ECB04/09/2026WORK WITHOUT A PERMIT. WOOD FRAME STRUCTURE HAS BEEN ERECTED CREATING A HORIZONTAL AND VERTICAL EXTENSION TO THE ENTIRE 2ND LEVEL. EXTENSION IS SUPPORTED BY EXPOSED STEEL BEAMS AT REAR OF BUILDING AND MEASURES$2K due
ECB04/09/2026WORK WITHOUT A PERMIT. NOTED AT REAR OF PREMISES. OBSERVED A STEEL FRAME AND CMU BLOCK STRUCTURE HAS BEEN ERECTED CREATING DECK. DECK MEASURES APPROX. 20FT X 20FT X 8FT. METAL SPIRAL STAIRCASE INSTALLED LEADING$2K due
DOB04/09/2026DUE TO ILLEGAL HORIZONTAL/VERTICAL EXTENSION WITH NEW ROOF DECK AND ILLEGAL CMU BLOCK DECK AT REAR OF PREMISES, SUBMIT ENGINEERS REPORT TO THE DEPARTMENT OF BUILDINGS.
ECB04/09/2026WORK WITHOUT A PERMIT. OBSERVED ELECTRICAL WIRING INSTALLED FOR LIGHTING AT DECK AND EXTENSION AT REAR OF PREMISES., OBTAIN PERMITHearing held — result not yet published$1K proposed
Two stories - detached, small or mid-size · 2,000 sf lot · 0.42 FAR built
Locations of Work
No floor-level scope or drawing coverage on file for this building.