← Back
Three families
128 BERKELEY PLACE
BROOKLYN · BIN 3019856
💬 Discuss this project
1882Year Built
3Stories
C0Building Class
R6BZoning
5,544 sfGross Floor Area
3Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Three families · Owner of record: LUNA B, LLC D/B/A 128 BERKELEY LLC · 2,167 sf lot · 2.56 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 20 docs
Floor 3Under Construction46p · 2 filings · 20 docs
Floor 2Under Construction41p · 2 filings · 20 docs
Floor 1Under Construction39p · 2 filings · 20 docs
CellarUnder Construction1p · 1 filing · 20 docs
Sub-BasementUnder Construction38p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LUNA B, LLC D/B/A 128 BERKELEY LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/30/2024$4.0M—Private party → LUNA B, LLC D/B/A 128 BERKELEY LLC$712/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GACE DPC307/20/2026
PINNER ARCHITECTURE PLLC301/12/2026
DOWNTOWN ENGINEERS511/28/2025
TOHFAZ UDDIN PE PC111/19/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ROBERT S SCHNITZER1403/21/2026
SPRING SCAFFOLDING LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FALCON PACIFIC CONSTRUCT*General Contractor909/19/2026
ARCO PLBG AND HTG INCFire Protection106/27/2026
SPRING SCAFFOLDING LLCGeneral Contractor104/09/2026
ARCO PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OUTSOURCE SPECIAL INSPECT2827307/20/2026
DOWNTOWN ENGINEERS9711411/28/2025
MB INSPECTIONS, CORP.8703107/23/2025
Building Lifecycle
All (82)Filed (12)Permit Issued (11)Signed Off (1)Violation (11)Inspection (7)Objection (10)Special Inspection (30)
09/18/2026
Permit issued — Structural
B01220609-I1-ST
07/20/2026
Filed — Alteration
Reinforce exist timber fooor joists (w/sistering). Additional concrete & steel to build rear deck projecting from rear first floor. (supported below & at grade). Deck dimensions 21' W x 8' D. Also adding 2 new rear wider windows+ double door w/transom(s).
B01220609-P2
07/20/2026
Special inspection requirement — Structural Cold-Formed Steel
JONAR MADRIAGA
07/20/2026
Special inspection requirement — Structural Wood Frame
JONAR MADRIAGA
07/20/2026
Special inspection requirement — Final
JONAR MADRIAGA
07/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JONAR MADRIAGA
07/20/2026
Special inspection requirement — Wood – Seismic Resistance
07/20/2026
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
06/24/2026
Permit issued — Sprinklers
B01181738-S3-EW-SP
06/16/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/09/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/09/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/07/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/01/2026
Violation issued (HPD, open)
A
04/14/2026
Permit issued — General Construction
B01181738-S1-GC
04/13/2026
Permit issued — General Construction
B01181738-I1-GC
04/13/2026
Permit issued — Mechanical Systems
B01181738-S4-MS
03/17/2026
Signed off — Alteration
B01317796-I1
01/14/2026
Special inspection requirement — Lighting in dwelling units
Lawrence pinner
01/14/2026
Special inspection requirement — Interior lighting power
Lawrence pinner
01/14/2026
Special inspection requirement — Insulation placement and R values
Lawrence pinner
01/14/2026
Special inspection requirement — Air barrier - visual inspection
Lawrence pinner
01/14/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Lawrence pinner
01/14/2026
Special inspection requirement — Final
Lawrence pinner
01/14/2026
Special inspection requirement — Lighting controls
Lawrence pinner
01/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
Lawrence pinner
01/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Lawrence pinner
01/14/2026
Special inspection requirement — Fenestration areas
Lawrence pinner
01/14/2026
Special inspection requirement — Fenestration air leakage
Lawrence pinner
01/12/2026
Filed — Alteration
Complete replacement of the water, gas, and sanitary riser system(s) throughout the building. Work on Floors: Basement, 001 thru 003. No changes to use, egress, or occupancy.
B01181738-P3
01/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Lawrence pinner
12/19/2025
Filed — Alteration
Reinforce exist timber fooor joists (w/sistering). Additional concrete & steel to build rear deck projecting from rear first floor. (supported below & at grade). Deck dimensions 21' W x 8' D. Also adding 2 new rear wider windows+ double door w/transom(s).
B01220609-P1
12/12/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/12/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/11/2025
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
12/11/2025
Special inspection requirement — Structural Wood Frame
JONAR MADRIAGA
12/11/2025
Special inspection requirement — Final
JONAR MADRIAGA
12/11/2025
Special inspection requirement — Structural Steel - Details
12/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JONAR MADRIAGA
12/11/2025
Special inspection requirement — Structural Cold-Formed Steel
JONAR MADRIAGA
12/11/2025
Special inspection requirement — Wood – Seismic Resistance
12/10/2025
Special inspection requirement — Insulation placement and R values
Lawrence pinner
12/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
Lawrence pinner
12/10/2025
Special inspection requirement — Air barrier - visual inspection
Lawrence pinner
12/10/2025
Special inspection requirement — Fenestration areas
Lawrence pinner
12/10/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Lawrence pinner
11/28/2025
Filed — Alteration
Complete replacement of the water, gas, and sanitary riser system(s) throughout the building. Work on Floors: Basement, 001 thru 003. No changes to use, egress, or occupancy.
B01181738-P2
11/20/2025
Permit issued — Protection and Mechanical Methods
B01317796-I1-PMM
11/19/2025
Filed — Alteration
B01317796-I1
11/19/2025
Filed — Alteration
Complete replacement of the water, gas, and sanitary riser system(s) throughout the building. Work on Floors: Basement, 001 thru 003. No changes to use, egress, or occupancy.
B01181738-P1
11/19/2025
Violation issued (HPD, open)
I
11/06/2025
Permit issued — Plumbing
B01181738-S2-PL
09/09/2025
Objection resolved — Addressed
08/08/2025
Permit issued — Mechanical Systems
B01181738-S4-MS
08/05/2025
Objection resolved — Addressed
08/05/2025
Objection resolved — Addressed
08/05/2025
Objection resolved — Addressed
08/05/2025
Objection resolved — Addressed
08/01/2025
Objection raised — Admin
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedFALCON PACIFIC CONSTRUCT*09/18/2026
DOB NOWSprinklersPermit IssuedARCO PLBG AND HTG INC06/24/2026
DOB NOWGeneral ConstructionSigned-offFALCON PACIFIC CONSTRUCT*04/14/2026
DOB NOWGeneral ConstructionSigned-offFALCON PACIFIC CONSTRUCT*04/13/2026
DOB NOWMechanical SystemsPermit IssuedFALCON PACIFIC CONSTRUCT*04/13/2026
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC11/20/2025
DOB NOWPlumbingPermit IssuedARCO PLBG AND HTG INC11/06/2025
DOB NOWMechanical SystemsPermit IssuedFALCON PACIFIC CONSTRUCT*08/08/2025
DOB NOWGeneral ConstructionSigned-offFALCON PACIFIC CONSTRUCT*07/17/2025
DOB NOWStructuralPermit IssuedFALCON PACIFIC CONSTRUCT*05/09/2025
DOB NOWGeneral ConstructionSigned-offFALCON PACIFIC CONSTRUCT*03/04/2025
BISOTISSUEDCENTURION SOLAR ENERGY01/07/2021
1 project · most recent 01/12/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/12/2026Signed-offFALCON PACIFIC CONSTRUCT*Heating and Air Conditioning Systems
Heat / Cool
Lg Multi F Mid MId Static Concealed Ducted High Efficiency Single/Multi-Zone Heat Pump (Indoor Unit). 12,000 BTU · Vrf Indoor ×1
Multi F Mid Static - Concealed Ducted High Efficiency Single/ Multizone Heat Puno (Indoor unit). Model No. KNUJB241A 24,000 BTU · Vrf Indoor ×1
Multi F Mid Static - Concealed Ducted High Efficiency Single/Multizone Heat Pump (Indoor Unit). Model No. KNUJB241A 24,000 BTU · Vrf Indoor ×1
Multi F Mid Static Concealed Ducted High Efficiency Single/Multi Zone Heat Pump (Indoor unit). Model No. KNUJB121A 12,000 BTU · Vrf Indoor ×1
Multi F Multi Position Ducted Air Handler Unit. Model No. KNMLB361A 36,000 BTU · Vrf Indoor ×1
Multi V S Outdoor Unit, 6HP, R32. Model No. ZRUM036GSS0 36,000 BTU · Heat Pump Outdoor ×1
Multi V S Outdoor Unit, 6HP, R32. Model No. ZRUM060GSSO 60,000 BTU · Heat Pump Outdoor ×1
Multi VS, Outdoor Unit, 4HP, R32 Model No. ZRUN024GSS0 24,000 BTU · Heat Pump Outdoor ×1
Single or Multi-Zone Wall Mounted Unit. Model No. KNMA B071A. 7,000 BTU · Vrf Indoor ×1
Single or Multi-Zone Wall Mounted Unit. Model No. KNUA B121A 12,000 BTU · Vrf Indoor ×1
Single or Multizone Wall Mounted Unit. Model No. KNMA B071A 7,000 BTU · Vrf Indoor ×1
1 project · most recent 01/12/2026
FiledStatusContractorScope
01/12/2026Permit IssuedARCO PLBG AND HTG INC124 heads
1 project · most recent 01/12/2026
FiledStatusContractorScope
01/12/2026Permit IssuedARCO PLBG AND HTG INC—
3 projects · most recent 08/20/2025
General Wiring
FiledStatusContractorScope
08/20/2025Permit IssuedL&B ELEC'L INTERNATIONALGeneral Wiring
09/04/2024CompleteBLAZE ELECTRIC INC.General Wiring
12/22/2020CompleteBERGER QUALITY ELEC'L CON—
1 project · most recent 07/20/2026
Steel Concrete Wood
FiledStatusContractorScope
07/20/2026Permit IssuedFALCON PACIFIC CONSTRUCT*Steel, Concrete, Wood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/16/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/09/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/09/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/07/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/12/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/12/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/12/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
07/20/2026Structural Cold-Formed SteelJONAR MADRIAGAspecial
07/20/2026Structural Wood FrameJONAR MADRIAGAprogress
07/20/2026FinalJONAR MADRIAGAprogress
07/20/2026Structural Stability – Alterations of existing buildingsJONAR MADRIAGAspecial
07/20/2026Wood – Seismic Resistance—special
07/20/2026Post-installed AnchorsJONAR MADRIAGAspecial
01/14/2026Lighting in dwelling unitsLawrence pinnerenergy_progress
01/14/2026Interior lighting powerLawrence pinnerenergy_progress
01/14/2026Insulation placement and R valuesLawrence pinnerenergy_progress
01/14/2026Air barrier - visual inspectionLawrence pinnerenergy_progress
01/14/2026Fenestration and door U-factor and product ratingsLawrence pinnerenergy_progress
01/14/2026FinalLawrence pinnerprogress
01/14/2026Lighting controlsLawrence pinnerenergy_progress
01/14/2026Fire-Resistance Rated ConstructionLawrence pinnerprogress
01/14/2026Energy Code Compliance InspectionsLawrence pinnerprogress
01/14/2026Fenestration areasLawrence pinnerenergy_progress
01/14/2026Fenestration air leakageLawrence pinnerenergy_progress
01/06/2026Energy Code Compliance InspectionsLawrence pinnerprogress
12/11/2025Post-installed AnchorsJONAR MADRIAGAspecial
12/11/2025Structural Wood FrameJONAR MADRIAGAprogress
12/11/2025FinalJONAR MADRIAGAprogress
12/11/2025Structural Steel - Details—special
12/11/2025Structural Stability – Alterations of existing buildingsJONAR MADRIAGAspecial
12/11/2025Structural Cold-Formed SteelJONAR MADRIAGAspecial
12/11/2025Wood – Seismic Resistance—special
Latest 25 of 51.
▾Documents — 112 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/21/2026B01181738-S4Request digital key ↗
08/21/2026B01181738-P3Request digital key ↗
08/21/2026B01181738-P2Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits12
▸DOB NOWLPC Approval/Permit9
08/21/2026B01181738-S2Open ↗
08/21/2026B01181738-S1Open ↗
08/19/2026B01220609-P2Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
11/10/2021340774610Open ↗
01/05/2021340774610Open ↗
▸BISWORK PERMIT APPLICATION1
01/07/2021340774610Open ↗
▸Seals & Professional Certifications52
▸DOB NOWProgress Inspector Seal & Signature28
09/11/2026B01181738-S4Open ↗
09/11/2026B01181738-S4Open ↗
09/11/2026B01181738-S4Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/21/2026B01181738-S3Open ↗
08/21/2026B01181738-S2Open ↗
08/21/2026B01181738-S1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026B01181738-S3Open ↗
09/23/2026B01181738-S3Open ↗
09/11/2026B01181738-S4Open ↗
Showing 3 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/05/2021340774610Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/05/2021340774610Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES1
01/05/2021340774610Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
01/07/2021340774610Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/21/2026B01181738-S3Open ↗
08/21/2026B01181738-S2Open ↗
08/21/2026B01181738-S1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/05/2021340774610Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
12/13/2021340774610Open ↗
12/13/2021340774610Open ↗
01/05/2021340774610Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/05/2021340774610Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/13/2021340774610Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
01/05/2021340774610Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
12/13/2021340774610Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/13/2021340774610Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
12/13/2021340774610Open ↗
12/13/2021340774610Open ↗
01/07/2021340774610Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/05/2021340774610Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/14/2021340774610Open ↗
▸BISLANDMARKS SIGNOFF1
12/14/2021340774610Open ↗
▸BISLANDMARKS APPROVAL1
01/05/2021340774610Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/13/2021340774610Open ↗
01/05/2021340774610Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
12/10/2021340774610Open ↗
01/05/2021340774610Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/05/2021340774610Open ↗
▸Other Documents1
▸BISTax Abatement Miscellaneous1
12/14/2021340774610Open ↗