← Back
One family attached or semi-detached
128 LIVINGSTON AVENUE
💬 Discuss this project
1996Year Built
2Stories
A5Building Class
R3-1Zoning
1,741 sfGross Floor Area
1Units
One family attached or semi-detached · 2,866 sf lot · 0.61 FAR built · Flood zone X
Locations of Work
Electrical
Roof2p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC107/26/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272107/26/2024
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
01/14/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01084339-I1
08/01/2024
Permit issued — Solar
S01084339-I1-SL
07/26/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01084339-I1
07/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
07/22/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
07/22/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
07/22/2024
Special inspection requirement — Final
Walid Abdulla
07/22/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC08/01/2024
BIS—ISSUEDTAMARA ESTATES, INC.10/16/1996
BISPLISSUEDORMONDE MCCARTY PLBG & HTG09/24/1996
BIS—ISSUEDTAMARA ESTATES, INC.07/03/1996
1 project · most recent 07/26/2024
General Wiring
FiledStatusContractorScope
07/26/2024CompleteSUNRUN SOLAR ELECTL CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/22/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
07/22/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
07/22/2024Energy Code Compliance InspectionsWalid Abdullaprogress
07/22/2024FinalWalid Abdullaprogress
07/22/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026S01084339-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/24/2026S01084339-I1Open ↗
08/24/2026S01084339-I1Open ↗
08/24/2026S01084339-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026S01084339-I1Open ↗
08/24/2026S01084339-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01084339-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01084339-I1Open ↗