← Back
Zoned residential, not Manhattan
128-64 HOOK CREEK BOULEVARD
QUEENS · Rosedale · BIN 4864873
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R2Zoning
0 sfGross Floor Area
0Units
1 Open Violation ▸FDNY Report ↗
Zoned residential, not Manhattan · Owner of record: ATID DEVELOPMENT, LLC · 24,920 sf lot · 0 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ATID DEVELOPMENT203/21/2026
KAVIAN103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SION CONSULTING ENGINEERING PC107/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SION CONSULTING ENGINEERING203/21/2026
Building Lifecycle
All (26)Filed (1)Objection (3)Special Inspection (22)
12/15/2025
Special inspection requirement — Permanent certificate
12/15/2025
Special inspection requirement — Ventilation and air distribution system
12/15/2025
Special inspection requirement — Air barrier — testing
12/15/2025
Special inspection requirement — Fenestration air leakage
08/16/2023
Objection raised — Accessibility
08/16/2023
Objection resolved — Resolved
08/02/2023
Objection raised — Accessibility
07/17/2023
Filed — New Building
THIS APPLICATION IS FILED FOR PROPOSED TWO STORY AND CELLAR, ONE FAMILY NEW BUILDING. ONE ZONING SEVEN TAX LOTS
Q00809917-I1
01/09/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
01/09/2023
Special inspection requirement — Subgrade Inspections
01/09/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
01/09/2023
Special inspection requirement — Final
01/09/2023
Special inspection requirement — Footing and Foundation
01/09/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
01/09/2023
Special inspection requirement — HVAC-R and service water heating system controls
01/09/2023
Special inspection requirement — Air barrier - visual inspection
01/09/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
01/09/2023
Special inspection requirement — Electric vehicle service equipment requirements
01/09/2023
Special inspection requirement — Insulation placement and R values
01/09/2023
Special inspection requirement — Interior lighting power
01/09/2023
Special inspection requirement — Fenestration areas
01/09/2023
Special inspection requirement — Mechanical Systems
01/09/2023
Special inspection requirement — HVAC-R and service water heating equipment
01/09/2023
Special inspection requirement — Concrete - Cast-In-Place
01/09/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
01/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nothing on file for this building.
1 project · most recent 07/17/2023
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/17/2023——Ventilation Systems
Ventilation
Hampton Bay 50 CFM Wall/Ceiling Mount Roomside Installation Bathroom Exhaust Fan, ENERGY STAR 50 CFM ×4
1 project · most recent 07/17/2023
Wood
FiledStatusContractorScope
07/17/2023——Wood
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
12/15/2025Permanent certificate—energy_progress
12/15/2025Ventilation and air distribution system—energy_progress
12/15/2025Air barrier — testing —energy_progress
12/15/2025Fenestration air leakage—energy_progress
01/09/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
01/09/2023Subgrade Inspections—special
01/09/2023Subsurface Investigations (Borings/Test Pits)—special
01/09/2023Final—progress
01/09/2023Footing and Foundation—progress
01/09/2023Fenestration and door U-factor and product ratings—energy_progress
01/09/2023HVAC-R and service water heating system controls—energy_progress
01/09/2023Air barrier - visual inspection—energy_progress
01/09/2023HVAC-R and service water piping design and insulation—energy_progress
01/09/2023Electric vehicle service equipment requirements—energy_progress
01/09/2023Insulation placement and R values—energy_progress
01/09/2023Interior lighting power—energy_progress
01/09/2023Fenestration areas—energy_progress
01/09/2023Mechanical Systems—special
01/09/2023HVAC-R and service water heating equipment—energy_progress
01/09/2023Concrete - Cast-In-Place—special
01/09/2023Excavations - Sheeting, Shoring, and Bracing—special
01/09/2023Fire-Resistant Penetrations and Joints—special
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/24/2026Q00809917-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION3
05/24/2018421023234Open ↗
01/30/2009410217448Open ↗
01/30/2009410217448Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISTAX LOT- TENTATIVE LOT NUMBER ISSUED1
09/11/2014421023234Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00809917-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00809917-I1Open ↗
▸Seals & Professional Certifications2
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION1
09/10/2014421023234Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/24/2026Q00809917-I1Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING2
09/10/2014421023234Open ↗
01/30/2009410217448Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026Q00809917-I1Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST1
01/30/2009410217448Open ↗
▸BISST-1 Street Tree Checklist1
09/10/2014421023234Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00809917-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
01/30/2009410217448Open ↗
▸Energy Compliance1
▸BISTR8: Energy Code Progress Inspections1
09/10/2014421023234Open ↗
▸Approvals, Objections & Sign-offs4
▸BISADMINISTRATIVE OBJECTIONS2
09/10/2014421023234Open ↗
01/30/2009410217448Open ↗
▸BISSCHEDULE A - OCCUPANCY - USE2
09/10/2014421023234Open ↗
01/30/2009410217448Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
09/10/2014421023234Open ↗
01/30/2009410217448Open ↗
▸Other Documents3
▸BISPlot Diagram2
09/10/2014421023234Open ↗
01/30/2009410217448Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q00809917-I1Open ↗