← Back
Cape Cod
128-22 149 STREET
QUEENS · BIN 4262823
💬 Discuss this project
1950Year Built
1.5Stories
A0Building Class
R3AZoning
1,125 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Cape Cod · Owner of record: 149TH HOLDINGS LLC · 4,000 sf lot · 0.28 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Floor 24p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
Cellar6p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK BASE HOLDING2004/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/30/2024$330K—Private party → 149TH HOLDINGS LLC$293/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
D&E BUILD EVERGREEN INC.611/26/2025
PETER CHO ARCHITECTS, PLLC101/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RISHON HOMES CORPGeneral Contractor404/09/2026
WATERMARK PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
D&E BUILD EVERGREEN I9342611/26/2025
TRIANGLE INSPECTION & TES7495211/26/2025
Building Lifecycle
All (70)Filed (7)Permit Issued (5)Signed Off (4)Violation (2)Inspection (8)Objection (14)Special Inspection (30)
04/27/2026
Signed off — Alteration CO
CONVERSION OF THE EXISTING ONE AND HALF STORY ONE-FAMILY BUILDING (COQ 82014) INTO A TWO- STORY TWO-FAMILY BUILDING AS SHOWN ON THE PLANS. PROPOSED VERTIVAL AND HORIZONTAL ENLARGEMENT. INTERIOR RENOVATION AS PER PLAN. OBTAIN A NEW CERTIFICATE OF OCCUPANCY
Q01161615-I1
03/11/2026
Signed off — Alteration CO
CONVERSION OF THE EXISTING ONE AND HALF STORY ONE-FAMILY BUILDING (COQ 82014) INTO A TWO- STORY TWO-FAMILY BUILDING AS SHOWN ON THE PLANS. PROPOSED VERTIVAL AND HORIZONTAL ENLARGEMENT. INTERIOR RENOVATION AS PER PLAN. OBTAIN A NEW CERTIFICATE OF OCCUPANCY
Q01161615-S2
02/23/2026
Signed off — Alteration CO
CONVERSION OF THE EXISTING ONE AND HALF STORY ONE-FAMILY BUILDING (COQ 82014) INTO A TWO- STORY TWO-FAMILY BUILDING AS SHOWN ON THE PLANS. PROPOSED VERTIVAL AND HORIZONTAL ENLARGEMENT. INTERIOR RENOVATION AS PER PLAN. OBTAIN A NEW CERTIFICATE OF OCCUPANCY
Q01161615-S3
02/03/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/30/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
Danny Chen
12/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Danny Chen
12/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
Danny Chen
12/22/2025
Special inspection requirement — Maintenance information
Danny Chen
12/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Danny Chen
12/22/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
12/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Danny Chen
12/22/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Danny Chen
12/18/2025
Special inspection requirement — Duct leakage testing, insulation and design
Danny Chen
12/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
Danny Chen
12/18/2025
Special inspection requirement — Maintenance information
Danny Chen
12/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Danny Chen
12/18/2025
Special inspection requirement — Mechanical Systems
Danny Chen
12/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Danny Chen
12/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Danny Chen
12/18/2025
Special inspection requirement — Final
PETER CHO
12/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
Danny Chen
12/18/2025
Special inspection requirement — Ventilation and air distribution system
Danny Chen
12/09/2025
Signed off — Alteration CO
CONVERSION OF THE EXISTING ONE AND HALF STORY ONE-FAMILY BUILDING (COQ 82014) INTO A TWO- STORY TWO-FAMILY BUILDING AS SHOWN ON THE PLANS. PROPOSED VERTIVAL AND HORIZONTAL ENLARGEMENT. INTERIOR RENOVATION AS PER PLAN. OBTAIN A NEW CERTIFICATE OF OCCUPANCY
Q01161615-S1
12/09/2025
Objection resolved — Addressed
12/09/2025
Objection resolved — Addressed
12/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Danny Chen
12/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
12/09/2025
Special inspection requirement — Subgrade Inspections
Danny Chen
12/09/2025
Special inspection requirement — Structural Steel - Details
Danny Chen
12/09/2025
Special inspection requirement — Masonry
Danny Chen
12/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Danny Chen
12/09/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
12/09/2025
Special inspection requirement — Concrete - Cast-In-Place
Danny Chen
12/09/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Danny Chen
12/09/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Danny Chen
12/09/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Danny Chen
12/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Danny Chen
12/08/2025
Objection raised — Energy
12/08/2025
Objection raised — Energy
11/26/2025
Filed — Alteration CO
CONVERSION OF THE EXISTING ONE AND HALF STORY ONE-FAMILY BUILDING (COQ 82014) INTO A TWO- STORY TWO-FAMILY BUILDING AS SHOWN ON THE PLANS. PROPOSED VERTIVAL AND HORIZONTAL ENLARGEMENT. INTERIOR RENOVATION AS PER PLAN. OBTAIN A NEW CERTIFICATE OF OCCUPANCY
Q01161615-P3
11/26/2025
Filed — Alteration CO
CONVERSION OF THE EXISTING ONE AND HALF STORY ONE-FAMILY BUILDING (COQ 82014) INTO A TWO- STORY TWO-FAMILY BUILDING AS SHOWN ON THE PLANS. PROPOSED VERTIVAL AND HORIZONTAL ENLARGEMENT. INTERIOR RENOVATION AS PER PLAN. OBTAIN A NEW CERTIFICATE OF OCCUPANCY
Q01161615-P2
11/26/2025
Filed — Alteration CO
CONVERSION OF THE EXISTING ONE AND HALF STORY ONE-FAMILY BUILDING (COQ 82014) INTO A TWO- STORY TWO-FAMILY BUILDING AS SHOWN ON THE PLANS. PROPOSED VERTIVAL AND HORIZONTAL ENLARGEMENT. INTERIOR RENOVATION AS PER PLAN. OBTAIN A NEW CERTIFICATE OF OCCUPANCY
Q01161615-P1
11/07/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/30/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/25/2025
Permit issued — Plumbing
Q01161615-S2-PL
03/11/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/28/2025
Violation issued (ECB, closed)
Construction
02/28/2025
Violation issued (ECB, closed)
Construction
02/24/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
02/12/2025
Permit issued — Construction Fence
Q01161615-S1-FN
02/12/2025
Permit issued — Structural
Q01161615-I1-FO-EA
02/12/2025
Permit issued — Structural
Q01161615-I1-GC-CX
02/12/2025
Permit issued — Mechanical Systems
Q01161615-S3-MS
02/07/2025
Objection resolved — Addressed
02/04/2025
Objection resolved — Addressed
02/04/2025
Objection resolved — Addressed
01/31/2025
Objection resolved — Addressed
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWATERMARK PLUMBING CORP04/25/2025
DOB NOWConstruction FenceSigned-offRISHON HOMES CORP02/12/2025
DOB NOWStructuralSigned-offRISHON HOMES CORP02/12/2025
DOB NOWStructuralPermit IssuedRISHON HOMES CORP02/12/2025
DOB NOWMechanical SystemsSigned-offRISHON HOMES CORP02/12/2025
1 project · most recent 11/26/2025
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/26/2025Signed-offRISHON HOMES CORPAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Goodman GLXS3BN3610AA 36,000 BTU · Condensing Unit ×2
GLXS3BN6010AA 60,000 BTU · Condensing Unit ×2
Heating
Goodman GR9S800803BNAA 80,000 BTU · Furnace ×2
GR9S921005CNAA 100,000 BTU · Furnace ×2
Ventilation
Hampton Bay 7114-01 50 CFM · Exhaust Fan ×10
Samsung ME16A4021AS 900 CFM · Kitchen Exhaust ×4
1 project · most recent 11/26/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
11/26/2025Signed-offWATERMARK PLUMBING CORPGas, Storm, Water/Sanitary
1 project · most recent 12/06/2025
General Wiring
FiledStatusContractorScope
12/06/2025CompleteAYYUB ELECTRIC CORPGeneral Wiring
1 project · most recent 11/26/2025
Steel Wood
FiledStatusContractorScope
11/26/2025Signed-offWATERMARK PLUMBING CORPSteel, Wood
1 project · most recent 11/26/2025
Fence
FiledStatusContractorScope
11/26/2025Signed-offWATERMARK PLUMBING CORPFence
1 project · most recent 11/26/2025
Earthwork
FiledStatusContractorScope
11/26/2025Signed-offWATERMARK PLUMBING CORPEarthwork
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
02/03/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/30/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/07/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/30/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/11/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
02/24/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
12/22/2025HVAC-R and service water heating equipmentDanny Chenenergy_progress
12/22/2025HVAC-R and service water piping design and insulationDanny Chenenergy_progress
12/22/2025HVAC-R and service water heating system controlsDanny Chenenergy_progress
12/22/2025Maintenance informationDanny Chenenergy_progress
12/22/2025Energy Code Compliance InspectionsDanny Chenprogress
12/22/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
12/22/2025Fire-Resistant Penetrations and JointsDanny Chenspecial
12/22/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDanny Chenspecial
12/18/2025Duct leakage testing, insulation and designDanny Chenenergy_progress
12/18/2025HVAC-R and service water heating equipmentDanny Chenenergy_progress
12/18/2025Maintenance informationDanny Chenenergy_progress
12/18/2025HVAC-R and service water piping design and insulationDanny Chenenergy_progress
12/18/2025Mechanical SystemsDanny Chenspecial
12/18/2025Structural Stability – Alterations of existing buildingsDanny Chenspecial
12/18/2025Energy Code Compliance InspectionsDanny Chenprogress
12/18/2025FinalPETER CHOprogress
12/18/2025HVAC-R and service water heating system controlsDanny Chenenergy_progress
12/18/2025Ventilation and air distribution systemDanny Chenenergy_progress
12/09/2025Energy Code Compliance InspectionsDanny Chenprogress
12/09/2025Structural Stability – Alterations of existing buildings—special
12/09/2025Subgrade InspectionsDanny Chenspecial
12/09/2025Structural Steel - DetailsDanny Chenspecial
12/09/2025MasonryDanny Chenspecial
12/09/2025Fire-Resistant Penetrations and JointsDanny Chenspecial
12/09/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
Latest 25 of 53.
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/21/2026Q01161615-I1Request digital key ↗
08/21/2026Q01161615-P1Request digital key ↗
08/21/2026Q01161615-S3Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q01161615-P3Open ↗
08/13/2026Q01161615-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature11
08/30/2026Q01161615-I1Open ↗
08/30/2026Q01161615-I1Open ↗
08/30/2026Q01161615-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/30/2026Q01161615-I1Open ↗
08/30/2026Q01161615-I1Open ↗
08/26/2026Q01161615-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026Q01161615-P1Open ↗
08/21/2026Q01161615-S3Open ↗
08/21/2026Q01161615-S2Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026Q01161615-S3Open ↗
08/21/2026Q01161615-S2Open ↗
08/21/2026Q01161615-I1Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026Q01161615-P3Open ↗
08/13/2026Q01161615-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01161615-I1Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial2
08/13/2026Q01161615-I1Open ↗
08/13/2026Q01161615-P3Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q01161615-P3Open ↗
08/13/2026Q01161615-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q01161615-I1Open ↗
08/13/2026Q01161615-P3Open ↗
▸DOB NOWProperty Ownership Certification2
08/21/2026Q01161615-I1Open ↗
08/21/2026Q01161615-P3Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01161615-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01161615-I1Open ↗