DOB02/22/2022FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
DOB05/31/2018FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
HPD05/10/2014SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST AND SOUTH WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 1A LOWER LEVEL, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
HPD05/10/2014SECTION 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATED LOCK AT DOOR AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 1A LOWER LEVEL, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
HPD05/10/2014SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 1A LOWER LEVEL, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
HPD05/10/2014SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE BATHROOM LOCATED AT APT 1A LOWER LEVEL, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
DOB08/16/1993V-DOB VIOLATION - ACTIVE
ECB01/27/20163314.1 PARTIAL STOP WORK ORDER FOR SUPPORTED SCAFFOLD ISSUED PURSUANT TO 28-207.2 AND POSTED AT PREMISES. SUPPORTED SCAFOFLD ARE IN UNSAFE CONDTIONS.NOTE: OBSERVED SUPPORTED SCAFFOLD ERECTED ON TOP OF SIDEWALKNothing owed — awaiting certificate of correction
Condo, residential unit in elevator building · 5,625 sf lot · 2.97 FAR built · Flood zone X500