← Back
Miscellaneous garage
128 KINGS HIGHWAY
BROOKLYN · BIN 3175258
💬 Discuss this project
1925Year Built
1Stories
G9Building Class
R6BZoning
2,115 sfGross Floor Area
3Units
2 Open Violations ▸FDNY Report ↗
Miscellaneous garage · Owner of record: GOODVIEW LLC · 8,567 sf lot · 0.25 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 18 docs
Floor 11p · 1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SD DESIGN STUDIO1007/08/2026
GOODVIEW LLC303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/23/2015$2.0M—— → —$969/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YANG ENGINEERING LLC408/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACER CONSTRUCTION INCGeneral Contractor407/08/2026
QMB PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JIAN ENGINEERING PLLC7397308/14/2025
Building Lifecycle
All (22)Filed (4)Permit Issued (3)Violation (6)Special Inspection (9)
08/26/2025
Permit issued — Plumbing
B01057806-S2-PL
08/14/2025
Filed — Alteration
PROPOSED TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE. REMEDY CURE ECB VIOLATION#: 39110913P. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01057806-S2
08/14/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JIAN DENG
09/18/2024
Permit issued — Construction Fence
B01057806-S1-FN
09/17/2024
Permit issued — General Construction
B01057806-I1-GC-CX
08/09/2024
Filed — Alteration
B01093058-I1
07/15/2024
Special inspection requirement — Interior lighting power
JIAN DENG
07/15/2024
Special inspection requirement — Lighting controls
JIAN DENG
06/24/2024
Special inspection requirement — Structural Steel - Details
JIAN DENG
06/05/2024
Filed — Alteration
PROPOSED TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE. REMEDY CURE ECB VIOLATION#: 39110913P. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01057806-S1
06/05/2024
Filed — Alteration
PROPOSED TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE. REMEDY CURE ECB VIOLATION#: 39110913P. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01057806-I1
05/28/2024
Special inspection requirement — Structural Wood Frame
JIAN DENG
05/28/2024
Special inspection requirement — Final
JIAN DENG
05/28/2024
Special inspection requirement — Structural Steel - High Strength Bolting
JIAN DENG
05/28/2024
Special inspection requirement — Structural Steel - Welding
JIAN DENG
05/28/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JIAN DENG
04/23/2024
Violation issued (ECB, closed)
Construction
04/05/2024
Violation issued (ECB, closed)
Construction
04/05/2024
Violation issued (ECB, closed)
Construction
06/09/2000
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/22/1988
Violation issued (ECB, closed)
Construction
07/06/1988
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedQMB PLUMBING & HEATING INC08/26/2025
DOB NOWConstruction FencePermit IssuedACER CONSTRUCTION INC09/18/2024
DOB NOWGeneral ConstructionPermit IssuedACER CONSTRUCTION INC09/17/2024
1 project · most recent 08/14/2025
Storm
FiledStatusContractorScope
08/14/2025Permit IssuedNYC MAINMAN CORPStorm
1 project · most recent 10/22/2024
FiledStatusContractorScope
10/22/2024CompleteERIC & NG ELEC'L, INC.2 meters, 2 new_meters
1 project · most recent 08/14/2025
Fence
FiledStatusContractorScope
08/14/2025Permit IssuedNYC MAINMAN CORPFence
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
08/14/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJIAN DENGspecial
07/15/2024Interior lighting powerJIAN DENGenergy_progress
07/15/2024Lighting controlsJIAN DENGenergy_progress
06/24/2024Structural Steel - DetailsJIAN DENGspecial
05/28/2024Structural Wood FrameJIAN DENGprogress
05/28/2024FinalJIAN DENGprogress
05/28/2024Structural Steel - High Strength BoltingJIAN DENGspecial
05/28/2024Structural Steel - WeldingJIAN DENGspecial
05/28/2024Structural Stability – Alterations of existing buildingsJIAN DENGspecial
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/24/2026B01093058-I1Request digital key ↗
08/21/2026B01057806-I1Request digital key ↗
08/21/2026B01057806-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWSpecial Inspector Seal & Signature5
08/31/2026B01057806-I1Open ↗
08/31/2026B01057806-I1Open ↗
08/31/2026B01057806-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026B01057806-I1Open ↗
08/13/2026B01093058-I1Open ↗
08/13/2026B01057806-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/31/2026B01057806-I1Open ↗
08/31/2026B01057806-I1Open ↗
08/31/2026B01057806-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWOER: Notice to Proceed3
08/13/2026B01057806-S2Open ↗
08/13/2026B01093058-I1Open ↗
08/13/2026B01057806-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B01057806-I1Open ↗
08/13/2026B01093058-I1Open ↗