← Back
BuildNYC
Two family brick
128 HAWLEY AVENUE
STATEN ISLAND · BIN 5177449
💬 Discuss this project
1975Year Built
2Stories
B1Building Class
R3XZoning
5,580 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family brick · 12,606 sf lot · 0.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 20 docs
Floor 2Under Construction25p · 2 filings · 20 docs
Floor 1Private residenceUnder Construction25p · 3 filings · 20 docs
CellarUnder Construction3p · 1 filing · 20 docs
BasementUnder Construction21p · 1 filing · 20 docs
Sub-BasementUnder Construction1p · 1 filing · 2 docs
Site & exterior1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A Tech Engineering NYC105/18/2026
Think Design Architecture502/23/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Think Design Architecture303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Stout HomesGeneral Contractor311/13/2026
Stout HomesScaffold204/09/2026
Stout Homesspecialty_contractor207/03/2026
Duo Plumbing & HeatingPlumbing208/20/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P Design Consultant8472109/13/2025
SRA Planning & Expediting5677109/13/2025
Building Lifecycle
11/12/2026
Permit issued — Curb Cut
S01283907-I1-CC
09/02/2026
Signed off — Alteration
APPLICATION IS FILED FOR THE INSTALLATION OF 8'-0' HIGH TEMPORARY CONSTRUCTION FENCE. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
S01223126-I1
08/19/2026
Permit issued — Plumbing
S01385137-I1-PL
07/20/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
07/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
65 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutPermit IssuedStout Homes11/12/2026
DOB NOWPlumbingPermit IssuedDuo Plumbing & Heating08/19/2026
DOB NOWFoundationPermit IssuedStout Homes07/01/2026
DOB NOWPlumbingPermit IssuedDuo Plumbing & Heating07/01/2026
DOB NOWMechanical SystemsPermit IssuedStout Homes07/01/2026
DOB NOWGeneral ConstructionPermit IssuedStout Homes07/01/2026
DOB NOWMechanical SystemsPermit IssuedStout Homes06/29/2026
DOB NOWConstruction FenceSigned-offStout Homes03/25/2026
DOB NOWConstruction FenceSigned-offStout Homes08/25/2025
2 projects · most recent 02/23/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
02/23/2026Permit IssuedStout HomesHeating and Air Conditioning Systems, Ventilation Systems
———Heating and Air Conditioning Systems, Ventilation Systems
2 projects · most recent 05/18/2026
Water/Sanitary Plumbing-Sprinkler Storm
FiledStatusContractorScope
05/18/2026Permit IssuedDuo Plumbing & HeatingPlumbing-Sprinkler, Water/Sanitary
02/23/2026Permit IssuedDuo Plumbing & HeatingStorm, Water/Sanitary
1 project · most recent 09/11/2026
General Wiring
FiledStatusContractorScope
09/11/2026Permit IssuedLive Wire Electric 1General Wiring
2 projects · most recent 02/23/2026
Wood Concrete Masonry
FiledStatusContractorScope
02/23/2026Permit IssuedStout HomesConcrete, Wood
———Masonry, Wood
1 project · most recent 05/09/2025
Fence
FiledStatusContractorScope
05/09/2025Signed-offStout HomesFence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/20/2026Pass-Final PL - UndergroundPassView ↗
07/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
10/15/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
10/15/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
10/15/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
10/15/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
09/11/2025Interior lighting powerStanislav Pilipenkoenergy_progress
09/11/2025Mechanical SystemsStanislav Pilipenkospecial
09/11/2025Concrete - Cast-In-PlaceStanislav Pilipenkospecial
09/11/2025Exterior Insulation and Finish Systems (EIFS)Stanislav Pilipenkospecial
09/11/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
09/11/2025Heating SystemsStanislav Pilipenkospecial
09/11/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationStanislav Pilipenkospecial
09/11/2025Subgrade InspectionsStanislav Pilipenkospecial
09/11/2025Subsurface Conditions – Fill Placement & In-Place DensityWILLIAM MONTAGUEspecial
09/11/2025Subsurface Investigations (Borings/Test Pits)anthony santorospecial
09/11/2025FinalStanislav Pilipenkoprogress
09/11/2025Footing and FoundationStanislav Pilipenkoprogress
09/11/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
09/11/2025Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
09/11/2025Structural Wood FrameStanislav Pilipenkoprogress
09/11/2025Maintenance informationStanislav Pilipenkoenergy_progress
09/11/2025Fenestration air leakageStanislav Pilipenkoenergy_progress
09/11/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
09/11/2025MeteringStanislav Pilipenkoenergy_progress
09/11/2025Fenestration and door U-factor and product ratingsStanislav Pilipenkoenergy_progress
09/11/2025Air barrier — testing Stanislav Pilipenkoenergy_progress