ECB03/25/2008WORK W/O PERMIT. NOTED: AT FRONT & LEFT SIDE OF PREMISES (EAST) OBSERVED NEW CONCRETE PAVED MORE THAN 200 SQ.FT. NO PERMIT FILED AT TIME OF INSPECTION. REMEDY: OBTAIN A PERMIT.Nothing owed — awaiting certificate of correction
Two family brick · 2,838 sf lot · 0.64 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.