special Inspection (30)
11/28/2025
Signed off — Alteration
HEREWITH TO PROPOSE 9 LINEAR FEET CURB CUT.
X00663501-I1
11/25/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/05/2025
Signed off — Alteration
INSTALLATION OF PLUMBING SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH NEW BUILDING APPLICATION# X00620397. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00679512-I1
10/20/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
09/15/2025
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
X01246877-I1
08/21/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/21/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/15/2025
Signed off — Alteration
HEREWITH FILING FOR HYDRAULICALLY CALCULATED SPRINKLER SYSTEM THROUGH-OUT BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS # X00620397.
X00745752-I1
08/14/2025
Signed off — Alteration
X01003690-I1
08/07/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
08/07/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/31/2025
Signed off — Alteration
HEREWITH TO PROPOSE REINFORCE CONCRETE FOOTING AND FOUNDATION WALL..
X00662068-I1
07/30/2025
Permit issued — Curb Cut
X01003690-I1-CC
07/30/2025
Permit issued — Curb Cut
X00663501-I1-CC
07/29/2025
Signed off — Alteration
HEREWITH TO PROPOSE TEMPORARY 8' HIGH WOOD CONSTRUCTION FENCE. NO CHANGES IN OCCUPANCY, USE, GROUP OR EGRESS UNDER THIS APPLICATION.
X00672999-I1
07/29/2025
Signed off — Alteration
HEREWITH TO PROPOSE SUPPORT OF EXCAVATION FOR A NEW 3 STORY BUILDING.
X00663409-I1
07/25/2025
Permit issued — Solar
X01246877-I1-SL
07/23/2025
Signed off — Alteration
HEREWITH TO PROPOSE STRUCTURAL WORK FOR A 3 STORY NEW BUILDING.
X00662946-I1
07/09/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/07/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/01/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
X01246877-I1
06/25/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
06/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
06/25/2025
Special inspection requirement — Final
NARESH MAHANGU
06/25/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
06/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
06/13/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/27/2025
Permit issued — Mechanical Systems
X00620397-I1-MS
05/16/2025
Permit issued — Sprinklers
X00745752-I1-EW-SP
03/06/2025
Special inspection requirement — Permanent certificate
Paul Raymond
03/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
MARYAM RAKSHAN
03/06/2025
Special inspection requirement — Mechanical Systems
Paul Raymond
03/06/2025
Special inspection requirement — Metering
Paul Raymond
03/06/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
03/06/2025
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
03/06/2025
Special inspection requirement — Air barrier — testing
Paul Raymond
03/06/2025
Special inspection requirement — Final
Paul Raymond
03/06/2025
Special inspection requirement — Maintenance information
Paul Raymond
03/06/2025
Special inspection requirement — Heating Systems
Paul Raymond
03/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MARYAM RAKSHAN
03/06/2025
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
03/06/2025
Special inspection requirement — Fenestration areas
Paul Raymond
03/06/2025
Special inspection requirement — Insulation placement and R values
Paul Raymond
03/06/2025
Special inspection requirement — Protection of exposed foundation insulation
Paul Raymond
03/06/2025
Special inspection requirement — Fenestration air leakage
Paul Raymond
03/06/2025
Special inspection requirement — Electric vehicle service equipment requirements
Paul Raymond
03/06/2025
Special inspection requirement — Interior lighting power
Paul Raymond
03/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
MARYAM RAKSHAN
03/06/2025
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
03/06/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Paul Raymond
03/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
03/06/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Paul Raymond
03/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
03/05/2025
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
03/03/2025
Filed — New Building
HEREWITH TO PROPOSE 3 STORY BUILDING WITH 3 FAMILY.
X00620397-P3
03/03/2025
Filed — Alteration
INSTALLATION OF PLUMBING SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH NEW BUILDING APPLICATION# X00620397. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00679512-P3
02/21/2025
Objection resolved — Addressed
02/19/2025
Permit issued — General Construction
X00620397-I1-GC
02/19/2025
Objection raised — Admin
02/13/2025
Objection resolved — Addressed
Latest 60 of 164 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offEVAN CONSTURCTION CORP07/30/2025
DOB NOWCurb CutSigned-offEVAN CONSTURCTION CORP07/30/2025
DOB NOWSolarSigned-offANDRINO CONTRACTING LLC07/25/2025
DOB NOWMechanical SystemsPermit IssuedEVAN CONSTURCTION CORP05/27/2025
DOB NOWSprinklersSigned-offA M B MECHANICAL INC05/16/2025
DOB NOWGeneral ConstructionPermit IssuedEVAN CONSTURCTION CORP02/19/2025
DOB NOWEarth WorkSigned-offEVAN CONSTURCTION CORP10/15/2024
DOB NOWStructuralSigned-offEVAN CONSTURCTION CORP10/15/2024
DOB NOWConstruction FenceSigned-offEVAN CONSTURCTION CORP10/15/2024
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC07/10/2024
DOB NOWMechanical SystemsPermit IssuedEVAN CONSTURCTION CORP03/21/2024
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT02/28/2024
DOB NOWSupport of ExcavationSigned-offEVAN CONSTURCTION CORP11/28/2023
DOB NOWStructuralSigned-offEVAN CONSTURCTION CORP11/08/2023
DOB NOWEarth WorkSigned-offEVAN CONSTURCTION CORP11/08/2023
DOB NOWConstruction FenceSigned-offEVAN CONSTURCTION CORP11/08/2023
DOB NOWStructuralSigned-offYAFE MEOD CORP08/19/2022
DOB NOWConstruction FenceSigned-offYAFE MEOD CORP03/24/2022
1 project · most recent 03/03/2025
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/03/2025Permit IssuedEVAN CONSTURCTION CORPHeating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-4C36NAHZ 36,000 BTU · Vrf Outdoor ×3
MXZ-8C48NAHZ 48,000 BTU · Vrf Outdoor ×1
Frigidaire MDL# FHTE123WA2 12,000 BTU · Ptac ×9
Ventilation
Zehnder COMFOAIR200 125 CFM · Erv ×8
Heating
Weil-Mclain CGI-3 58,000 BTU · Boiler ×1
CGI-6 158,000 BTU ×1
2 projects · most recent 08/26/2025
General Wiring
FiledStatusContractorScope
08/26/2025CompleteARGON ELECTRICAL CORP—
06/09/2024CompleteAV GROUP ELECTRICAL LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
11/25/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
10/20/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
08/21/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/07/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
08/07/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
07/09/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/07/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/02/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/02/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/16/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 89
DateRequirementInspectorRole
06/25/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
06/25/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
06/25/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
06/25/2025FinalNARESH MAHANGUprogress
06/25/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
03/06/2025Air barrier — testing Paul Raymondenergy_progress
03/06/2025Permanent certificatePaul Raymondenergy_progress
03/06/2025Maintenance informationPaul Raymondenergy_progress
03/06/2025HVAC-R and service water heating equipmentMARYAM RAKSHANenergy_progress
03/06/2025Interior lighting powerPaul Raymondenergy_progress
03/06/2025Air barrier - visual inspectionPaul Raymondenergy_progress
03/06/2025HVAC-R and service water piping design and insulationMARYAM RAKSHANenergy_progress
03/06/2025Insulation placement and R valuesPaul Raymondenergy_progress
03/06/2025Protection of exposed foundation insulationPaul Raymondenergy_progress
03/06/2025Fenestration air leakagePaul Raymondenergy_progress
03/06/2025Electric vehicle service equipment requirementsPaul Raymondenergy_progress
03/06/2025Exterior Insulation and Finish Systems (EIFS)Paul Raymondspecial
03/06/2025Fenestration areasPaul Raymondenergy_progress
03/06/2025Fenestration and door U-factor and product ratingsPaul Raymondenergy_progress
03/06/2025MeteringPaul Raymondenergy_progress
03/06/2025HVAC-R and service water heating system controlsMARYAM RAKSHANenergy_progress
03/06/2025Fire-Resistant Penetrations and JointsPaul Raymondspecial
03/06/2025Heating SystemsPaul Raymondspecial
03/06/2025Energy Code Compliance InspectionsPaul Raymondprogress
03/06/2025FinalPaul Raymondprogress
Latest 25 of 89.
▾Documents — 122 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/24/2026X00672999-I1Request digital key ↗
08/24/2026X00662946-P1Request digital key ↗
08/24/2026X00745752-P1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION7
04/22/2024240314691Open ↗
03/19/2024240314691Open ↗
03/19/2024240314691Open ↗
Showing 3 of 7 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
12/22/2022240314691Open ↗
▸Zoning, Tax Lot & Property Records12
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026X00620397-P1Open ↗
08/13/2026X00620397-P2Open ↗
08/13/2026X00620397-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026X00620397-I1Open ↗
08/13/2026X00620397-P3Open ↗
08/13/2026X00620397-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWRestrictive Declaration/Easement 14
08/13/2026X00620397-P2Open ↗
08/13/2026X00620397-P1Open ↗
08/13/2026X00620397-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications47
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/24/2026X00672999-I1Open ↗
08/24/2026X00662946-P1Open ↗
08/24/2026X00662946-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/02/2026X00662068-P1Open ↗
09/01/2026X00662946-I1Open ↗
09/01/2026X00620397-P3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/02/2026X00662068-P1Open ↗
09/01/2026X00662946-I1Open ↗
09/01/2026X00620397-P3Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/23/2022240314691Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
03/23/2022240314691Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026X00620397-I1Open ↗
08/13/2026X00620397-P2Open ↗
08/13/2026X00620397-P3Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/13/2026X00620397-P1Open ↗
08/13/2026X00620397-I1Open ↗
08/13/2026X00620397-P2Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
12/22/2022240314691Open ↗
12/22/2022240314691Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00620397-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00620397-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01246877-I1Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
12/02/2024240314691Open ↗
11/14/2024240314691Open ↗
12/22/2022240314691Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/23/2022240314691Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/23/2022240314691Open ↗
▸Other Documents19
▸DOB NOWSite Survey: Initial4
08/13/2026X00620397-P3Open ↗
08/13/2026X00620397-P2Open ↗
08/13/2026X00620397-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026X00620397-P1Open ↗
08/13/2026X00620397-P3Open ↗
08/13/2026X00620397-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/20/2026X00620397-P2Open ↗
08/20/2026X00620397-P3Open ↗
08/20/2026X00620397-I1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
11/14/2024240314691Open ↗
11/14/2024240314691Open ↗
03/23/2022240314691Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026X00663409-I1Open ↗
08/13/2026X00662068-I1Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
03/23/2022240314691Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026X00620397-I1Open ↗