← Back
BuildNYC
Two family frame
128-03 NORTH CONDUIT AVENUE
QUEENS · South Ozone Park · BIN 4257360
💬 Discuss this project
1960Year Built
2Stories
B2Building Class
R3-2Zoning
2,280 sfGross Floor Area
2Units
6 Active Violations ▸FDNY Report ↗
Two family frame · 4,455 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPhotovoltaic Solar Panel Installation and Signage2p · 1 filing · 4 docs
Floor 1Accessory door legalization1 filing · 2 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/11/2019$820K—Private party → Private party$360/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Arquitectura Varela110/14/2025
Parker and West Engineering106/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sunrun103/21/2026
CM3 Design Studio103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sunrun Installation ServiceGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272106/18/2025
Building Lifecycle
10/14/2025
Filed — Alteration
Work done to relocate (1) accessory door facing side yard as shown in plans to be legalized under this application. No change in use, occupancy or egress.
Q01299682-I1
10/14/2025
Special inspection requirement — Air barrier - visual inspection
Vicente Varela
06/26/2025
Permit issued — Solar
Q01242634-I1-SL
06/25/2025
At time of inspection observed excessive debris located by exposure 2., maintain adequate construction housekeeping
ECB violation · open
06/25/2025
At time of inspection observed structural opening creating new doorway on exposure 3 without any permits., obtain permit
ECB violation · open
7 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service06/26/2025
1 project · most recent 06/18/2025
FiledStatusContractorScope
06/18/2025CompleteSunrun Solar Electl—
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
10/14/2025Air barrier - visual inspectionVicente Varelaenergy_progress
6 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account