โ† Back
BuildNYC
Gas or electric utility
1278 MCDONALD AVENUE
BROOKLYN ยท BIN 3130395
๐Ÿ’ฌ Discuss this project
0Year Built
โ€”Stories
U2Building Class
M1-1Zoning
0 sfGross Floor Area
0Units
0 Active ViolationsFDNY Report โ†—
Gas or electric utility ยท 99,357 sf lot ยท 0 FAR built ยท Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing
Floor 12 filings
Site & exterior5 filings
โ–พDesign Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Consolidated Edison Company of New York903/03/2026
Langan Engineering112/02/2020
โ–พFiling Representatives (Expediters)
RepresentativeFilingsMost Recent
Consolidated Edison Company of New York1503/21/2026
RPO203/21/2026
โ–พContractors (License-Anchored)
FirmTradeRolesMost Recent
D'Onofrio General ContractorsGeneral Contractor403/21/2026
O'Leary ConstructionGeneral Contractor403/21/2026
Posillico CivilGeneral Contractor403/21/2026
M & S Mechanical ServicesPlumbing207/08/2026
New York Plumbing-Heating-CoolFire Protection207/08/2026
M & S Buildings ServicesFire Protection107/08/2026
โ–พSpecial Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons106903/03/2026
Building Lifecycle
All (75)Filed (10)Permit Issued (7)Signed Off (5)Inspection (7)Objection (8)Special Inspection (30)
09/14/2026
Signed off โ€” Alteration
CONSTRUCTION OF PROPOSED REINFORCED CONCRETE FOUNDATION AND STEEL SUPPORT STRUCTURE FOR NEW TRANSFORMER #10.
B00937182-I1
03/18/2026
Special inspection requirement โ€” Structural Steel - High Strength Bolting
GEORGE GHEBRYAL
03/18/2026
Special inspection requirement โ€” Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
GEORGE GHEBRYAL
03/18/2026
Special inspection requirement โ€” Concrete - Cast-In-Place
GEORGE GHEBRYAL
03/18/2026
Special inspection requirement โ€” Energy Code Compliance Inspections
GEORGE GHEBRYAL
03/18/2026
Special inspection requirement โ€” Final
GEORGE GHEBRYAL
03/18/2026
Special inspection requirement โ€” Subsurface Conditions โ€“ Fill Placement & In-Place Density
GEORGE GHEBRYAL
03/18/2026
Special inspection requirement โ€” Footing and Foundation
GEORGE GHEBRYAL
03/18/2026
Special inspection requirement โ€” Structural Steel - Details
GEORGE GHEBRYAL
03/18/2026
Special inspection requirement โ€” Subgrade Inspections
GEORGE GHEBRYAL
03/18/2026
Special inspection requirement โ€” Post-installed Anchors
GEORGE GHEBRYAL
03/18/2026
Special inspection requirement โ€” Structural Steel - Welding
GEORGE GHEBRYAL
03/03/2026
Filed โ€” Alteration
CONSTRUCTION OF PROPOSED REINFORCED CONCRETE FOUNDATION AND STEEL SUPPORT STRUCTURE FOR NEW TRANSFORMER #10.
B00937182-P3
02/25/2026
Special inspection requirement โ€” Structural Steel - High Strength Bolting
GEORGE GHEBRYAL
02/25/2026
Special inspection requirement โ€” Footing and Foundation
GEORGE GHEBRYAL
02/25/2026
Special inspection requirement โ€” Final
GEORGE GHEBRYAL
02/25/2026
Special inspection requirement โ€” Energy Code Compliance Inspections
GEORGE GHEBRYAL
02/25/2026
Special inspection requirement โ€” Subsurface Conditions โ€“ Fill Placement & In-Place Density
GEORGE GHEBRYAL
02/25/2026
Special inspection requirement โ€” Subgrade Inspections
GEORGE GHEBRYAL
02/25/2026
Special inspection requirement โ€” Structural Steel - Welding
GEORGE GHEBRYAL
02/25/2026
Special inspection requirement โ€” Concrete - Cast-In-Place
GEORGE GHEBRYAL
02/25/2026
Special inspection requirement โ€” Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
GEORGE GHEBRYAL
02/25/2026
Special inspection requirement โ€” Post-installed Anchors
GEORGE GHEBRYAL
02/25/2026
Special inspection requirement โ€” Structural Steel - Details
GEORGE GHEBRYAL
03/11/2025
Permit expired, never signed off โ€” General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
B00619935-I1-GC-CX
02/28/2025
Signed off โ€” Alteration
INSTALLATION OF A DELLUGE VALVE AND A 6" WATER SUPPLY FOR THE FUTURE TRANSFORMER 10 DELUGE WATER SPRAY SYSTEM.
B00937359-I1
02/21/2025
Inspection โ€” Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection โ†—
02/20/2025
Inspection โ€” Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection โ†—
02/11/2025
Signed off โ€” Alteration
INSTALLATION OF A DELLUGE SYSTEM FOR TRANSFORMER # 10 AT CON EDISONS ELECTRICAL SUB STATION. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00965187-I1
02/11/2025
Permit renewed โ€” Plumbing
Renewed without changes
B00937359-I1-PL
02/03/2025
Special inspection requirement โ€” Sprinkler Systems
GEORGE GHEBRYAL
01/10/2025
Objection resolved โ€” Addressed
01/09/2025
Objection raised โ€” Plumbing
01/05/2025
Filed โ€” Alteration
INSTALLATION OF A DELLUGE SYSTEM FOR TRANSFORMER # 10 AT CON EDISONS ELECTRICAL SUB STATION. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00965187-P1
01/03/2025
Signed off โ€” Alteration
B00659154-I1
12/16/2024
Inspection โ€” Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection โ†—
12/12/2024
Inspection โ€” Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection โ†—
12/12/2024
Inspection โ€” Certified Sprinkler - SP - Roughing
Certified
View inspection โ†—
12/11/2024
Permit issued โ€” Sprinklers
B00659154-I1-EW-SP
12/05/2024
Special inspection requirement โ€” Sprinkler Systems
GEORGE GHEBRYAL
11/27/2024
Inspection โ€” Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection โ†—
10/21/2024
Inspection โ€” Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection โ†—
09/10/2024
Permit issued โ€” Sprinklers
B00965187-I1-EW-SP
06/17/2024
Permit renewed โ€” Structural
Renewed with changes
B00937182-I1-GC-CX
04/10/2024
Filed โ€” Alteration
INSTALLATION OF A DELLUGE SYSTEM FOR TRANSFORMER # 10 AT CON EDISONS ELECTRICAL SUB STATION. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00965187-I1
04/03/2024
Permit issued โ€” Structural
B00937182-I1-GC-CX
03/25/2024
Filed โ€” Alteration
CONSTRUCTION OF PROPOSED REINFORCED CONCRETE FOUNDATION AND STEEL SUPPORT STRUCTURE FOR NEW TRANSFORMER #10.
B00937182-P2
03/11/2024
Permit renewed โ€” General Construction
Renewed with changes
B00619935-I1-GC-CX
02/12/2024
Objection resolved โ€” Addressed
02/02/2024
Permit issued โ€” Plumbing
B00937359-I1-PL
01/04/2024
Objection resolved โ€” Addressed
11/27/2023
Objection raised โ€” Scope
11/27/2023
Objection raised โ€” Inspections
11/27/2023
Objection raised โ€” Structural
11/27/2023
Objection raised โ€” Admin
11/17/2023
Filed โ€” Alteration
CONSTRUCTION OF PROPOSED REINFORCED CONCRETE FOUNDATION AND STEEL SUPPORT STRUCTURE FOR NEW TRANSFORMER #10.
B00937182-I1
10/19/2023
Filed โ€” Alteration
INSTALLATION OF A DELLUGE VALVE AND A 6" WATER SUPPLY FOR THE FUTURE TRANSFORMER 10 DELUGE WATER SPRAY SYSTEM.
B00937359-I1
03/15/2023
Permit renewed โ€” Structural
Renewed without changes
B00619935-I1-GC-CX
04/08/2022
Permit renewed โ€” General Construction
Renewed without changes
B00619935-I1-GC-CX
02/14/2022
Permit issued โ€” Structural
B00619935-I1-GC-CX
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWโ€”M & S Mechanical Servicesโ€”
DOB NOWโ€”New York Plumbing-Heating-Coolโ€”
DOB NOWโ€”M & S Buildings Servicesโ€”
DOB NOWโ€”O'Leary Constructionโ€”
DOB NOWโ€”O'Leary Constructionโ€”
DOB NOWโ€”D'Onofrio General Contractingโ€”
DOB NOWโ€”M & S Mechanical Servicesโ€”
DOB NOWโ€”D'Onofrio General Contractingโ€”
DOB NOWโ€”D'Onofrio General Contractingโ€”
DOB NOWโ€”D'Onofrio General Contractingโ€”
DOB NOWโ€”Posillico Civilโ€”
DOB NOWโ€”New York Plumbing-Heating-Coolโ€”
DOB NOWโ€”Posillico Civilโ€”
BISโ€”O'Leary Constructionโ€”
BISโ€”O'Leary Constructionโ€”
BISโ€”O'Leary Constructionโ€”
BISโ€”Posillico Civilโ€”
BISโ€”Posillico Civilโ€”
BISโ€”O'Leary Constructionโ€”
BISโ€”Con Edison Companyโ€”
BISโ€”Con Edison Companyโ€”
BISโ€”Con Edison Companyโ€”
BISโ€”Con Edison Companyโ€”
BISโ€”Con Edison Companyโ€”
BISโ€”Con Edison Companyโ€”
BISโ€”United Fire Protectionโ€”
BISโ€”Con Edison Companyโ€”
BISโ€”Con Edison Companyโ€”
BISโ€”Con Edison Companyโ€”
BISโ€”Con Edison Companyโ€”
BISโ€”Con Edison Companyโ€”
BISโ€”Con Edison Companyโ€”
BISโ€”United Fire Protectionโ€”
BISโ€”S. Digiacomo & Sonโ€”
BISโ€”S. Digiacomo & Sonโ€”
BISโ€”Paul Hundertmark Burner Serviceโ€”
BISโ€”Grinnell Corp Dba Simplexโ€”
BISโ€”D'Onofrio General Contractorsโ€”
BISโ€”D'Onofrio General Contractorsโ€”
BISโ€”Clover Mechanicalโ€”
Nothing on file for this building.
Nothing on file for this building.
โ–พDocuments โ€” 175 on file (BIS + DOB NOW)
โ–ธPlans & Drawings10
โ–ธDOB NOWPlans/Sketch8
08/31/2026B00619935-I1Request the plans โ†—
08/31/2026B00659154-I1Request the plans โ†—
08/26/2026B00937359-I1Request the plans โ†—
Showing 3 of 8 on file for this type
โ–ธDOB NOWPlans/Sketch - Sprinkler1
09/02/2026B00377082-I1Request the plans โ†—
โ–ธDOB NOWPlans/Sketch - Structural1
09/02/2026B00412812-I1Request the plans โ†—
โ–ธApplications & Permits43
โ–ธBISPLAN / WORK APPROVAL APPLICATION26
07/09/2022320740784Open โ†—
07/09/2022320740793Open โ†—
07/08/2022320740793Open โ†—
Showing 3 of 26 on file for this type
โ–ธBISWORK PERMIT APPLICATION15
06/21/2022322086014Open โ†—
12/09/2021322086014Open โ†—
11/09/2020340783165Open โ†—
Showing 3 of 15 on file for this type
โ–ธBISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
05/11/2017320740793Open โ†—
05/10/2017320740784Open โ†—
โ–ธSeals & Professional Certifications46
โ–ธBISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
06/01/2020322086023Open โ†—
06/01/2020322086023Open โ†—
05/21/2020322086014Open โ†—
Showing 3 of 12 on file for this type
โ–ธDOB NOWSpecial Inspector Seal & Signature12
09/06/2026B00937182-P3Open โ†—
09/06/2026B00937182-P3Open โ†—
09/01/2026B00937182-I1Open โ†—
Showing 3 of 12 on file for this type
โ–ธDOB NOWDPL-1: Design Professional Seal & Signature10
09/02/2026B00412812-I1Open โ†—
08/31/2026B00619935-I1Open โ†—
08/31/2026B00659154-I1Open โ†—
Showing 3 of 10 on file for this type
โ–ธBISPROFESSIONAL CERTIFICATION STATEMENT5
11/05/2020340783165Open โ†—
06/17/2020322086014Open โ†—
06/17/2020322086014Open โ†—
Showing 3 of 5 on file for this type
โ–ธDOB NOWProgress Inspector Seal & Signature3
09/06/2026B00937182-P3Open โ†—
09/01/2026B00937182-I1Open โ†—
08/23/2026B00412812-I1Open โ†—
โ–ธBISPROFESSIONAL CERTIFIED CHECKLIST2
06/17/2020322086014Open โ†—
06/01/2020322086023Open โ†—
โ–ธBISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/05/2020340783165Open โ†—
โ–ธBISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/05/2020340783165Open โ†—
โ–ธTrade Schedules & Equipment2
โ–ธBISSCHEDULE B - PLUMBING1
11/20/2012320527202Open โ†—
โ–ธBISFA - FDNY APPROVAL : FD-FAA1
02/06/2018320485444Open โ†—
โ–ธSafety & Tenant Protection1
โ–ธBISEXCAVATION - SHEETING, SHORING, AND BRACING1
05/21/2021340783165Open โ†—
โ–ธEnvironmental & Asbestos18
โ–ธDOB NOWDEP ACP-5: Asbestos Assessment Report9
09/02/2026B00412812-I1Open โ†—
08/31/2026B00619935-I1Open โ†—
08/31/2026B00659154-I1Open โ†—
Showing 3 of 9 on file for this type
โ–ธBISASBESTOS: CERTIFICATION (DEP ACP5)8
11/05/2020340783165Open โ†—
06/01/2020322086023Open โ†—
05/21/2020322086014Open โ†—
Showing 3 of 8 on file for this type
โ–ธDOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/26/2026B00937359-I1Open โ†—
โ–ธEnergy Compliance5
โ–ธBISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
06/17/2020322086023Open โ†—
06/17/2020322086023Open โ†—
06/17/2020322086014Open โ†—
Showing 3 of 4 on file for this type
โ–ธBISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
06/18/2020322086023Open โ†—
โ–ธInspections & Test Reports10
โ–ธBISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
07/07/2020322086023Open โ†—
06/01/2020322086023Open โ†—
05/21/2020322086014Open โ†—
โ–ธBISTECHNICAL REPORT: RESPONSIBILITY2
07/21/2022320740793Open โ†—
11/05/2020340783165Open โ†—
โ–ธBISTECHNICAL REPORT: CONCRETE DESIGN MIX2
07/07/2020322086023Open โ†—
06/01/2020322086023Open โ†—
โ–ธBISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
11/12/2021322086014Open โ†—
โ–ธBISHYDRO FLOW TEST LETTER1
11/29/2012320527202Open โ†—
โ–ธBISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
11/12/2021322086014Open โ†—
โ–ธApprovals, Objections & Sign-offs10
โ–ธBISADMINISTRATIVE OBJECTIONS6
05/08/2013320753760Open โ†—
04/24/2013320740784Open โ†—
04/24/2013320740793Open โ†—
Showing 3 of 6 on file for this type
โ–ธBISLETTERS - SUPPORTING DOCUMENTATION1
01/09/2013320485453Open โ†—
โ–ธBISFINAL1
05/21/2021340783165Open โ†—
โ–ธBISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/21/2021340783165Open โ†—
โ–ธDOB NOWDEP Variance (V5) letter1
08/13/2026B00937359-I1Open โ†—
โ–ธCost, Insurance & Ownership10
โ–ธBISCOST AFFIDAVIT9
11/05/2020340783165Open โ†—
06/01/2020322086023Open โ†—
05/21/2020322086014Open โ†—
Showing 3 of 9 on file for this type
โ–ธBISCOST AFFIDAVIT (FINAL): PW31
05/21/2021340783165Open โ†—
โ–ธFiling & Intake Forms20
โ–ธBISEFILING COVER SHEET10
06/01/2020322086023Open โ†—
05/19/2020322086014Open โ†—
09/16/2016321451950Open โ†—
Showing 3 of 10 on file for this type
โ–ธBISADDITIONAL INFORMATION7
07/21/2022320740793Open โ†—
07/18/2022320740784Open โ†—
02/12/2018321451950Open โ†—
Showing 3 of 7 on file for this type
โ–ธBISBOROUGH INTAKE FORM2
12/09/2021322086014Open โ†—
02/12/2018321294862Open โ†—
โ–ธBISEFILING JOB APPLICATION COVER SHEET1
11/05/2020340783165Open โ†—