← Back
Three families
128 BAY 50TH STREET
BROOKLYN · Gravesend (South) · BIN 3187422
💬 Discuss this project
1925Year Built
2Stories
C0Building Class
R5Zoning
2,520 sfGross Floor Area
3Units
9 Open Violations 6 unresolved · 3 paperwork only ▸FDNY Report ↗
Three families · 3,867 sf lot · 0.65 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralPlumbingCivil
Roof1p · 1 filing · 19 docs
Floor 213p · 2 filings · 20 docs
Floor 112p · 2 filings · 20 docs
Cellar13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ZKW ENTERPRISES507/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHITECTURAL CONCEPT707/22/2024
ASR ENGINEERING PC108/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHITECTUAL CONCEPT1203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW J.D. GEN. CONSTR. INCGeneral Contractor1407/08/2026
JOSEPH WEINSTEIN ELECTRIC 000796General Contractor703/22/2026
JOHN FITZGERALD PLBG &HTGPlumbing507/08/2026
JOSEPH WEINSTEIN ELECTRICElectrical203/22/2026
ZKW ENTERPRISES INCGeneral Contractor207/08/2026
EGBERT BAPTISTEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCHITECTURAL CONCEPT3642607/22/2024
Building Lifecycle
All (68)Filed (8)Permit Issued (10)Signed Off (1)Violation (13)Inspection (6)Special Inspection (30)
07/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
07/31/2024
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
07/31/2024
Special inspection requirement — HVAC-R and service water heating system controls
MUZAFFAR JAMAL
07/31/2024
Special inspection requirement — HVAC-R and service water heating equipment
MUZAFFAR JAMAL
07/31/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
07/22/2024
Filed — Alteration
INSTALL NEW PLUMBING AND GAS FIRED FIXTURES AS PER APPROVED ARCHITECTURAL DRAWINGS AND RELATED PIPING AS PER DRAWING.
B00546058-P2
06/21/2024
Permit issued — Plumbing
B00546058-I1-PL
06/10/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/24/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/18/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00782858-I1
12/11/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/23/2023
Filed — Alteration
INSTALL NEW PLUMBING AND GAS FIRED FIXTURES AS PER APPROVED ARCHITECTURAL DRAWINGS AND RELATED PIPING AS PER DRAWING.
B00546058-P1
10/13/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
10/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
10/13/2023
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
10/13/2023
Special inspection requirement — HVAC-R and service water heating system controls
MUZAFFAR JAMAL
10/13/2023
Special inspection requirement — HVAC-R and service water heating equipment
MUZAFFAR JAMAL
09/26/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/21/2023
Filed — Alteration
Application filed for a two-story horizontal extension and alteration of an existing (2 story +cellar) two-family house as per drawings herewith filed. No change in egress, use, or occupancy.
B00538002-P5
09/19/2023
Special inspection requirement — Interior lighting power
MUZAFFAR JAMAL
09/19/2023
Special inspection requirement — Metering
MUZAFFAR JAMAL
09/19/2023
Special inspection requirement — HVAC-R and service water heating system controls
MUZAFFAR JAMAL
09/19/2023
Special inspection requirement — Duct leakage testing, insulation and design
MUZAFFAR JAMAL
09/19/2023
Special inspection requirement — Maintenance information
MUZAFFAR JAMAL
09/19/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
MUZAFFAR JAMAL
09/19/2023
Special inspection requirement — Ventilation and air distribution system
MUZAFFAR JAMAL
09/19/2023
Special inspection requirement — Air barrier - visual inspection
MUZAFFAR JAMAL
09/19/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
09/19/2023
Special inspection requirement — Fenestration air leakage
MUZAFFAR JAMAL
09/19/2023
Special inspection requirement — HVAC-R and service water heating equipment
MUZAFFAR JAMAL
09/19/2023
Special inspection requirement — Fenestration areas
MUZAFFAR JAMAL
09/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
09/19/2023
Special inspection requirement — Concrete - Cast-In-Place
MUZAFFAR JAMAL
09/19/2023
Special inspection requirement — Masonry
MUZAFFAR JAMAL
09/19/2023
Special inspection requirement — Mechanical Systems
MUZAFFAR JAMAL
09/19/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
MUZAFFAR JAMAL
09/19/2023
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
09/19/2023
Special inspection requirement — Final
TARIQ SIDDIQUI
09/19/2023
Special inspection requirement — Fire-Resistance Rated Construction
MUZAFFAR JAMAL
07/31/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/13/2023
Permit issued — Earth Work
B00538002-I1-GC-CX
05/30/2023
Permit issued — Construction Fence
B00546059-I1-FN
05/16/2023
Permit issued — Sidewalk Shed
B00782858-I1-SH
08/31/2022
Filed — Alteration
Application filed for a two-story horizontal extension and alteration of an existing (2 story +cellar) two-family house as per drawings herewith filed. No change in egress, use, or occupancy.
B00538002-P1
08/29/2022
Permit issued — Plumbing
B00546058-I1-PL
08/04/2022
Permit issued — Sidewalk Shed
B00782858-I1-SH
08/01/2022
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00782858-I1
06/27/2022
Permit issued — General Construction
B00538002-I1-GC-CX
06/17/2022
Permit issued — Structural
B00538002-I1-GC-CX
06/08/2022
Violation issued (ECB, closed)
Site Safety
06/08/2022
Violation issued (ECB, closed)
Unknown
06/08/2022
Violation issued (ECB, closed)
Construction
06/07/2022
Filed — Alteration
INSTALL NEW PLUMBING AND GAS FIRED FIXTURES AS PER APPROVED ARCHITECTURAL DRAWINGS AND RELATED PIPING AS PER DRAWING.
B00546058-I1
05/31/2022
Permit issued — Foundation
B00538002-I1-GC-CX
04/26/2022
Permit issued — Construction Fence
B00546059-I1-FN
12/16/2021
Filed — Alteration
B00546059-I1
07/13/2021
Filed — Alteration
Application filed for a two-story horizontal extension and alteration of an existing (2 story +cellar) two-family house as per drawings herewith filed. No change in egress, use, or occupancy.
B00538002-I1
05/22/2012
Violation issued (HPD, open)
B
05/22/2012
Violation issued (HPD, open)
B
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG06/21/2024
DOB NOWEarth WorkPermit IssuedNEW J.D. GEN. CONSTR. INC07/13/2023
DOB NOWConstruction FencePermit IssuedNEW J.D. GEN. CONSTR. INC05/30/2023
DOB NOWSidewalk ShedSigned-offZKW ENTERPRISES INC05/16/2023
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG08/29/2022
DOB NOWSidewalk ShedSigned-offZKW ENTERPRISES INC08/04/2022
DOB NOWGeneral ConstructionPermit IssuedNEW J.D. GEN. CONSTR. INC06/27/2022
DOB NOWStructuralPermit IssuedNEW J.D. GEN. CONSTR. INC06/17/2022
DOB NOWFoundationPermit IssuedNEW J.D. GEN. CONSTR. INC05/31/2022
DOB NOWConstruction FencePermit IssuedNEW J.D. GEN. CONSTR. INC04/26/2022
BISOTISSUEDNEW JD GEN CONSTRUCTION INC04/16/2008
1 project · most recent 09/21/2023
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/21/2023Permit IssuedNEW J.D. GEN. CONSTR. INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Fujitsu ASU7RLF1 70,000 BTU · Fan Coil Indoor ×10
Heating
Slant-Fin LX-90 90,000 BTU · Boiler ×2
Ventilation
Greenheck SP-C50-QD 50 CFM · Exhaust Fan ×8
1 project · most recent 07/22/2024
Gas Water/Sanitary
FiledStatusContractorScope
07/22/2024Signed-offJOHN FITZGERALD PLBG &HTGGas, Water/Sanitary
3 projects · most recent 02/24/2025
General Wiring
FiledStatusContractorScope
02/24/2025Permit IssuedJOSEPH WEINSTEIN ELECTRIC4 meters
02/24/2025CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
08/20/2022Permit IssuedRICHARD NEU—
1 project · most recent 09/21/2023
Wood
FiledStatusContractorScope
09/21/2023Permit IssuedNEW J.D. GEN. CONSTR. INCWood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/10/2024Fail-Final General Construction Non-Directive 14FailView ↗
05/24/2024Fail-Final General Construction Non-Directive 14FailView ↗
12/11/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/31/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
07/31/2024Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
07/31/2024Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
07/31/2024HVAC-R and service water heating system controlsMUZAFFAR JAMALenergy_progress
07/31/2024HVAC-R and service water heating equipmentMUZAFFAR JAMALenergy_progress
07/31/2024HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
10/13/2023HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
10/13/2023Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
10/13/2023Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
10/13/2023HVAC-R and service water heating system controlsMUZAFFAR JAMALenergy_progress
10/13/2023HVAC-R and service water heating equipmentMUZAFFAR JAMALenergy_progress
09/19/2023Interior lighting powerMUZAFFAR JAMALenergy_progress
09/19/2023MeteringMUZAFFAR JAMALenergy_progress
09/19/2023HVAC-R and service water heating system controlsMUZAFFAR JAMALenergy_progress
09/19/2023Duct leakage testing, insulation and designMUZAFFAR JAMALenergy_progress
09/19/2023Maintenance informationMUZAFFAR JAMALenergy_progress
09/19/2023Fenestration and door U-factor and product ratingsMUZAFFAR JAMALenergy_progress
09/19/2023Ventilation and air distribution systemMUZAFFAR JAMALenergy_progress
09/19/2023Air barrier - visual inspectionMUZAFFAR JAMALenergy_progress
09/19/2023HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
09/19/2023Fenestration air leakageMUZAFFAR JAMALenergy_progress
09/19/2023HVAC-R and service water heating equipmentMUZAFFAR JAMALenergy_progress
09/19/2023Fenestration areasMUZAFFAR JAMALenergy_progress
09/19/2023Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
09/19/2023Concrete - Cast-In-PlaceMUZAFFAR JAMALspecial
09/19/2023MasonryMUZAFFAR JAMALspecial
Latest 25 of 56.
▾Documents — 156 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/31/2026B00546059-I1Request digital key ↗
08/29/2026B00546058-P2Request digital key ↗
08/29/2026B00546058-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION4
10/17/2019321758790Open ↗
12/09/2013320853527Open ↗
12/06/2013320903331Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026B00538002-P6Open ↗
08/13/2026B00538002-P5Open ↗
08/13/2026B00538002-I1Open ↗
Showing 3 of 4 on file for this type
▸BISZONING DIAGRAM1
12/20/2019321758790Open ↗
▸BISZONING EXHIBIT I- CERTIFICATION1
08/08/2014320853527Open ↗
▸BISZONING EXHIBIT III- DESC & OWNERSHIP STMNT1
08/08/2014320853527Open ↗
▸Seals & Professional Certifications89
▸DOB NOWProgress Inspector Seal & Signature61
09/30/2026B00546058-P1Open ↗
09/30/2026B00546058-P1Open ↗
09/30/2026B00546058-P1Open ↗
Showing 3 of 61 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/30/2026B00546058-P1Open ↗
08/31/2026B00538002-P6Open ↗
08/31/2026B00538002-P6Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/31/2026B00546059-I1Open ↗
08/29/2026B00546058-P2Open ↗
08/29/2026B00546058-P1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/17/2019321758790Open ↗
09/17/2013320903331Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026B00538002-P5Open ↗
08/13/2026B00538002-P1Open ↗
08/13/2026B00538002-P6Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING1
09/17/2013320903331Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
10/17/2019321758790Open ↗
09/17/2013320903331Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/29/2026B00546058-P1Open ↗
08/29/2026B00546058-P2Open ↗
08/29/2026B00546058-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/16/2019321758790Open ↗
09/17/2013320903331Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/17/2019321758790Open ↗
09/17/2013320903331Open ↗
▸Approvals, Objections & Sign-offs5
▸BISSCHEDULE A - OCCUPANCY / USE3
10/17/2019321758790Open ↗
09/17/2013320903331Open ↗
12/06/2013320903331Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
12/09/2013320853527Open ↗
09/17/2013320903331Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT2
10/17/2019321758790Open ↗
09/17/2013320903331Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
08/08/2014320853527Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026B00538002-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026B00538002-I1Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET3
10/17/2019321758790Open ↗
12/09/2013320853527Open ↗
09/17/2013320903331Open ↗
▸Other Documents16
▸DOB NOWSite Survey: Initial4
08/13/2026B00538002-I1Open ↗
08/13/2026B00538002-P5Open ↗
08/13/2026B00538002-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026B00538002-I1Open ↗
08/13/2026B00538002-P1Open ↗
08/13/2026B00538002-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/13/2026B00538002-P5Open ↗
08/13/2026B00538002-P6Open ↗
08/13/2026B00538002-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM2
02/27/2020321758790Open ↗
09/17/2013320903331Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00538002-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026B00538002-I1Open ↗