Factory, light manufacturing
1277 MCDONALD AVENUE
BROOKLYN · Mapleton-Midwood (West) · BIN 3171055
💬 Discuss this project
1931Year Built
1Stories
F5Building Class
M1-1Zoning
5,572 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Factory, light manufacturing · Owner of record: 1277 MCDONALD LLC · 10,678 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionGeneral
Roof49p · 1 filing · 20 docs
Floor 347p · 1 filing · 20 docs
Floor 248p · 1 filing · 20 docs
Floor 149p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1277 MCDONALD AVENUE4407/08/2026
RELIABLE ENTERPRISES607/08/2026
ALEF CONSTRUCTION603/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/29/2022$3.9M—Private party → 1277 MCDONALD LLC$700/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AL FFRED ARCHITECTURE PLLC1104/21/2025
MJE PROFESSIONAL SERVICES110/26/2023
EYAL LEVITT ARCHITECT PC109/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MISTER EXPEDITER1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALEF CONSTRUCTION INCGeneral Contractor1207/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor407/08/2026
POWER DIRECT ELECTRIC INCElectrical103/22/2026
S & J INDUSTRIAL CORPFire Protection107/08/2026
CREATIVE PLUMBING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. INT'L ENGINEERING PLLC3129804/21/2025
Building Lifecycle
All (78)Filed (13)Permit Issued (11)Signed Off (6)Violation (7)Inspection (11)Special Inspection (30)
04/21/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE, INSTALLATION OF NEW PLUMBING FIXTURES, COLDAND HOT WATER PIPES, IN CONJUNCTION TO ALT JOB B00727811-I1
B00727811-P6
04/21/2025
Special inspection requirement — Energy Code Compliance Inspections
NANIK MASSAND
04/21/2025
Special inspection requirement — Maintenance information
MOHAMED MAHMOUD
04/21/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
NANIK MASSAND
04/21/2025
Special inspection requirement — Fenestration areas
MOHAMED MAHMOUD
04/21/2025
Special inspection requirement — Metering
MOHAMED MAHMOUD
04/21/2025
Special inspection requirement — Fenestration air leakage
MOHAMED MAHMOUD
04/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
NANIK MASSAND
04/21/2025
Special inspection requirement — Lighting controls
MOHAMED MAHMOUD
04/21/2025
Special inspection requirement — Interior lighting power
MOHAMED MAHMOUD
04/21/2025
Special inspection requirement — Masonry
NANIK MASSAND
04/21/2025
Special inspection requirement — Concrete - Cast-In-Place
NANIK MASSAND
04/21/2025
Special inspection requirement — Electrical motors and elevators
MOHAMED MAHMOUD
04/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MOHAMED MAHMOUD
04/21/2025
Special inspection requirement — Insulation placement and R values
MOHAMED MAHMOUD
04/21/2025
Special inspection requirement — Protection of exposed foundation insulation
MOHAMED MAHMOUD
04/21/2025
Special inspection requirement — Air barrier — testing
MOHAMED MAHMOUD
04/21/2025
Special inspection requirement — Air barrier continuity plan testing
MOHAMED MAHMOUD
04/21/2025
Special inspection requirement — Exterior lighting power
MOHAMED MAHMOUD
04/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MOHAMED MAHMOUD
04/21/2025
Special inspection requirement — Air barrier - visual inspection
MOHAMED MAHMOUD
03/13/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE, INSTALLATION OF NEW PLUMBING FIXTURES, COLDAND HOT WATER PIPES, IN CONJUNCTION TO ALT JOB B00727811-I1
B00727811-P5
03/13/2025
Special inspection requirement — Air barrier — testing
NANIK MASSAND
03/13/2025
Special inspection requirement — Metering
NANIK MASSAND
03/13/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
NANIK MASSAND
03/13/2025
Special inspection requirement — Concrete - Cast-In-Place
NANIK MASSAND
03/13/2025
Special inspection requirement — Masonry
NANIK MASSAND
03/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MOHAMED MAHMOUD
03/13/2025
Special inspection requirement — Energy Code Compliance Inspections
NANIK MASSAND
03/13/2025
Special inspection requirement — Exterior lighting power
NANIK MASSAND
03/13/2025
Special inspection requirement — Lighting controls
NANIK MASSAND
03/13/2025
Special inspection requirement — Fire-Resistance Rated Construction
NANIK MASSAND
02/12/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE, INSTALLATION OF NEW PLUMBING FIXTURES, COLDAND HOT WATER PIPES, IN CONJUNCTION TO ALT JOB B00727811-I1
B00727811-P4
01/30/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE, INSTALLATION OF NEW PLUMBING FIXTURES, COLDAND HOT WATER PIPES, IN CONJUNCTION TO ALT JOB B00727811-I1
B00727811-S4
01/08/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE, INSTALLATION OF NEW PLUMBING FIXTURES, COLDAND HOT WATER PIPES, IN CONJUNCTION TO ALT JOB B00727811-I1
B00727811-S2
12/20/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE, INSTALLATION OF NEW PLUMBING FIXTURES, COLDAND HOT WATER PIPES, IN CONJUNCTION TO ALT JOB B00727811-I1
B00727811-P3
12/19/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/11/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/22/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00953388-I1
10/30/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE, INSTALLATION OF NEW PLUMBING FIXTURES, COLDAND HOT WATER PIPES, IN CONJUNCTION TO ALT JOB B00727811-I1
B00727811-P2
10/14/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE, INSTALLATION OF NEW PLUMBING FIXTURES, COLDAND HOT WATER PIPES, IN CONJUNCTION TO ALT JOB B00727811-I1
B00727811-S1
10/02/2024
Violation issued (ECB, closed)
Unknown
10/02/2024
Violation issued (ECB, closed)
Construction
10/02/2024
Violation issued (ECB, closed)
Unknown
10/02/2024
Violation issued (ECB, closed)
Unknown
10/01/2024
Violation issued (ECB, closed)
Construction
10/01/2024
Violation issued (ECB, closed)
Construction
09/06/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/08/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/30/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/30/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/25/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/23/2024
Permit issued — Construction Fence
B00727811-S1-FN
07/16/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE, INSTALLATION OF NEW PLUMBING FIXTURES, COLDAND HOT WATER PIPES, IN CONJUNCTION TO ALT JOB B00727811-I1
B00727811-S3
07/16/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE, INSTALLATION OF NEW PLUMBING FIXTURES, COLDAND HOT WATER PIPES, IN CONJUNCTION TO ALT JOB B00727811-I1
B00727811-S5
07/05/2024
Permit issued — General Construction
B00727811-I1-GC
05/28/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/21/2024
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
04/15/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE, INSTALLATION OF NEW PLUMBING FIXTURES, COLDAND HOT WATER PIPES, IN CONJUNCTION TO ALT JOB B00727811-I1
B00727811-P1
03/12/2024
Permit issued — Sprinklers
B00727811-S2-EW-SP
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offALEF CONSTRUCTION INC07/23/2024
DOB NOWGeneral ConstructionPermit IssuedALEF CONSTRUCTION INC07/05/2024
DOB NOWSprinklersSigned-offS & J INDUSTRIAL CORP03/12/2024
DOB NOWPlumbingSigned-offAB PLUMBING INC03/12/2024
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC12/04/2023
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC10/27/2023
DOB NOWStructuralPermit IssuedALEF CONSTRUCTION INC09/15/2023
DOB NOWGeneral ConstructionPermit IssuedALEF CONSTRUCTION INC08/18/2023
DOB NOWGeneral ConstructionPermit IssuedALEF CONSTRUCTION INC07/18/2023
DOB NOWFoundationPermit IssuedALEF CONSTRUCTION INC07/18/2023
DOB NOWConstruction FenceSigned-offALEF CONSTRUCTION INC07/14/2023
BIS—ISSUEDN/A09/21/2016
1 project · most recent 04/21/2025
Sprinkler System
FiledStatusContractorScope
04/21/2025Signed-offS & J INDUSTRIAL CORPSprinkler System
1 project · most recent 04/21/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/21/2025Signed-offCREATIVE PLUMBING INGas, Storm, Water/Sanitary
4 projects · most recent 04/15/2024
General Wiring
FiledStatusContractorScope
04/15/2024CompletePOWER DIRECT ELECTRIC INC—
03/24/2024CompleteLENS ELECTRIC, INCGeneral Wiring
03/12/2024CompleteFRIED ELECTRIC CO.General Wiring
10/27/2023CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
12/19/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/06/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/08/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/30/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/30/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/28/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/21/2024Fail-Final PL - Up to 9 Requested FloorsFailView ↗
12/02/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/02/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
04/21/2025Air barrier - visual inspectionMOHAMED MAHMOUDenergy_progress
04/21/2025Maintenance informationMOHAMED MAHMOUDenergy_progress
04/21/2025Concrete - Cast-In-PlaceNANIK MASSANDspecial
04/21/2025Excavations - Sheeting, Shoring, and BracingNANIK MASSANDspecial
04/21/2025MasonryNANIK MASSANDspecial
04/21/2025Structural Stability – Alterations of existing buildingsMOHAMED MAHMOUDspecial
04/21/2025Energy Code Compliance InspectionsNANIK MASSANDprogress
04/21/2025Fire-Resistance Rated ConstructionNANIK MASSANDprogress
04/21/2025Lighting controlsMOHAMED MAHMOUDenergy_progress
04/21/2025Interior lighting powerMOHAMED MAHMOUDenergy_progress
04/21/2025Fenestration air leakageMOHAMED MAHMOUDenergy_progress
04/21/2025Insulation placement and R valuesMOHAMED MAHMOUDenergy_progress
04/21/2025MeteringMOHAMED MAHMOUDenergy_progress
04/21/2025Electrical motors and elevatorsMOHAMED MAHMOUDenergy_progress
04/21/2025Fenestration areasMOHAMED MAHMOUDenergy_progress
04/21/2025Protection of exposed foundation insulationMOHAMED MAHMOUDenergy_progress
04/21/2025Air barrier — testing MOHAMED MAHMOUDenergy_progress
04/21/2025Air barrier continuity plan testingMOHAMED MAHMOUDenergy_progress
04/21/2025Exterior lighting powerMOHAMED MAHMOUDenergy_progress
04/21/2025Fenestration and door U-factor and product ratingsMOHAMED MAHMOUDenergy_progress
03/13/2025Air barrier - visual inspectionNANIK MASSANDenergy_progress
03/13/2025Concrete - Cast-In-PlaceNANIK MASSANDspecial
03/13/2025Excavations - Sheeting, Shoring, and BracingNANIK MASSANDspecial
03/13/2025MeteringNANIK MASSANDenergy_progress
03/13/2025Air barrier — testing NANIK MASSANDenergy_progress
Latest 25 of 68.
▾Documents — 142 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/26/2026B00953388-I1Request digital key ↗
08/25/2026B00727811-P3Request digital key ↗
08/25/2026B00727811-P2Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION6
01/29/2025321146880Open ↗
12/26/2024340912953Open ↗
09/23/2024340912953Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/15/2016321146880Open ↗
▸BISWORK PERMIT APPLICATION1
09/21/2016321146880Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
01/28/2025340912953Open ↗
▸Zoning, Tax Lot & Property Records13
▸DOB NOWZD1: DOB Zoning Diagram5
08/25/2026B00727811-P4Open ↗
08/13/2026B00727811-P2Open ↗
08/13/2026B00727811-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/25/2026B00727811-P4Open ↗
08/13/2026B00727811-I1Open ↗
08/13/2026B00727811-P6Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B00727811-I1Open ↗
08/13/2026B00727811-I1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
03/27/2023322160415Open ↗
▸Seals & Professional Certifications40
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/25/2026B00727811-P4Open ↗
08/25/2026B00727811-P3Open ↗
08/25/2026B00727811-P2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/30/2026B00727811-P6Open ↗
09/30/2026B00727811-P6Open ↗
09/05/2026B00727811-S5Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/30/2026B00727811-P6Open ↗
09/30/2026B00727811-P6Open ↗
09/30/2026B00727811-P6Open ↗
Showing 3 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
09/26/2024340912953Open ↗
09/19/2024340912953Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/22/2015321146880Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/22/2015321146880Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/19/2024340912953Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/25/2026B00727811-P4Open ↗
08/13/2026B00727811-P2Open ↗
08/13/2026B00727811-P5Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST1
06/22/2015321146880Open ↗
▸BISBPP: STREET TREES SITE PLAN1
09/19/2024340912953Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00727811-I1Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/25/2026B00727811-P4Open ↗
08/25/2026B00727811-P3Open ↗
08/25/2026B00727811-P2Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/19/2024340912953Open ↗
▸Energy Compliance3
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
09/19/2024340912953Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/26/2024340912953Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00727811-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/19/2024340912953Open ↗
▸Approvals, Objections & Sign-offs3
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
01/28/2025340912953Open ↗
01/28/2025340912953Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
06/22/2015321146880Open ↗
▸Cost, Insurance & Ownership1
▸BISDEPT OF FINANCE VERIFICATION1
03/27/2023322160415Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION6
09/27/2024340912953Open ↗
09/26/2024340912953Open ↗
06/01/2023322160415Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET2
03/10/2023322160415Open ↗
06/22/2015321146880Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/19/2024340912953Open ↗
▸Other Documents29
▸DOB NOWProperty Ownership Certification5
08/25/2026B00727811-P4Open ↗
08/25/2026B00727811-P2Open ↗
08/25/2026B00727811-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial5
08/25/2026B00727811-P4Open ↗
08/13/2026B00727811-I1Open ↗
08/13/2026B00727811-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/25/2026B00727811-P4Open ↗
08/13/2026B00727811-P5Open ↗
08/13/2026B00727811-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlot Diagram5
08/25/2026B00727811-P4Open ↗
08/13/2026B00727811-I1Open ↗
08/13/2026B00727811-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSURVEY: INITIAL5
08/25/2026B00727811-P4Open ↗
08/13/2026B00727811-P6Open ↗
08/13/2026B00727811-P5Open ↗
Showing 3 of 5 on file for this type
▸BISPLOT DIAGRAM2
03/27/2023322160415Open ↗
06/22/2015321146880Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
03/27/2023322160415Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00727811-I1Open ↗